Notice ID: abfcad0e05fb4f32a7e35a83d1048261Award NoticeAwarded

Bridgeport Sewer Replacement

Awarded on September 21, 2021. Full description on SAM.gov.

Awarded tounder 1240LR21C0005 (source: SAM.gov award notice)• $533.3K

Overview

Posted
September 21, 2021
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of Agriculture

Notice details

Place of performance
Bridgeport, CA, 93517
Last updated
Dec 4, 2025
Award date
Sep 21, 2021
Award amount (SAM.gov award notice)
$533.3K

Identifiers

Solicitation number
1240LR21R0007
Notice ID
abfcad0e05fb4f32a7e35a83d1048261
Award number (PIID)
1240LR21C0005

Description

Award Overview

Award Number

1240LR21C0005

Award Amount (SAM.gov award notice)

$533.3K

Award Date

Sep 21, 2021

Awardee

Awardee UEI

GDGRQKR7E3G1

Original Solicitation

Notice ID: abfcad0e05fb4f32a7e35a83d1048261

Posted Date: Sep 21, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:1240LR21R0007
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationJun 22, 2021

    Bridgeport Sewer Replacement

    Notice 05464bac918e4ee085b87c4cd2b0c86e on SAM.gov

  2. 5×
    SolicitationJul 12, 2021

    Bridgeport Sewer Replacement

    Notice 3156f53d1ddf44179191b772979e4a99 on SAM.gov

  3. AwardedCurrentSep 21, 2021

    Bridgeport Sewer Replacement

    Notice abfcad0e05fb4f32a7e35a83d1048261 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Update 0005 is to adjust the estimated solicitation issue date to on or about January 04, 2027 and estimated response date (bid opening) to on or about February 04, 2027. Update 0005 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0004 is to adjust the estimated solicitation issue date to on or about July 20, 2026 and estimated response date (bid opening) to on or about August 20, 2026. Update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0003 is to adjust the estimated solicitation issue date to on or about April 13, 2026 and estimated response date (bid opening) to on or about May 13, 2026. Update 0003 is for administrative purposes only, any official amendment will be accompanied by an SF30. Update 0002 is to adjust the estimated solicitation issue date to on or about March 13, 2026 and estimated response date (bid opening) to on or about April 13, 2026. Update 0002 is for administrative purposes only, any official amendment will be accompanied by an SF30. Amd 0001 to Notice to add the estimated solicitation issue date of January 23, 2026 and estimated response date (bid opening) February 24, 2026 to the notice. The work includes various maintenance access and pipeline isolation improvements along the existing Brine Discharge Pipeline (16-inch to 30-inch diameters). Construction generally includes the installation of 4 pipeline/access improvements along Goetz Road, 2 pipeline/access improvements along Winter Circle, 4 pipeline/access improvements along the Salt Creek channel and within the Salt Creek Trail, and 2 pipeline/access improvements located inside the Districts Sun City Regional Water Reclamation Facility property. The work also includes cleaning of approximately 13,140 linear feet of the existing Brine Discharge Pipeline. The work is located in the City of Menifee, Riverside County, California. This is a Small Business Set Aside acquisition. This acquisition will be conducted under Federal Acquisition Regulation (FAR)Part 14 Sealed Bid. The estimated magnitude of construction is $5,000,000 - $10,000,000. North American Industry Classification System (NAICS) code - 237110 Water and Sewer System Construction. Size Standard $45,000,000.00. BIDDERS PLEASE NOTE: This project may be delayed, canceled or revised at any time prior to issuance of solicitation, bid opening or contract award.
-Pre-Solicitation02/04/2027
The purpose of amendment 1 is to provide answers to questions. See attached QA. LAKE25-101-CC LIFT STATION PUMP REPAIR
-Solicitation06/06/2029
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
-Combined Synopsis12/01/2026
-AwardedOpen
11/5/2026 - Amendment 0001 has been added. See the attached SF30 and the following attachments: 1. Questions and Answers 2. Map 3. Attachment B Submission Package Revised This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12444627Q0003 is issued as a Request for Quotation (RFQ) for the repair/replacement of a fire hydrant. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110. The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis11/16/2026