Notice ID: e54d982b0b8d45f7a9d1d37437a6dad0Special Notice
12444821R0004 Forest Product Labs Furnishing
Archived on August 9, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- July 23, 2021
- Notice type
- Special Notice
- Set-aside
- Local Area Set-Aside (FAR 26.2)
- NAICS
- 541410: Interior Design Services
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE
- Place of performance
- Madison, WI, 53726
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 12444821R0004
- Notice ID
- e54d982b0b8d45f7a9d1d37437a6dad0
Description
NAICS Code: 541410 The U.S. Forest Service, under the authority of the FAR Subpart 13.5 authority of 41 U.S.C. 1901; (modified FAR 6.302-1), intends to issue a firm fixed price, sole source purchase order to CREATIVE BUSINESS INTERIORS for Furnishings for the Forest Product Labs. The existing footprint of the space cannot be modified. NO SOLICITATION OR REQUEST FOR QUOTE IS AVAILABLE. Contractor selected is capable of supplying the requirements because of their experience within this field of study and have the necessary skills to adequately provide these services. Contractor selected also has explicit and intimate knowledge of the specific project for which those services are required. Notwithstanding, interested parties who believes they are capable of meeting Forest Service requirements as stated herein may submit a response that shows clear and convincing evidence that competition would be advantageous to the Government in future procurements. This notice is not a request for competitive proposals or a solicitation of offers. A determination not to compete the proposed Purchase Order based upon the responses is solely within the discretion of the Government. All questions should be directed to David Easter via email to david.easter@usda.gov no later than 11:59 am CST 5 calendar days after the date of this announcement. Telephone inquiries are discouraged.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12444821R0004- Special NoticeCurrentJul 23, 2021
12444821R0004 Forest Product Labs Furnishing
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
CANCELLATION OF SOLICITATION NOTICE: 191N6026Q0008 – PR16205552 - Physical space design and furnishing work at American Center Chennai This solicitation is being cancelled at the convenience of the U.S. Government. | - | Special Notice | 10/28/2026 |
SOURCES SOUGHT SYNOPSIS The Department of Veterans Affairs is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support a requirement for Elevator Testing Services located at FHCC VAMC , North Chicago IL. o Captain James A. Lovell Federal Health Care Center, North Chicago, IL. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 341350. THERE IS NO SOLICITATION AT THIS TIME. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. Background: The purpose of this Contract is to provide for the inspection/testing of the vertical transportation system located at the Captain James A. Lovell Federal Health Care Center ( FHCC ), 3001 Green Bay Road, North Chicago, IL 60064-3048, as set forth in this Performance Work Statement. A complete listing of all vertical transportation system components, including thirty-one (31) elevators, two (2) cart lifts, and two (2) dumbwaiters (collectively VTS components ), is set forth in the Vertical Transportation System Schedule at the end of this Performance Work Statement. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Schedule at price(s) consistent with the current Price Schedule. A complete listing of all VTS Components, including twenty-nine (31) elevators, two (2) cart lifts, and two (2) dumbwaiters, is set forth in the Vertical Transportation System Schedule at the end of this Statement of Work. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Inventory at price(s) consistent with the current Price Schedule. If your organization has the potential capacity to perform these contract services, please provide the following information: 1) Organization name, address, email address, website address, if applicable, telephone number, and size and type of ownership for the organization; and 2) Tailored capability statements addressing the particulars of this effort and documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements. The Government will evaluate market information to ascertain potential market capacity to provide services consistent in scope and scale with those described in this notice and otherwise anticipated. BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SDVOSB. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by 10:00AM Local Time (Central) on November 11th, 2026. All responses under this Sources Sought Notice shall be emailed to Michelle.Klug2@va.gov. STATEMENT OF WORK Inspections Overview: The Contractor shall perform Annual Category 1, Semiannual, and Full-Load Category 5 VTS component inspection/testing as follows: a. Annual Category 1 inspection/testing is typically conducted in May of each year; a. Semiannual inspection/testing is typically conducted in November of each year; and b. Full-Load Category 5 testing will be performed in November 2027. c. Note: Typical inspection/testing dates are subject to change, in FHCC s sole discretion. Basic Contractor Responsibilities: The Contractor shall provide all personnel, equipment, material, parts, software, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for execution of the work to be