GovChime
Notice ID: 38bf66b63c3d4863b3c59c93c77dc9cfCombined Synopsis/Solicitation

West Fork Mink Creek Trail Bridge 7059-0.3 and 7059-1.5

Archived on June 1, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−07:00
Posted
February 18, 2022
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
321213: Classification Not Available
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 7
Place of performance
Pocatello, 83204
Last updated
Sep 25, 2026

Identifiers

Solicitation number
1240LS22Q0009
Notice ID
38bf66b63c3d4863b3c59c93c77dc9cf

Description

The United States Department of Agriculture (USDA), Forest Service (FS), Intermountain Zone, Caribou-Targhee National Forest has a need for Bridge Materials, including stringers, abutment sill, backing planks, deck, handrail, running planks, and all hardware to attach and assemble these items. Timber elements are to be manufactured (cut and drilled) prior to treatment per specification in the plans. Also included in this purchase are the following: timber sill and abutment anchor bolts and straps. Not included in this purchase are the following: assembly and installation. Materials and treatment shall be according to the specifications in the plans. Dimensions and quantities shall be verified by the vendor and submitted via shop drawings. The required treatment is intended to meet federal law governing hazardous materials and meets current best practices for timbers and dimension lumber which will be installed and permanently exposed outdoors. Prospective offerors are permitted to suggest alternative preservative methods or materials for Government review prior to submitting a quote. Alternative preservatives are acceptable and may be permitted at the Government’s discretion, if they may provide better value to the Government, or have preferred health and safety characteristics. Offerors considering alternative preservatives should be aware the areas of the bridge having high levels of contact by users must use a water-based preservative. Copper Naphthenate Type A is permitted for preservative on the backing boards, sills, stringers, decking, and rail posts. CA-C treated (waterborne preservative) is permitted for the running planks and railings. In addition, the product Kleer Gard 25 is permitted as a preservative for the above ground contact timbers, use category AWPA UC4A Preservative retention levels are not changed: AWPA UC4A (above ground use) – minimum retention of 0.24 pcf AWPA UC4B (permanently in contact with soil) – minimum retention of 0.50 pcf Approved shop drawings are required before fabrication. Quoters should assume award notification by March 7, 2022. Shop Drawings Should be submitted within 7 calendar days of award notification and will be reviewed for conformance with the specifications. Approval of shop drawings that meet specifications will occur within 7 calendar days of submission for Government review. A Free of Heart Center (FOHC) requirement is NOT applicable to these trail bridges. FP-14 is the required standard specification that has superseded FP-03. Delivery is to be “F.O.B.” and “to be assembled by others.” All final shop drawings are to be sealed by a professional engineer registered in the State of Idaho. Delivery of materials shall be by July 15, 2022, in order to meet an installation window of July 15 – September 30. Delivery shall take place Monday-Friday 8:00 a.m. - 5:00 p.m. excluding federal holidays, unless otherwise approved by the Contracting Officer. Notice of delivery by the vendor is required 48 hours in advance to allow for the government to coordinate offloading.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:1240LS22Q0009
  1. Combined Synopsis
  1. 7×
    Combined SynopsisCurrentJan 13, 2022

    West Fork Mink Creek Trail Bridge 7059-0.3 and 7059-1.5

    Notice 38bf66b63c3d4863b3c59c93c77dc9cf on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240LS22Q0009

Archive Date

Jun 1, 2022

Office Address

Ogden, UT, 844012310