GovChime
Notice ID: b24b1bb7a45a407c92129ba4f6c4cfa7Solicitation

US Forest Svc, Ozark NF, Spring Lake Dam (SLD) Pedestrian Walkway Improvements

Archived on October 3, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
September 5, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA EAST 11
Place of performance
Paris, 72855
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12445124B0020
Notice ID
b24b1bb7a45a407c92129ba4f6c4cfa7

Description

ALT/REPAIR: All work to be performed under the awarded contract will be in accordance with requirements, including specifications and drawings provided for this project. Project Title(s): Spring Lake Dam (SLD) Pedestrian Walkway Improvements Original Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS: 237990 - Other Heavy and Civil Engineering Construction / PSC Z2KA Repair Or Alteration Of Dams $45M This is a Invitation for Bid (IFB) will result in award of a firm-fixed price contract. Award will be made using a Lowest Price responsive/responsible evaluation. Magnitude: (d) Between $250,000 and $500,000. Location(s): This project area is in the Spring Lake Recreation Area, approximately 4 miles north of Belleville, Arkansas; in Section 27, Township 6 North, Range 23 West, Yell County, Arkansas Scope of Work (summarized): This project includes improvements to the Spring Lake Dam Recreation Area Pedestrian Walkway. The project includes replacement of the existing concrete walkway, improves safety features including the handrails, replaces an existing potable waterline, and rehabilitates the existing Dam stone masonry piers. The original masonry gravity dam structure, located on the southerly end of Spring Lake, was built in 1938. The existing walkway is sited on top of the dam. The walkway is supported on the dam's stone and mortar piers which includes a total of 15 spans. The walkway was constructed of reinforced, poured in place, concrete panels which sit on concrete edge beams. These edge beams are embedded into the stone piers at the ends. The walkway sides have handrails and chain-link fencing. SCHEDULE: SITE VISIT: 8/23/2024; Time: 10:00 CT; Location: Spring Lake Dam Recreation Area Pedestrian Walkway POC: POC: Scott Leonard, 479-438-9387, scott.leonard@usda.gov LAST DAY FOR QUESTIONS: 9/05/2024 BIDS DUE: 09/18/2024 1200CT PERIOD OF PERFORMANCE: 270 Days (negotiable) Submittal Method: All bids will be emailed to steven.alves@usda.gov; cc: cynthia.granderson@usda.gov. You may call 859-334-0524 to confirm receipt

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:12445124B0020
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 24, 2024

    US Forest Svc, Ozark NF, Spring Lake Dam (SLD) Pedestrian Walkway Improvements

    Notice 93750a3a8df64d0a89f6e92d85fdeeaa on SAM.gov

  2. 4×
    SolicitationCurrentAug 9, 2024

    US Forest Svc, Ozark NF, Spring Lake Dam (SLD) Pedestrian Walkway Improvements

    Notice b24b1bb7a45a407c92129ba4f6c4cfa7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12445124B0020

Archive Date

Oct 3, 2024

Office Address

Atlanta, GA, 303092449