REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS
Archived on October 8, 2026. Original response deadline: . Full description on SAM.gov.
Description
The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein.
-
- The Contractor shall provide services for the following tasks marked by an “X”:
[X] Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates for Base and both options.
[X] The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete and pour new concrete drainage that is approximately 6ft x 48ft x 6” inches in depth for building #11. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary. The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the drainage to run off towards the north elevation. Contractor to cut in grooves that are to the satisfaction of the COR onsite.
[X] Option 1: Bldg#28 south side: Demo old Concrete pad approximately 25ft. wide by 30ft. in length by 6 inches in depth with all associated landscaping, fill, re-bar and materials and install new concrete pad. Cut groves into the concrete on slopes like currently exists. Reinstall drainpipe and work around pea rock roof
[X] Option 2: Bldg#12 east side: The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete sections and pour new concrete ramp that is approximately 28ft. x 90ft x 6” inches in depth. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary. The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the upper ramp elevation area and cut in heavy grooves as presently exist that are to the satisfaction of the COR onsite. Existing railings shall be removed and a new one installed and cemented in with the concrete.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Files (5)
- Download
1240LT26Q0182.pdf
152 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 1240LT26Q0182.docx
103 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 SOI 1240LT26Q0182.xlsx
9.6 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 SOW 1240LT26Q0182.docx
10 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04 WD Morton County ND 1240LT26Q0182.pdf
63 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
1240LT26Q0182
Archive Date
Oct 8, 2026
Office Address
Ogden, UT, 844012310