Deschutes National Forest - GAOA Forest Wide Trail Bridge Reconstruction
Archived on December 31, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM PDT
- Posted
- June 5, 2025
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA NORTHWEST 6
- Place of performance
- 97701
- Last updated
- Nov 13, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240BH25Q0022
- Notice ID
- eef15bbbd6f64134bc607e7db7bcb248
Description
This project involves: This work is taking place on the Deschutes National Forest. The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along with all required yard lumber to complete the bridge system, followed by delivery and installation at the existing site. The contractor shall provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems for the construction of two new trail bridges—a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. The East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while the Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at the East Cultus Lake Trail Bridge will include Overlapping Step Systems and borrow material will be placed for the approaches to the Todd Meadow Nordic Trail Bridge. The contractor is responsible for furnishing the sawn timber necessary for constructing Overlapping Step Systems. The magnitude of this construction project is between $100,000 and $250,000. THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the Trail Construction and Maintenance BPA 1240BJ21Q0015. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3PresolicitationArchivedCurrent
Deschutes National Forest - GAOA Forest Wide Trail Bridge Reconstruction