GovChime
Notice ID: 95e4c06c632f36c3808d2eb0327278edAward NoticeAwarded

USDA Forest Service SRS Oxford Hydrology Lab Oxford, MS- Facilities Maintenance

Awarded on July 5, 2019. Full description on SAM.gov.

Awarded tounder 12456819C0024 (source: SAM.gov award notice)• $15.5K

Overview

Posted
July 5, 2019
Notice type
Award Notice
NAICS
561210: Facilities Support Services
Agency
Department of Agriculture

Notice details

Place of performance
SRS Forest Hydrology Lab 1000 Front Street, Oxford, MS, 38655
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025
Award date
Jul 5, 2019
Award amount (SAM.gov award notice)
$15.5K

Identifiers

Solicitation number
12456819Q0021
Notice ID
95e4c06c632f36c3808d2eb0327278ed
Award number (PIID)
12456819C0024

Description

Contract Award has been made to Tri-Star Companies in the following amounts NTE (not to exceed) Base Period: $5,180.00 Option Period 01: $5,180.00 Option Period 02: $5,180.00 Option Period 03: $5,180.00 Option Period 04: $5,180.00 Base plus all potential options (1-4) NTE $25,900.00

Full description on SAM.gov

Award Overview

Award Number

12456819C0024

Award Amount (SAM.gov award notice)

$15.5K

Award Date

Jul 5, 2019

Awardee

Awardee UEI

C19CTKKZFYA3

Awardee CAGE Code

5NLB8

Original Solicitation

Notice ID: 95e4c06c632f36c3808d2eb0327278ed

Posted Date: Jul 5, 2019

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12456819Q0021
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationJun 16, 2019

