Upper Baker Installing Trailer Pads and Utilities
Archived on August 25, 2026. Original response deadline: . Full description on SAM.gov.
Description
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.
Utilities –
Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.
Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.
Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.
Option Items –
Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.
Crushed Aggregate – Grade G Road Base for the trailer pads and roadway
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
C04 SF-1442 1240LT26Q0126.pdf
100 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 1240LT26Q0126.docx
93 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 SOW 1240LT26Q0126.docx
19 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 Merged Specs 1240LT26Q0126.docx
146 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 Project Map 1240LT26Q0126.pdf
64 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 trailer pad 1240LT26Q0126.pdf
814 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 Utility Plan 1240LT26Q0126.pdf
256 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 water details 1240LT26Q0126.pdf
545 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 WD San Juan County Utah 1240LT26Q0126.pdf
62 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Upper Baker Installing Trailer Pads and Utilities
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
1240LT26Q0126
Archive Date
Aug 25, 2026
Office Address
PRICE, UT, 84501