GovChime
Notice ID: 936e51b368884cd582872392f5f74ed0Solicitation

GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest

Archived on April 30, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:30 PM UTC−07:00
Posted
February 9, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 8
Place of performance
Stanley
Last updated
Sep 25, 2026

Identifiers

Solicitation number
1240LT23R0002
Notice ID
936e51b368884cd582872392f5f74ed0

Description

AMENDMENT 1-EXTEND CLOSING DATE TO MARCH 9, 2023 AT 1630 MT EMAIL ONLY OF PROPOSALS TO tanya.spanfellner@usda.gov Solicitation Posting Presolicitation Notice GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest DESCRIPTION OF WORK Project Description: Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex. Work will occur at three primary locations as follows: Entrance Area ~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail. Roundabout Area ~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation. Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage. North Shore Area ~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 28-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway. ~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services. Reconstruct the North Shore Day Use Area including site amenities. Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state. Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required. Project Location: From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214. This represents the point of beginning of the Entrance Area. From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area. From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area. From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area. Contract Time: The work anticipated under any contract resulting from this solicitation anticipated start date for administrative and construction preparation tasks- June 5, 2023 August 14, 2023 – anticipated start date for on-the-ground construction. The Project End Date will be October 31, 2024 The magnitude of proposed project is between $1,000,000 and $5,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:1240LT23R0002
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationOct 17, 2022

    GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest

    Notice ab858e20a5cf4708afc6cae39c294169 on SAM.gov

  2. 3×
    SolicitationCurrentJan 12, 2023

    GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest

    Notice 936e51b368884cd582872392f5f74ed0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240LT23R0002

Archive Date

Apr 30, 2023

Office Address

Ogden, UT, 844012310