GovChime
Notice ID: 1df771edcb26423a86c9fbe72d4e3e90Solicitation

La Mina and Big Tree Trail Rehabilitation Construction Project

Archived on May 10, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−04:00
Posted
March 24, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA EAST 12
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12445222R0011
Notice ID
1df771edcb26423a86c9fbe72d4e3e90

Description

Update 3/24/2022: The purpose of this update is to incorporate Amendment P00001 into the solicitation. All other terms and conditions remain the same. Update 3/17/2021: An amendment to the solicitation is forthcoming. The purpose of the amendment is to: 1. Revise the drawings to remove options. 2. Add two site visit dates and include a cutoff date for questionss 3. Extend the POP from 180 days to 18 monnths //break// The U.S. Forest Service is soliciting offers for a single award, firm-fixed price contract type with an estimated magnitude for the base and options between $1,000,000 and $5,000,000. The Government anticipates awarding a sole contract for La Mina and Big Tree Trail Rehabilitation Construction Project located in El Yunque National Forest, Puerto Rico. Additional awards, at Forest Service discretion, may be considered depending on Forest Service need and results for proposal evaluations. Prospective offerors are required to submit proposals in accordance with the forthcoming solicitation. This will be set aside for total small businesses. Scope of Work: This work shall consist of: construction surveying and staking, erosion control measures, silt fencing and dewatering structures installation and removal after final acceptance, clearing and grubbing, the removal and resetting of historic rocks/stones located on the boundary of the trail surface, constructing trail widening, constructing trail passing areas, restoration of existing stairs, construction of new stairs, and reconstruction of damaged stairs, constructing new and rehabilitating existing interpretive sites, excavation, geotextile placement, constructing masonry walls with foundations, constructing and erecting new gabion baskets, trail re-surfacing, installing (1) culvert, constructing one (1) mechanically stabilized earth (MSE) wall, constructing open drainages, constructing underdrain systems, removal and demolition of existing bridges and individual tree(s) as specified in drawings, removal of existing invasive plant species, tree planting and mulching, riprap armoring, placing and colored grouted riprap, constructing two (2) new trail bridges and rehabilitating one (1) existing trail bridge #11, removal, replacement, and constructing bridge guardrails, removal, replacement, and constructing trail handrails, removal, replacement, and constructing stair handrails, demolition and disposal of identified existing shelters, hauling off of excessive excavated and accumulated sediment material, and contractor testing of materials. Location(s): La Mina Trail Head Coordinates: 18.30055556, -65.78444444 La Mina Falls Bridge #11 Coordinates: 18.30327, -65.77699 Big Tree Trail Head Coordinates: 18.308866, -65.775056 All work within this solicitation will be located on the El Yunque National Forest which is approx. 6.90 miles (11.1 Km) south of Rio Grande, Puerto Rico. All construction is within the El Yunque National Forest boundaries within the La Mina and Big Tree Trail’s Forest Recreation Area sites and trails. A vicinity and project location map are provided and enclosed in the attached solicitation drawings. Disclaimer: This notice does not commit the Government to contract for any supply or service. Respondents are advised that the United States (U.S.) Government will not pay for any information or administrative cost incurred in response to this notice. All costs associated with responding to this notice will be solely at the responding party's expense. Please be advised that all submissions become Government property and will not be returned. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. Submit questions and/or concerns to: Edward McKee, Contracting Officer edward.mckeejr@usda.gov and Jose Gutierrez, Contract Specialist jose.gutierrez4@usda.gov

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:12445222R0011
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 1, 2022

    La Mina and Big Tree Trail Rehabilitation Construction Project

    Notice daf90823d08a495dbfa71be180555f83 on SAM.gov

  2. 3×
    SolicitationCurrentMar 16, 2022

    La Mina and Big Tree Trail Rehabilitation Construction Project

    Notice 1df771edcb26423a86c9fbe72d4e3e90 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12445222R0011

Archive Date

May 10, 2022

Office Address

Atlanta, GA, 303092449