GovChime
Notice ID: 11572ec20cd54f90b357cd37b97711beAward NoticeAwarded

US Forest Service_ Delta National Forest 717 Culvert Replacement

Awarded on December 15, 2021. Full description on SAM.gov.

Awarded tounder 12445122C0003 (source: SAM.gov award notice)• $104.3K

Overview

Posted
December 15, 2021
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of Agriculture

Notice details

Place of performance
Yazoo City, MS, 39194
Last updated
Dec 4, 2025
Award date
Dec 15, 2021
Award amount (SAM.gov award notice)
$104.3K

Identifiers

Solicitation number
12445122Q0001
Notice ID
11572ec20cd54f90b357cd37b97711be
Award number (PIID)
12445122C0003

Description

This Request for Quote (RFQ) is issued pursuant to FAR 13 by the United States Department of Agriculture (USDA), Forest Service (FS), on behalf of the Delta National Forest, Holly Bluff, Mississippi. (Sharkey County 39088). Type of Contract: This is an Invitation for Bid (IFB) which will result in award of a firm-fixed price contract. Award will be made to the lowest priced responsive/responsible bidder. Set Aside: The project is set-aside 100% for small businesses. The associated NAICS of this acquisition is 237310 - Highway, Street, and Bridge Construction. PSC Code Z2LB - Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways Magnitude: In accordance with FAR 36.204, the magnitude of this project is: magnitude of this project is: (c) Between $100,000 and $250,000 Location: Project Name and Location: Project Name and Location: The project location is 2.5 miles west of Holly Bluff, Mississippi. (Sharkey County 39088). 32.831348, -90.759575 ; https://www.google.com/maps/place/32%C2%B049'52.9%22N+90%C2%B045'34.5%22W/@32.831353,-90.7596206,100m/d 90.7083136!3m5!1s0x0:0x0!7e2!8m2!3d32.8313479!4d-90.7595746?hl=en Scope of Work: The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and supervision required to complete the work per the plans, specifications, and terms of the contract. See the SOW for specific details not included under this paragraph This project will replace two 60 x 40 corrugated metal pipe culverts with two 60 x 68 16 gage polymer coated corrugated metal pipe culverts on Road 717 on the Delta National Forest. Road 717, an aggregate surfaced road, is located on the county line between Sharkey and Yazoo Counties, Mississippi. Four culverts in the roadside ditches will be replaced to provide access to the adjacent land. The basins at each end of the 60 culverts will be armored with riprap and new 30 X 50 roadside ditch culverts will be installed to empty into those basins. The project location is 2.5 miles west of Holly Bluff, Mississippi. Remove the existing culverts and properly dispose of them off national forest property. Remove the existing gate and posts to the northwest of the culverts, taking care not to damage them, and place them in the adjacent wooded area outside the construction limits. Install the 60 culverts at the same alignment as the existing culverts (about a 6 left forward skew looking north), with invert elevations as shown on the plans. Install the 30 roadside ditch culverts as shown in the plans. Supplement the suitable excavated material with select borrow as needed and backfill the culverts as shown on the plans. Armor the inlet and outlet basins as shown in the plans with 200 lb. riprap over geotextile filter fabric. Any excavated material not suited for backfill is to be properly disposed of off national forest property. Place a 6 compacted layer of #610 (crusher run) crushed limestone aggregate over the excavated area of the roadbed to a width of 16 . Grade the edges to pull all aggregate back into the travel way and leave a straight, uniform edge, and grade the aggregate to create a smooth, uniform surface and compact. There will be no surfacing over the 30 culverts. On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acre, 13-13-13 fertilizer at 500 pounds per acre, and straw mulch at 3,200 pounds per acre. No tackifier is required on the mulch. If seeding is done from September 15 to March 15, in addition to the above spread rye grass seed at the rate of 80 pounds per acre. Applicable specifications may be found in FHWAs FP-14 and the attached supplemental specifications. Benchmark: N.I.B. 8 Red Oak tree, 105 NW of the intersection of the CL of the road and CL of the existing culverts. Elevation = 89.56 . Dates: Issuance of the Request for Quotation (RFQ) 11/01/2021; Award Date 12/15/2021 Completion Date 90 Days after NTP

Full description on SAM.gov

Award Overview

Award Number

12445122C0003

Award Amount (SAM.gov award notice)

$104.3K

Award Date

Dec 15, 2021

Awardee

Awardee UEI

K8BLK8K37ZG5

Original Solicitation

Notice ID: 11572ec20cd54f90b357cd37b97711be

Posted Date: Dec 15, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12445122Q0001
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationOct 13, 2021

    US Forest Service_ Delta National Forest 717 Culvert Replacement

    Notice 5658bbda657c46f597098b9f3a26787b on SAM.gov

  2. 4×
    SolicitationNov 1, 2021

    US Forest Service_ Delta National Forest 717 Culvert Replacement

    Notice 59f58e20fd0549988effc5fd8c492116 on SAM.gov

  3. AwardedCurrentDec 15, 2021

    US Forest Service_ Delta National Forest 717 Culvert Replacement

    Notice 11572ec20cd54f90b357cd37b97711be on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12445122Q0001

Archive Date

Dec 30, 2021

Office Address