GovChime
Notice ID: 46aaadf1ae084eb8b08e24fa68db5e4cSolicitation

Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest

Archived on December 30, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−08:00
Posted
December 7, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA NORTHWEST 7
Place of performance
Petersburg, AK, 99833
Last updated
Dec 4, 2025

Identifiers

Solicitation number
1240BJ22R0001
Notice ID
46aaadf1ae084eb8b08e24fa68db5e4c

Description

AMENDMENT #0001 - MULTIPLE "UPDATED ATTACHMENTS" GAOA Ideal Cove Trail Reconstruction This amendment updates all contract documents to eliminate Option Item 1, replacement of Hill Lake Bridge and related rest area and trail reconstruction. Option Item 2 which installs two rest areas at midpoints in Ideal Cove Trail has been re-numbered as Option Item 1. This amendment also clarifies installation details for Double Post Sign Base (Sheet 14 of Drawings), clarifies depth of gravel pad and sign location for Saltwater Trailhead (Sheet 15 of Drawings), corrects the Governments intent to award to best value rather than lowest price technically acceptable, and answers one question from the 11/30/2021 pre-proposal meeting regarding gravel size (see attached, 1 page). Amended items in Drawings are indicated by a bubble outline accompanied by a triangle symbol with the number 1 inside and Update below. -------------------------------------------- Amended Documents # of Pages Section B 2 Section C 2 Project Specs 27 Trail Log 8 Drawings 18 Section M 3 __________________________________________________________ DESCRIPTION/SPECIFICATIONS/WORK STATEMENT GAOA Ideal Cove Trail Reconstruction Petersburg Ranger District, Tongass National Forest Petersburg, Alaska PROJECT DESCRIPTION AND LOCATION Description: Base Bid work is the reconstruction of Ideal Cove Trail. Major work items include the demolition of approx. 0.8 mile of existing step-and-run boardwalk and other wood trail structures, salvaging suitable lumber for reuse, and installation of trail structures such as aggregate surfacing, boardwalk bridges, Saltwater Trailhead rest area, retaining logs, stone pitching, stone steps, concrete steps, Type-A boardwalk, and Type B (step-and-run) boardwalk. Optional Item #1 includes demolition and removal of the existing approx. 60 LF log stringer Hill Lake Bridge, installation of a new trail bridge of similar length, installation of Bridge Junction Rest Area, demolition of approx. 80 LF of existing boardwalk trail and installation of aggregate surfacing trail in place of boardwalk. Optional Item #2 is the installation of two aggregate surface rest areas with seating stones at midpoints in Ideal Cove Trail. (b) Location and Facilities: The trailhead is located 15 air miles southeast of Petersburg on the east side of Mitkof Island. The trail begins at Frederick Sound north of Ideal Cove and leads west to its junction with the Three Lakes trail system at a bridge downstream from (east of) Hill Lake. The site is accessible from Petersburg via Mitkof Highway, the Three Lakes Road, and the Sand Lake, Hill Lake, or Crane Lake Trails; a distance of approximately 25 road miles and 2 trail miles to the saltwater trailhead. Petersburg is accessible by scheduled airline service, barge, and is on the Alaska Marine Highway ferry system. There are no utilities at the project site. In 2015 cell phone service was not available from any point along the trail. (c) Government Estimated Price Range: Between $500,000 and $1,000,000. Pre-bid Conference: Section L (Schedulled for November 30, 2021 at 12:30pm (Alaska time) (e) Period of Performance: Estimated to be January 2022 to November 30, 2022. Note: Award will Subject to the Availability of Funds. FAR 52.232-18 SEE ATTACHED SOLICITATION DOCUMENTS FOR FULL SCOPE OF THE REQUIREMENTS

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:1240BJ22R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationOct 28, 2021

    Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest

    Notice 7467f3dd85b345a6b5bb5edc9de1f56c on SAM.gov

  2. 2×
    SolicitationCurrentNov 15, 2021

    Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest

    Notice 46aaadf1ae084eb8b08e24fa68db5e4c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240BJ22R0001

Archive Date

Dec 30, 2021

Office Address

Portland, OR, 972042829