GovChime
Notice ID: 4cae44d0d3154e49b74d6addf6782f6eAward NoticeAwarded

Horse Creek Work Center Water Line Replacement

Awarded on June 16, 2021. Full description on SAM.gov.

Awarded tounder 1240BH21C0008 (source: SAM.gov award notice)• $399.7K

Overview

Posted
June 17, 2021
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
WILLAMETTE NATIONAL FOREST
Place of performance
McKenzie Bridge, OR, 97413
Last updated
Dec 4, 2025
Award date
Jun 16, 2021
Award amount (SAM.gov award notice)
$399.7K

Identifiers

Solicitation number
1240BH21R0010
Notice ID
4cae44d0d3154e49b74d6addf6782f6e
Award number (PIID)
1240BH21C0008

Description

The work of this Contract includes all labor, equipment and materials required to replace the existing water system at USFS Horse Creek Work Center located on the Willamette National Forest. This project will: 1. Abandon the existing water system (3-Inch diameter main line water pipe) and install approximately 2,770 feet of new 3-inch main line water pipe. Connect existing buildings and new freeze-proof yard hydrants to new main line water pipe. Piping shall be open trench High Density Polyethene (HDPE) pipe material with alternatives to use Polyvinyl Chloride (PVC) pipe material and horizontal boring. Most trenching will be outside of paved areas with limited asphalt and concrete paving to replace removed pavement. Water valves with valve boxes and air release valves will be installed. There are no vaults or water meter work. 2. Install two new Chlorine Analyzers with data loggers. 3. Install new by-pass piping at well in pump house. 4. Replace existing well pump and starter with same size equipment and operation. 5. Install new propane back-up generator for well pump at pump house (exterior stand-alone unit).

Full description on SAM.gov

Award Overview

Award Number

1240BH21C0008

Award Amount (SAM.gov award notice)

$399.7K

Award Date

Jun 16, 2021

Awardee

Awardee UEI

NX34H5ZMG5L7

Original Solicitation

Notice ID: 4cae44d0d3154e49b74d6addf6782f6e

Posted Date: Jun 17, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:1240BH21R0010
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 2×
    Pre-SolicitationMar 23, 2021

    Horse Creek Work Center Water Line Replacement

    Notice ba46179ac24344e8b8ef4e7b04bb017b on SAM.gov

  2. SolicitationApr 7, 2021

    Horse Creek Work Center Water Line Replacement

    Notice ee33a08d30574ad59e0d1d8f41b174f4 on SAM.gov

  3. 2×
    AwardedCurrentJun 17, 2021

    Horse Creek Work Center Water Line Replacement

    Notice 4cae44d0d3154e49b74d6addf6782f6e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240BH21R0010

Archive Date

Jul 1, 2021

Office Address

SPRINGFIELD, OR, 97477