performed under this Contract. Any work found to be non-conforming to the terms of this Contract shall be promptly corrected by the Contractor at no additional cost to the Government. All work shall be performed in a neat and professional manner, including the removal of all trash and debris at the completion of all work. Contractor Limitations: The Contractor performing inspection/testing under this Contract is prohibited from performing any repairs or other work on any of the VTS components covered by this Contract. Safety: All work performed under this Contract shall conform to such safety precautions as the FHCC Fire/Safety and Engineering Departments determine, in their sole discretion, to be necessary, in addition to all other requirements set forth elsewhere in the Contract. Inspection/Testing Standards. 1. All inspection/testing of FHCC s vertical transportation system components shall comply with the most current version of the following standards: a. American Society of Mechanical Engineers ( ASME ) 17.1: Handbook on Safety Code for Elevators and Escalators; b. ASME 17.2: Guide for Inspection of Elevators, Escalators, and Moving Walks; c. ASME 17.3: Safety Code for Existing Elevators and Escalators; d. National Fire Protection Association ( NFPA ) 70: National Electrical Code; and e. NFPA 70E: Standard for Electrical Safety in the Workplace. 2. During any inspection/testing, parts shall be removed and equipment cleaned, as necessary, to determine their exact condition. All parts shall be properly reinstalled after removal. 3. All inspections shall be performed in the presence of an elevator maintenance technician, currently under contract as the VA elevator maintenance contractor, and the COR or designated FHCC representative. 4. Immediately following the conclusion of each inspection/testing, the Contractor shall brief the COR or designated FHCC representative regarding the inspection/testing results, including without limitation: code violations, safety concerns, and immediate maintenance needs. 5. The COR, in the COR s sole discretion, may reject any work performed under this Contract that is noncompliant with any of the requirements set forth in this Contract. All rejected work shall be corrected as quickly as reasonably possible at no additional expense to the Government. Inspection Checklists: The Contractor shall provide a fully completed inspection checklist applicable to each VTS component using the Checklist for Inspection of Electric Elevators The comments section of each checklist shall include a. If the VTS component is safe operating condition; a. If the VTS component will perform in accordance with Original Equipment Manufacturer ( OEM ) standards; b. Whether the VTS component has been altered, except in conformity with all applicable standards set forth in this Contract; c. If the VTS component has any deficiencies, referencing the appropriate standard as applicable; and d. Whether there are any recommended VTS component repairs or upgrades. e. Documentation. Upon completion of the inspection/testing of all FHCC s VTS components, the Contractor shall provide a report within thirty (30) days to the COR and other FHCC personnel as directed. The report shall be electronically submitted in pdf format utilizing word processing to the maximum extent practicable; individual file size shall not exceed 7 MB. Each report should include: Certificates of Inspection: The Certificate of Inspection for each VTS component shall include the following information: a. Location (building and city/state); a. Identification number; b. Capacity; c. Speed; d. Date of inspection; e. Name of inspector and company; f. Inspector s signature; and g. Inspector s Qualified Elevator Inspector ( QEI ) number. Scheduling Inspection/Testing: The Contractor shall coordinate a mutually agreeable time with the COR at least thirty (30) days prior to the typical inspection months, as defined above. Hours for Inspection/Testing: All work performed under this Contract shall be performed during normal hours of facility operation, as defined below, except for inspection/testing that, in the COR s judgment, may severely impact elevator service. Inspection/testing that severely impacts elevator service shall be conducted after normal hours of facility operation at no additional cost to the Government. Reinspection: If any VTS component(s) require reinspection, the Contractor shall: a. Provide a quote to the COR for the reinspection(s) at a price consistent with the Price Schedule s Unit Price for the current contract period; and a. Coordinate reinspection(s) with the COR only after a Contract Modification has been awarded authorizing such reinspection. b. Inspector Qualifications. Inspectors performing VTS component inspection/testing under this Contract shall be a currently certified Qualified Elevator Inspector by an ASME-accredited organization, in accordance with ASME QEI-1: Standard for the Qualification of Elevator Inspectors. Inspectors performing work under this Contract shall be regularly employed by the Contractor. The Contractor shall provide a copy of each inspector s QEI-1 certification to the COR prior to any VTS component inspection/testing being performed. c. Scheduling. d. On-Site Work Requirements. In addition to any other requirements set forth in this Contract, the Contractor shall comply with the following on-site work requirements: Contractor