GovChime
Notice ID: 21cdd300e9119867834a61fde8b78eccCombined Synopsis/Solicitation

Turkey Fork Lake Pier Construction

Archived on June 21, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−06:00
Posted
April 25, 2019
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238190: Other Foundation, Structure, and Building Exterior Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
NATIONAL FORESTS IN MISSISSIPPI
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Jan 23, 2026

Identifiers

Solicitation number
12447U19Q0009
Notice ID
21cdd300e9119867834a61fde8b78ecc

Description

Turkey Fork Lake Fishing Pier Proposal The USDA Forest Service, Chickasawhay Ranger District is seeking proposals for a design/build ABA compliant Fishing Pier at Turkey Fork Lake. The pier will be located at the Turkey Fork Lake Recreational Day Use Area near Sandhill, MS in Greene County. The overall goal is to construct an ABA complaint fishing pier using materials that are longer lasting and require less maintenance than a traditional wooden pier. The proposed Fishing Pier should be approximately 8-10 feet in width and meet the United States Access Board Guidelines and Standards for Fishing Piers and Platforms at Recreation Facilities as well as any and all other local, federal or state guidelines for pier construction. Pier must also meet ADA/ABA standards and provisions for Recreation Facilities Fishing Piers and Platforms. Length of the pier should be approximately 50-75 feet long, but overall length will be determined by available funding. Bids should include a cost per linear foot for funding purposes. The proposed pier should also be constructed in a manner for additional add on in the future. Pier must be floating with preference given to designs that are the least complicated for additional add on. Average water level depth at pier location is approximately 3 feet. Contractors are encouraged to do a site visit prior to bid submission. Pier location is at an active day use area and it will be the contractors responsibility to determine how best for them to access the site during construction. Forest Service representatives will be available to discuss possible routes. Any damage to the area due to contractors work shall be the responsibility of the contractor to remedy. Prospective bidders will be responsible for submitting a proposal that shall include drawings of the proposed pier and material/installation specifications for products to be used. Proposals will be evaluated on meeting ABA compliance, durability of materials and cost of maintenance. Contractors will be evaluated on Past Performance, Technical Proposal, and Price. Award will be made to the contractor with the lowest price technically acceptable.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationFOREST SERVICEApr 25, 2019-

Lifecycle

Solicitation:12447U19Q0009
  1. Combined Synopsis
  1. Combined SynopsisCurrentApr 25, 2019

    Turkey Fork Lake Pier Construction

    Notice 21cdd300e9119867834a61fde8b78ecc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12447U19Q0009

Archive Date

Jun 21, 2019

Office Address

JACKSON, MS, 39213