Notice ID: d958fe228eef440ab3e559d27ec7fb1cSolicitation
Forest Road 131 Bridge Replacement
Archived on June 29, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- May 12, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA EAST 13
- Place of performance
- Warren, PA, 16365
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 12445521B0001
- Notice ID
- d958fe228eef440ab3e559d27ec7fb1c
Description
General Project Information: The Forest Road (FR) 131-4.85 over Unnamed Tributary to East Branch Millstone Creek project is located at latitude 41.43297 , longitude 79.02084 in Elk County, Pennsylvania. The existing bridge is a 22 foot (clear) two span steel stringer bridge with concrete deck and abutments. The project includes the removal of the existing bridge and replacing it with a 28 foot (clear) single span timber panel-lam deck bridge with timber pile foundations. The existing bridge (FR131-4.85 over Unnamed Tributary to East Branch Millstone Creek) has structural and stability issues and requires replacement. Erosion from flood events along the East Branch Millstone Creek has caused erosion and collapsed the channel near the mouth of the Unnamed Tributary. It is proposed to replace the bridge with a new structure. For ease of installation, and to provide increased scour protection, the new bridge is proposed to be a 30' long, 18' wide single lane bridge. The structure will be a timber laminated deck with timber pile abutments. The new superstructure will be raised slightly to accommodate a 25mph speed. The existing eroded stream channel will be rebuilt to match the rock lined pools upstream of the bridge. Additional boulders will be placed along the bank of the East Branch Millstone Creek to provide erosion protection and protect the bridge. Finally, riprap will be added along the banks of the abutment for scour protection.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12445521B0001- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentMay 12, 2021
Forest Road 131 Bridge Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
12445521B0001
Archive Date
Jun 29, 2021
Office Address
Atlanta, GA, 303092449