Orientation/Training: The Contractor shall attend an orientation prior to beginning any work under this Contract, at the COR s discretion. This orientation may include the following topics: Contract terms and conditions; performance monitoring; badging procedures; safety; fire procedures; severe weather procedures; disease transmission; infection control; disaster procedures; and any other topic deemed necessary by the COR. At the COR s discretion, the Contractor may be responsible for providing some or all this information/training to its employees, as directed by the COR. Check-in/Check-out Requirements: The Contractor shall comply with all facility check-in and screening requirements. Upon successful completion of the facility s check-in and screening process, the Contractor shall check-in with the COR, or the COR s designee, advising them of the nature and location of the work to be accomplished. The Contractor shall check-out with the COR, or the COR s designee, at the conclusion of such work, prior to departing the VA facility, advising them of the work completed and any problems/issues identified. Hours of Operation: Normal hours of facility operation ( Business Hours ) are Monday through Friday, 7:00 a.m. 3:30 p.m. Local Time, except for the following Federal Holidays: a. New Year s Day; a. Birthday of Martin Luther King, Jr.; b. Washington s Birthday; c. Memorial Day; d. Juneteenth National Independence Day; e. Independence Day; f. Labor Day; g. Columbus Day; h. Veterans Day; i. Thanksgiving Day; j. Christmas Day; **** Any other day declared a Federal Holiday by Presidential Proclamation**** Noninterference with Facility Functions: The Contractor shall perform its services under this Contract in a manner that does not interfere with the facility s functions, including maintaining all tools and equipment in an orderly fashion and cleaning the work area at the conclusion of a service visit. The Contractor shall interrupt its work at any time to not interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts. In the event of an emergency, Contractor MANUFACTURER TYPE ELEVATOR # LOCATION Inspection Frequency 1 SMARTRISE/HW TRACTION P-1 BLDG. 133 CA Annual May/Semi-Annual November 2 SMARTRISE/HW TRACTION P-2 BLDG. 133 CA Annual May/Semi-Annual November 3 SMARTRISE/HW TRACTION P-3 BLDG. 133 CA Annual May/Semi-Annual November 4 MID-AMERICAN TRACTION P-4 BLDG. 131 Annual May/Semi-Annual November 5 MID-AMERICAN TRACTION P-5 BLDG. 131 Annual May/Semi-Annual November 6 SMARTRISE/HW TRACTION P-7 BLDG. 133 Annual May/Semi-Annual November 7 SMARTRISE/HW TRACTION P-8 BLDG. 133 Annual May/Semi-Annual November 8 SMARTRISE TRACTION P-10 BLDG. 134 Annual May/Semi-Annual November 9 SMARTRISE TRACTION P-11 BLDG. 134 Annual May/Semi-Annual November 10 SMARTRISE TRACTION P-13 BLDG. 135 Annual May/Semi-Annual November 11 SMARTRISE TRACTION P-18 BLDG. 1 Annual May/Semi-Annual November 12 MID-AMERICAN HYDRAULIC P-20 BLDG. 46 Annual May/Semi-Annual November 13 MID-AMERICAN TRACTION P-21 BLDG. 66 Annual May/Semi-Annual November 14 MID-AMERICAN TRACTION P-22 BLDG. 7 Annual May/Semi-Annual November 15 MID-AMERICAN HYDRAULIC P-23 BLDG. 4 Annual May/Semi-Annual November 16 MID-AMERICAN HYDRAULIC P-24 BLDG. 133 Annual May/Semi-Annual November 17 SCHUMACKER ELEVATOR HYDRAULIC P-25 PARKING GARAGE 195 Annual May/Semi-Annual November 18 SCHUMACKER ELEVATOR HYDRAULIC P-26 PARKING GARAGE Annual May/Semi-Annual November 19 SCHUMACKER ELEVATOR HYDRAULIC P-1 BLDG. 133EF Annual May/Semi-Annual November 20 SCHUMACKER ELEVATOR HYDRAULIC P-2 BLDG. 133EF Annual May/Semi-Annual November 21 SMARTRISE HYDRAULIC S-1 BLDG. 133CA Annual May/Semi-Annual November 22 SCHUMACKER ELEVATOR HYDRAULIC S-1 BLDG. 133EF Annual May/Semi-Annual November 23 SCHINDLER HYDRAULIC S-2 BLDG. 6 Annual May/Semi-Annual November 24 SCHINDLER HYDRAULIC S-3 BLDG. 6 Annual May/Semi-Annual November 25 MID-AMERICAN TRACTION S-6 BLDG. 131 Annual May/Semi-Annual November 26 SMARTRISE TRACTION S-9 BLDG. 133 Annual May/Semi-Annual November 27 SMARTRISE TRACTION S-12 BLDG. 134 Annual May/Semi-Annual November 28 SMARTRISE TRACTION SF-14 BLDG. 135 Annual May/Semi-Annual November 29 KONE TRACTION P-27 PARKING GARAGE 196 Annual May/Semi-Annual November 30 TAC32H HYDRAULIC 556FH-ELEV-001-CO100 CORRIDOR 100 Annual May/Semi-Annual November 31 SMARTRISE HYDRAULIC 5-ELEV-E1-CO101 CORRIDOR 101 Annual May/Semi-Annual November FHCC VERTICAL TRANSPORTATION SYSTEM SCHEDULE ELEVATORS CART LIFTS MANUFACTURER CART LIFT # LOCATION INSPECTION FREQUENCY 1 LIFT-O-MATIC CART LIFT 1 BLDG. 133CA Annual May/Semi-Annual November 2 LIFT-O-MATIC CART LIFT 2 BLDG. 133CA Annual May/Semi-Annual November DUMBWATIERS DUMBWAITER # LOCATION INSPECTION FREQUENCY 1 DUMBWAITER 1 BLDG. 133 Annual May/Semi-Annual November 2 DUMBWAITER 2 BLDG. 133CA Annual May/Semi-Annual November | - | Market Research | 11/11/2026 |
