GovChime
Notice ID: 1212ca9c2d924ccda86e49d3dfada66aCombined Synopsis/SolicitationArchived

GAOA 4FO SMCG Trail Renovation

Archived on April 15, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MDT
Posted
February 25, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
HUMBOLDT-TOIYABE NATIONAL FOREST
Place of performance
Nevada
PSC
Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1240LT26Q0027
Notice ID
1212ca9c2d924ccda86e49d3dfada66a

Description

  1. This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
  2. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
  3. Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
  4. Aggregate base, asphalt and concrete testing per FP-24.
  5. Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
  6. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
  7.  Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
  8. All work to extend asphalt trail and shoulders is inclusive to the option items

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • 1240LT26Q0027.pdf

    127 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Solicitation.docx

    99 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Statement of Work GAOA 4FO SMCG Trail Renovation.docx

    30 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 260202 SMVG Trail Plans_DR_Signed_kwsigned.pdf

    4.6 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Wage Determination Clark County Nevada NV20260024.pdf

    53 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    GAOA 4FO SMCG Trail Renovation

    Notice 1212ca9c2d924ccda86e49d3dfada66a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

1240LT26Q0027

Archive Date

Apr 15, 2026

Office Address

SPARKS, NV, 89431