Notice ID: 1212ca9c2d924ccda86e49d3dfada66aCombined Synopsis/SolicitationArchived
GAOA 4FO SMCG Trail Renovation
Archived on April 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MDT
- Posted
- February 25, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- HUMBOLDT-TOIYABE NATIONAL FOREST
- Place of performance
- Nevada
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240LT26Q0027
- Notice ID
- 1212ca9c2d924ccda86e49d3dfada66a
Description
- This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
- Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
- Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
- Aggregate base, asphalt and concrete testing per FP-24.
- Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
- Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
- Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
- All work to extend asphalt trail and shoulders is inclusive to the option items
Award Overview
Contacts
Contracting Officer
Primary Contact
Derrick Dodson
Secondary Contact
Coby Cubic
Documents
Files (5)
- Download
1240LT26Q0027.pdf
127 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Solicitation.docx
99 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Statement of Work GAOA 4FO SMCG Trail Renovation.docx
30 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
260202 SMVG Trail Plans_DR_Signed_kwsigned.pdf
4.6 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Wage Determination Clark County Nevada NV20260024.pdf
53 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
GAOA 4FO SMCG Trail Renovation
Similar Opportunities
Additional Details
Solicitation Number
1240LT26Q0027
Archive Date
Apr 15, 2026
Office Address
SPARKS, NV, 89431