Notice ID: d34d2d9443704275a7e1d30ac7ba3e60Solicitation
Crested Butte Road Maintenance and Signage
Archived on March 9, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−07:00
- Posted
- January 31, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA INTERMOUNTAIN 8
- Place of performance
- Crested Butte
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 1240LT24Q0019
- Notice ID
- d34d2d9443704275a7e1d30ac7ba3e60
Description
AMENDMENT 0001 - 01/31/2024 - The purpose of this amendment is to update the Schedule of Items. Please replace the original Schedule of Items with the V.2 J.2 Schedule of Items attached. Due date remains the same. No other changes. PROJECT NAME: CRESTED BUTTE ROAD MAINTENANCE AND SIGNAGE DESCRIPTION OF WORK: Work includes, but is not limited to, performing road maintenance, repair, reconstruction, and improvement of Forest Service roads, parking areas, and camping spurs. See Statement of Work for additional details. PROJECT LOCATION: Project areas for maintenance and improvement include: FSR 811, Washington Gulch (including camping areas); FSR 734, Slate River (including camping areas); FSR 738, Brush Creek (including camping areas and trailheads) PRE-PROPOSAL SITE VISIT SCHEDULED? NO, SEE SECTION L. SUBMIT PROPOSALS TO WESTLEY.BISSON@USDA.GOV. DO NOT MAIL PROPOSALS. BID GUARANTEES MUST STILL BE MAILED (PROPOSALS ABOVE $150K). Work must be completed by October 31st, 2024. The 150 days is estimated based on a start date of June 3rd, 2024. If offer is $35k-$150k, a payment bond applies. If offer is over $150k, a bid bond and performance bond applies and the bid bond must be sent to the address noted in Section L via mail and scanned and included with your proposal. Be sure to include the completed J.7 Experience Questionnaire with your proposal to be considered fully responsive!
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Westley Bisson
Documents
No documents available.
Lifecycle
Solicitation:
1240LT24Q0019- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentJan 22, 2024
Crested Butte Road Maintenance and Signage
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The proposed project aims to reduce deferred maintenance at the Niwot Picnic Trailhead, a high‑use recreation site near Ward, Colorado in the BLRA, by improving site accessibility and addressing aging infrastructure. The work will include demolishing and removing existing timber parking barriers and retaining walls; constructing timber steps; building rock retaining walls; creating accessible compacted aggregate trails; renovating existing historic picnic sites; constructing new picnic sites; and revegetating all disturbed areas. | - | Combined Synopsis | 12/17/2026 |
This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected. | - | Solicitation | 11/23/2026 |
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT | - | Combined Synopsis | 12/04/2026 |
Rev1 Q&A Due Date: 11/11/2026 Vendor Questions must be Emailed Directly to the COR: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below. https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su Phone Number: (202) 650-0123 Meeting ID: 898702315# HUMBOLDT TRAIL BRIDGE REPLACEMENT Pacific Coast (PCT) Forest: Humboldt-Toiyabe National Forest (HTNF) Bridgeport Ranger Station The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access. Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience. ATTACHMENTS: C04a ScheduleOfItems_SectionB_1240LT27Q0026 C04b DesignDrawings_1240LT27Q0026 C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026 C04d Experience Questionnaire_1240LT27Q0026 C04e Past Performance Data Sheet_1240LT27Q0026 AWARD SCHEDULE: Site Visit: Friday, November 6 at 10:00am PST on Zoom Q&A Due Date: 11/11/2026 Quotes Due Date: 11/28/2026 - 1700 MT Anticipated Award Date: 12/10/2026 POP: July/01/2027 - 10/29/2027 = 120 days Contracting Officer Representative: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov | - | Combined Synopsis | 11/28/2026 |
PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD | - | Solicitation | 11/13/2026 |
Additional Details
Solicitation Number
1240LT24Q0019
Archive Date
Mar 9, 2024
Office Address
Ogden, UT, 844012310