Notice ID: fd74644c85b04569943ffd8ffc24e11aCombined Synopsis/Solicitation
Waste Water, Lagoon Operations
Archived on July 21, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- June 15, 2021
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 221320: Sewage Treatment Facilities
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA EAST 1
- Place of performance
- VA, 24354
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 12443921Q0034
- Notice ID
- fd74644c85b04569943ffd8ffc24e11a
Description
Intent is to award base and 4 option years Please put Solicitation number is subject line Grindstone Campground wastewater lagoon in strict accordance with the parameters outlined in the Commonwealth of Virginias Department of Environmental Quality VPDES Permit Number VA0022993, Grindstone Recreation Area Sewage Treatment Plant, Smyth County (included). Work will be conducted on an as-needed basis, with both the Forest Service COR and the contractor acting as monitors of the wastewater lagoons water level. When the water level approaches the top of the lagoon liner, discharge will be needed. The contractor must always ensure that the above-mentioned VPDES Permit is adhered to and that flow, pH, BODs, Suspended Solids, Ammonia Nitrogen, Dissolved Oxygen, and Total Residual Chlorine are monitored and recorded per VA DEQ requirements. The Forest Service will provide chlorination and de-chlorination tablets and anti-algae bacterial additive. Contractor will be required to furnish all necessary transportation and labor, as well as testing supplies and equipment. Testing parameters, record keeping, and reporting must be in compliance with VPDES Permit Number VA0022993 and are clearly outlined therein. The contractor will find all necessary information for successful lagoon discharge in the Permit. The past operation of this facility indicates that discharging the lagoon requires as many as 25 consecutive days of operator presence, dependent upon water level and precipitation. The contracted operator must be present at the Plant on discharge days to monitor flow. These 25 days of discharge may be repeated as many as 4-5 times a calendar year. Contractor Responsibility: Contractor to furnish its own insurance.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12443921Q0034- Combined Synopsis
- Combined SynopsisCurrentJun 15, 2021
Waste Water, Lagoon Operations
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
12443921Q0034
Archive Date
Jul 21, 2021
Office Address
Atlanta, GA, 303092449