Notice ID: abfcad0e05fb4f32a7e35a83d1048261Award NoticeAwarded
Bridgeport Sewer Replacement
Awarded on September 21, 2021. Full description on SAM.gov.
Awarded tounder 1240LR21C0005 (source: SAM.gov award notice)• $533.3K
Overview
- Posted
- September 21, 2021
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of Agriculture
Notice details
- Place of performance
- Bridgeport, CA, 93517
- Last updated
- Dec 4, 2025
- Award date
- Sep 21, 2021
- Award amount (SAM.gov award notice)
- $533.3K
Identifiers
- Solicitation number
- 1240LR21R0007
- Notice ID
- abfcad0e05fb4f32a7e35a83d1048261
- Award number (PIID)
- 1240LR21C0005
Description
Award Notice
Award Overview
Award Number
1240LR21C0005
Award Amount (SAM.gov award notice)
$533.3K
Award Date
Sep 21, 2021
Awardee
Awardee UEI
GDGRQKR7E3G1
Original Solicitation
Notice ID: abfcad0e05fb4f32a7e35a83d1048261
Posted Date: Sep 21, 2021
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
1240LR21R0007- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJun 22, 2021
Bridgeport Sewer Replacement
- 5×SolicitationJul 12, 2021
Bridgeport Sewer Replacement
- AwardedCurrentSep 21, 2021
Bridgeport Sewer Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Update 0005 is to adjust the estimated solicitation issue date to on or about January 04, 2027 and estimated response date (bid opening) to on or about February 04, 2027. Update 0005 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0004 is to adjust the estimated solicitation issue date to on or about July 20, 2026 and estimated response date (bid opening) to on or about August 20, 2026. Update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0003 is to adjust the estimated solicitation issue date to on or about April 13, 2026 and estimated response date (bid opening) to on or about May 13, 2026. Update 0003 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0002 is to adjust the estimated solicitation issue date to on or about March 13, 2026 and estimated response date (bid opening) to on or about April 13, 2026. Update 0002 is for administrative purposes only, any official amendment will be accompanied by an SF30. Amd 0001 to Notice to add the estimated solicitation issue date of January 23, 2026 and estimated response date (bid opening) February 24, 2026 to the notice. The work includes various maintenance access and pipeline isolation improvements along the existing Brine Discharge Pipeline (16-inch to 30-inch diameters). Construction generally includes the installation of 4 pipeline/access improvements along Goetz Road, 2 pipeline/access improvements along Winter Circle, 4 pipeline/access improvements along the Salt Creek channel and within the Salt Creek Trail, and 2 pipeline/access improvements located inside the Districts Sun City Regional Water Reclamation Facility property. The work also includes cleaning of approximately 13,140 linear feet of the existing Brine Discharge Pipeline. The work is located in the City of Menifee, Riverside County, California. This is a Small Business Set Aside acquisition. This acquisition will be conducted under Federal Acquisition Regulation (FAR)Part 14 Sealed Bid. The estimated magnitude of construction is $5,000,000 - $10,000,000. North American Industry Classification System (NAICS) code - 237110 Water and Sewer System Construction. Size Standard $45,000,000.00. BIDDERS PLEASE NOTE: This project may be delayed, canceled or revised at any time prior to issuance of solicitation, bid opening or contract award. | - | Pre-Solicitation | 02/04/2027 |
The purpose of amendment 1 is to provide answers to questions. See attached QA. LAKE25-101-CC LIFT STATION PUMP REPAIR | - | Solicitation | 06/06/2029 |
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services. | - | Combined Synopsis | 12/01/2026 |
| - | Awarded | Open | |
11/5/2026 - Amendment 0001 has been added. See the attached SF30 and the following attachments: 1. Questions and Answers 2. Map 3. Attachment B Submission Package Revised This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12444627Q0003 is issued as a Request for Quotation (RFQ) for the repair/replacement of a fire hydrant. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110. The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. | - | Combined Synopsis | 11/16/2026 |
Additional Details
Solicitation Number
1240LR21R0007
Archive Date
Oct 6, 2021
Office Address
Ogden, UT, 844012310