GovChime
Notice ID: 7e689086fa0f48f7a7d8fa8c92d46c8cCombined Synopsis/SolicitationArchived

Selkirk to Surf Road Maintenance

Archived on October 6, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM PDT
Posted
September 14, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 8
Place of performance
Wenatchee, Washington, 98801
PSC
Z2LB: REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1240LT26Q0115
Notice ID
7e689086fa0f48f7a7d8fa8c92d46c8c

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation.  Quotations are being requested and a separate written solicitation will not be issued. 

Solicitation number 1240LT26Q0115 is issued as a Request for Quotation (RFQ) for Selkirks to Surf project area; with the overall intention to make improvements to trails, bridges, campgrounds, and scenic viewpoints across the North Cascades Recreation Scenic Corridor.

This acquisition  is set-aside for small business concerns.  The applicable North American Industry Classification Standard Code is 237310  The small business size standard is $45M  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency. 

The project is located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest, Okanogan County, Washington. To access the project from Winthrop, WA head west on SR-20 for 13.2 miles, then turn right onto Lost River Road towards Mazama, WA. In 1500 ft, at the stop sign and junction with Goat Creek Road, stay left (northwest) on Lost River Road and proceed 6.8 miles to Beginning of Project (BOP) at MP 0.00 of FSR 5400 Harts Pass Road. BOP of FSR 5400600 Slate Peak Road is at end termini of FSR 5400.


Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than September 14, 2026, at 1:00 PM Pacific Time.

Amendment 0001 has been added to extend the quote due date to NLT September 21, 2026 @ 1:00 PM PT.


All proposals shall be emailed to the Contract Specialist christopher.malley@usda.gov and pps.proposals@usda.gov no later than September 21, 2026, 1:00 PM Pacific Time.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Christopher Malley

Secondary Contact

Documents

Files (10)

  • 1240LT26Q0115 Amendment 0001 - Extension.pdf

    95 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 2 - Statement of Work.docx

    27 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Attachment 3 - Plans.pdf

    25 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 8 - Wage Determination.pdf

    22 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 4 - FSSS - Specifications.pdf

    674 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 1240LT26Q0115 - Selkirk to Surf Road Maintenance.pdf

    772 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 5 - Fire Clauses.pdf

    179 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 7 - Fire Plan.pdf

    97 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 6 - Camping Permit.pdf

    95 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 1 - Schedule of Items.xlsx

    13 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Selkirk to Surf Road Maintenance

    Notice 604e7e726d6944b29ffe5eec047330af on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Selkirk to Surf Road Maintenance

    Notice 69de1f6b4ab6452fa6ccf2acbbd14610 on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    Selkirk to Surf Road Maintenance

    Notice 7e689086fa0f48f7a7d8fa8c92d46c8c on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

1240LT26Q0115

Archive Date

Oct 6, 2026

Office Address

Ogden, UT, 844012310