Upper Baker Installing Trailer Pads and Utilities

Archived on August 25, 2026. Original response deadline: . Full description on SAM.gov.

Description

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.

Utilities –

Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.

Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.

Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

Option Items –

Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.

                      Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Full description on SAM.gov

Overview

Agency:
Department of AgricultureFOREST SERVICE
Office:Manti-Lasal National Forest
Posted:July 7, 2026
NAICS:237110: Water and Sewer Line and Related Structures Construction
Last Updated:Oct 27, 2026
First published:
Last updated on SAM.gov:
PSC:S119: UTILITIES- OTHER
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Combined Synopsis/Solicitation
Place of Performance:Monticello, Utah, 84535

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Derrick A Dodson

Secondary Contact

Documents

Files (9)

  • C04 SF-1442 1240LT26Q0126.pdf

    100 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 1240LT26Q0126.docx

    93 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 SOW 1240LT26Q0126.docx

    19 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 Merged Specs 1240LT26Q0126.docx

    146 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 Project Map 1240LT26Q0126.pdf

    64 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 trailer pad 1240LT26Q0126.pdf

    814 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 Utility Plan 1240LT26Q0126.pdf

    256 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 water details 1240LT26Q0126.pdf

    545 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C04 WD San Juan County Utah 1240LT26Q0126.pdf

    62 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Upper Baker Installing Trailer Pads and Utilities

    Notice 951967d44bd44757925a825597357cf3 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

1240LT26Q0126

Archive Date

Aug 25, 2026

Office Address

PRICE, UT, 84501