Notice ID: 681b70be6f244728aa2ff22d5c2a0738Solicitation
Willow Creek Toilet Replacement Arapaho and Roosevelt National Forests and Pawnee National Grassland
Archived on December 17, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−07:00
- Posted
- November 3, 2021
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- White River National Forest
- Place of performance
- Granby, CO, 80446
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 1240LT22Q0012
- Notice ID
- 681b70be6f244728aa2ff22d5c2a0738
Description
Willow Creek Campground Toilet Replacement Sulphur Ranger District Arapaho and Roosevelt National Forests and Pawnee National Grassland Grand County, Colorado Solicitation Schedule; Solicitation Close Date: 12/02/2021 1700 MST Questions: All questions pertaining to this solicitation MUST be marked: 1282D718Q0012 and submitted in writing and addressed to both the Contracting Officer Repetitive Kamber Box by email at no later than: 11/19/2021 5:00pm MST - No phone calls will be accepted. Quotes: Quotes from this solicitation MUST be marked 1240LT22Q0012 and be submitted in writing to Lonnie D. Root, Contracting Officer via Email to lonnie.root@usda.gov Project Description: The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workmans compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. Rock may be encountered during excavation. Any excess material shall be incorporated and blended into the site. Seed and straw all disturbed areas. Base: This base project consists of the removal and replacement of two (2) existing toilet that were damaged in 2020 fires. The new stick-built toilets shall be double toilets with a concrete vault and constructed superstructure. The replacement toilet will be in the same location as the existing toilets. Option: Line item 5 includes construction of ADA pathways to (3) three toilet structures (two new and one existing) on site. This will include preparation, placing bedding, and leveling. Project Location: From the Sulfur Ranger District Information Office head east on 10-mile Dr. toward US-40 W. Turn left at the 1st cross street onto US-40w and travel for 2.0 miles. Turn right onto US-34 E and travel for 5.2 miles. Turn left onto CO Rd 40 and travel for 3.7 miles to reach Willow Creek Campground at CO Rd 40, Granby, CO 80446. Alternative route through private may be authorized for use if needed by the District Ranger if permit from landowner is completed. From the Sulfur Ranger District information office head east on 10-mile Dr. toward US-40 W. Turn left at the 1st cross street onto US-40w and travel for 2.0 miles. Turn right onto US-34 E and travel for 5.2 miles. If the above alternative access rout is required for construction, it shall be through a private road with FS access agreement. Access scheduling and timing for use shall be coordinated between the Contractor, Sub-Contractors, Suppliers, Forest Service and Landowner. Preferred access timing is on Thursdays between 1000am and 1200pm. There is low hanging sign with a rope to pull it up out of the way if needed. Willow Creek Campground coordinates: 40.142545129077426, -105.95307059587206 Schedule: Installation work must be performed during the period of May 31,2022 May 30, 2023. The Contractor shall provide a work plan and schedule that demonstrates how the work will be completed and in what time frame at the pre work meeting. Contract Officers Technical Representative (COR): Kamber Box Civil Engineer FS-R6-Colville NF-SO Phone: 509-675-5405 Email: kamber.box@usda.gov All Offerors shall be registered in the System for Award Management (www.sam.gov) database to be eligible for award. The Forest Service reserves the right to cancel this Request for Proposals at any time, as wMatyell as to award any or all to either one or a combination of more than one vendor whichever deems most advantageous to the Government.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
1240LT22Q0012- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentNov 3, 2021
Willow Creek Toilet Replacement Arapaho and Roosevelt National Forests and Pawnee National Grassland
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
1240LT22Q0012
Archive Date
Dec 17, 2021
Office Address
GLENWOOD SPRINGS, CO, 81601