Arc Flash Hazard Analyses Scope of Work General Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements The Arc Flash Hazard Analyses will consist of the following phases or requirements: Data Gathering and Field Verification Contractor shall: Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable): Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal. Data collection requires the removal and/or opening of equipment to field verify data. Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc. Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included: Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard. The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available. A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report. Arc Flash Hazard Analyses Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include: Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study. Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include: Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations. Submittals Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following: Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats. SKM Compatible Data Import Files. Supplemental Report: Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies. Project Duration Contractor shall complete all work within 180 days of notice to proceed. Scheduling Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date. | - | Special Notice | 11/02/2026 |
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | - | Combined Synopsis | 11/16/2026 |
Purpose The Department of Veterans Affairs (VA) is conducting market research in accordance with FAR Part 10 to determine the availability and capability of qualified small and large business concerns to provide psychological assessment services in support of a multi-site PTSD clinical research study. This notice is for market research purposes only and does not constitute a solicitation, request for proposal (RFP), or commitment by the Government to award a contract. Requirement Description The VA requires contractor support to provide independent psychological assessment services for participants enrolled in a multi-site clinical trial Hybrid Implementation and Non-Inferiority Testing of Group Versus Individual Written Exposure Therapy (WET) for posttraumatic stress disorder (PTSD), in a group format compared to the established individual format.. The contractor shall provide qualified evaluators to conduct structured diagnostic assessments remotely with access to HIPAA-compliant Box so that contractor can receive participant contact information securely and can transmit interview scores securely back to VA. For more information on Box, please see https://digital.va.gov/marketplace/product/box/ Must also have access to HIPAA-complaint video conferencing for conducting the interviews themselves and must be overseen by PhD-level clinical psychologists to ensure ongoing high quality practice. Participants must complete standardized diagnostic assessments at baseline, post-treatment, and three-month follow-up. These assessments include the Clinician-Administered PTSD Scale for DSM-5 (CAPS-5) and the Mini International Neuropsychiatric Interview (MINI), both of which require administration by trained and qualified clinicians.. The anticipated effort includes approximately: 150 baseline CAPS-5 and MINI assessments 128 post-treatment CAPS-5 assessments 128 three-month follow-up CAPS-5 assessments Total projected assessments: approximately 414. Minimum Capability Requirements Interested firms should demonstrate their ability to: Provide master's- or doctoral-level clinicians trained in the administration of: Clinician-Administered PTSD Scale for DSM-5 (CAPS-5) Mini International Neuropsychiatric Interview (MINI) Recruit, train, supervise, and maintain an adequate pool of independent evaluators to support multiple research sites. Conduct assessments using HIPAA-compliant video conferencing technology. Securely receive and transmit participant information and assessment results using approved secure file-sharing platforms. Conduct quality assurance and fidelity monitoring activities to ensure consistency and reliability of assessments. Maintain compliance with applicable human subjects research requirements and regulatory training requirements. Provide oversight by doctoral-level clinical psychologists with expertise in PTSD assessment and diagnosis. Requested Information Interested vendors shall submit a capability statement not to exceed five (5) pages that includes: Company name, UEI, CAGE code, and business address. Business size and socioeconomic status under the applicable NAICS code(s). Experience providing psychological assessment services for: PTSD research studies Multi-site clinical trials Federal agencies Veterans or military populations Experience administering CAPS-5 and MINI assessments. Description of quality control and assessment fidelity procedures. Description of available staffing resources and evaluator qualifications. Recommended NAICS code(s) and rationale for why the code accurately describes the principal purpose of the requirement. Any existing contract vehicles available for ordering these services. NAICS Code The Government is considering the following NAICS codes: 621330, Offices of Mental Health Practitioners (except Physicians) 541990, All Other Professional, Scientific, and Technical Services Respondents are encouraged to identify the NAICS code they believe best represents the principal purpose of the requirement and provide supporting rationale. Submission Instructions Interested parties shall submit capability statements via email only to: Ann Marie Stewart Contracting Officer Email: annmarie.stewart@va.gov Responses are due no later than October 29, 2026, at 3:00 PM EDT. | - | Market Research | 10/29/2026 |
Additional Details
Solicitation Number
12444821R0004
Archive Date
Aug 9, 2021
Office Address
SAINT PAUL, MN, 55108