GovChime
Notice ID: dab5a950f784bb594042c38a609a110dCombined Synopsis/Solicitation

Clean out outlet channel and silt bars in outlet channel at Okhissa Dam

Archived on June 21, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−06:00
Posted
April 25, 2019
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
NATIONAL FORESTS IN MISSISSIPPI
Place of performance
Homochitto Ranger District 3085 Hwy 98 East, Meadville, MS, 39653
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Jan 23, 2026

Identifiers

Solicitation number
12447U19Q0007
Notice ID
dab5a950f784bb594042c38a609a110d

Description

The excavated portion of the outlet channel at Okhissa Dam, located in Section 6, T5N, R4E, Franklin County, Mississippi is approximately 500' in length from the stilling basin to where it intersects the natural channel. Approximately 300' of this channel is constricted by silt bars from the remnants of a channel plug placed at the beginning of the channel in 2008 for testing purposes. Contractor will remove the silt bars and restore the channel to its original trapezoidal shape. A copy of the detail for the channel cross section from the original plans is attached; it was designed with a 38' flat bottom and 3:1 side slopes. The excavated material is to be hauled away and disposed of properly off Forest Service land. After the channel work has been completed, all areas outside the channel disturbed by construction will be regraded to their preconstruction condition. On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acres and 13-13-13 fertilizer at the rate of 500 pounds per acre. If seeding is done from September 1 to February 28, in addition to the above spread rye grass seed at the rate of 80 pounds per acre.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationFOREST SERVICEApr 25, 2019-

Lifecycle

Solicitation:12447U19Q0007
  1. Combined Synopsis
  1. Combined SynopsisCurrentApr 25, 2019

    Clean out outlet channel and silt bars in outlet channel at Okhissa Dam

    Notice dab5a950f784bb594042c38a609a110d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12447U19Q0007

Archive Date

Jun 21, 2019

Office Address

JACKSON, MS, 39213