    USDA Forest Service SRS Oxford Hydrology Lab Oxford, MS- Facilities Maintenance

    Notice 25002acff24fe8b91e153382f7f81997 on SAM.gov

  2. SolicitationJun 16, 2019

    USDA Forest Service SRS Oxford Hydrology Lab Oxford, MS- Facilities Maintenance

    Notice f56891abdcd1be295035b23e49091618 on SAM.gov

  3. AwardedCurrentJul 5, 2019

    USDA Forest Service SRS Oxford Hydrology Lab Oxford, MS- Facilities Maintenance

    Notice 95e4c06c632f36c3808d2eb0327278ed on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
***Amendment 0004*** This amendment serves to extend the due date to Monday, November 02, 2026. No other changes will be made. All terms and conditions remain the same. ***Amendment 0003*** This amendment serves to change and remove language in the scope of work. Please see the changes to the scope of work, Section B, and Attachments 1, as well as the bid schedule for the Parent IDIQ and the Seed Task Order. No other changes have been made. The solicitation closing date is hereby extended through 30 October 2026. All terms and conditions remain the same. ***Amendment 0002*** Amendment 0002 serves to change and remove language in the scope of work and attachments. Please see the changes to the scope of work, Sections E, F, G, L, and M, Attachments 1, 2, and 3, as well as the bid schedule for the Parent IDIQ and the Seed Task Order. The proposal due date is hereby extended to 23 October 2026. ***Amendment 0001*** Amendment 0001 has been posted to provide the site visit sign in sheet, and both power point presentations shown at the site visit. This amendment also extends the solicitation due date to 14 October 2026. ***Notice*** The site visit will be held on Tuesday, September 15, 2026, beginning at 0900 hrs. Address of site visit is Lake Ouachita Field Office, 1424 Blakely Dam Rd, Royal AR 71968. This is a 100% total small business set-aside procurement issued under NAICS code 561210, Facilities Support Services by the U.S. Army Corps of Engineers, Vicksburg District (MVK). The U.S. Army Corps of Engineers (USACE) Vicksburg District (MVK) has the continued responsibility for the operation and maintenance (O&M) of the Arkansas Lakes Flood Control Projects at DeGray Lake, Lake Ouachita, and Lake Greeson located in the state of Arkansas. A broad variety of operations, routine and non-routine maintenance, repair including emergency repairs, inspection, reconstruction, modernization, and rehabilitation of project facilities, water control structures, and features are required under this procurement. These include Recreation Area and Facility Cleaning; Solid Waste Collection, Transport, and Disposal; Heavy Equipment Maintenance/Repairs; Visitor Center Operations and Maintenance; Carpentry; Erosion Control Activities; Buoy Placement and Maintenance; Painting; Heating/Air Conditioning Services; Masonry Repair; Landscaping; Wildlife and Fisheries Enhancement; Flood Control Structure Repairs and Maintenance; and Road Maintenance/Repairs. The Government intends to award an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a base ordering period with four options and a 6-month ordering period.
-Solicitation11/02/2026
SF 30 CONTINUATION SHEET AMENDMENT 0002 Solicitation No.: 36C25627Q0022 Project: B170 Courtyard Window Re Caulk CAVHS Purpose of Amendment The purpose of this amendment is to provide the Government s responses to vendor questions submitted prior to the deadline. The following Questions & Answers are hereby incorporated into the solicitation. These clarifications do not change the scope of work unless explicitly stated. Only the Contracting Officer may authorize changes per FAR 52.212 4(c). SECTION: QUESTIONS & ANSWERS General Administrative Items Q1. Will the Government confirm that offers should be submitted via email to andrew.misfeldt@va.gov? A1. Yes. Submit one consolidated PDF ( 10MB), font Arial 11, in accordance with the solicitation instructions. Q2. Are there page limitations? A2. No page limits apply. The file-size limit of 10MB governs. Q3. Which form must be submitted SF 1449 or SF 1442? A3. Offerors shall submit a signed SF 1449. SF 1442 is not required. Evaluation Factors Q4. Please confirm the evaluation factors. A4. Evaluation consists of: Factor I Approach & Quality Management Factor II Professional Qualifications & Specialized Experience Factor III Past Performance Factor IV Price Factors I III are equal in importance and collectively approximately equal to Price. Q5. Does managing one subcontractor satisfy Past Performance requirements? A5. Yes, provided the offeror served as the prime contractor. Site Visit, Access, & Logistics Q6. Will there be a site visit? A6. A site visit was held on October 14, 2026. No additional site visits will be conducted. Q7. Please confirm logistical restrictions. A7. Approximate curtainwall height is 50 ft (verify independently). Elevator weight limit is 4,000 lbs. Courtyard door widths are 36 58 . Quiet hours are 2 3 PM and 10 PM 5 AM. Coordinate courtyard occupation with nursing staff. Q8. Are badges required? A8. Not for courtyard work during business hours. Badges are required for roof access. Delays caused by incomplete contractor submissions are not excusable delays. Scope Clarifications Q9. Does work occur along the entire curtainwall or only at leak locations? A9. Work shall occur along the entire curtainwall interface within Courtyards 1B and 1C to provide a continuous and complete seal. Q10. Should the entire length be repaired for a uniform seal? A10. Yes. Q11. Are cover caps replaced everywhere? A11. No. Replace only caps that are missing or cannot be reattached. Q12. Are other courtyard walls included? A12. No. Only the curtainwall/TPO/wall interface is included unless otherwise directed by the CO. Q13. Will the Government provide as builts or record drawings? A13. No. They are not available. Q14. Will the Government provide quantities? A14. No. Offerors must determine all quantities during the site visit. These measurements are binding for proposal purposes. Q15. Is full perimeter window caulking included? A15. No. Only the interfaces described in the SOW apply. Q16. Clarify termination bar installation. A16. Install the bar above the cant strip to secure the existing TPO using fasteners compatible with the substrate. Q17. Clarify face cap/flashing quantities. A17. Approximately 14 vertical caps have slid; one horizontal cap is missing; two require replacement. Remove flashing attached to the ground level base face cap. Offerors must verify all quantities. Q18. Will the awning require removal? A18. Not anticipated. Do not include awning removal unless CO directed. Q19. How many pavers must be moved and how should they be stored? A19. Approximately 70 pavers must be moved. Store in the courtyard, stacking no more than six high. Specifications, Submittals, & Warranty Q20. Which parts of VA 07 54 23 apply? A20. Membrane accessory materials and compatibility requirements apply. VA 07 92 00 applies to sealant products. Where requirements conflict, the more stringent governs. Q21. Confirm applicability of installer approvals, warranty, submittals, and pre installation meeting. A21. Manufacturer-approved roofing installer: Not required. Sealant warranty: 10-year manufacturer warranty required. Submittals: Required for sealants and termination materials showing compatibility. Pre installation meeting: Required prior to NTP; the 30 day PoP begins after NTP issuance. Q22. Provide TPO manufacturer or warranty info. A22. Unknown. Contractor is not responsible for maintaining prior warranties and shall ensure compatibility of materials. Schedule & Period of Performance Q23. Will NTP be flexible due to temperature/weather? A23. Yes. NTP may be adjusted as appropriate. Excusable delays are handled per FAR 52.212 4(f). Q24. Are background checks/PIV issuance included in the PoP? A24. Yes. Badges only required for roof access. Delays arising from incomplete contractor submissions are not excusable. Q25. Will water spray or infiltration testing be required? A25. No. Optional testing may be performed at the contractor s cost unless CO directed. Q26. Anticipated award/NTP date? A26. Award is anticipated on or around November 1, 2026 (subject to change). Schedule adjustments for weather may be considered if CO approved. Labor Standards, Set Aside, Subcontracting, & Bonds Q27. Which wage determination applies? A27. Davis Bacon Wage Determination AR20260032 applies. Q28. Will the contract be issued under DBRA only? A28. Yes. Any SCLS references are not applicable and will be conformed administratively. Q29. Which limitations on subcontracting apply? A29. Construction limitations apply. For special trade construction, no more than 75% (excluding materials) may be subcontracted to non similarly situated entities. LOS certification must be submitted. Q30. Are performance and payment bonds required? A30. No. Bonds are not required under this solicitation unless added by future amendment. Q31. Confirm SDVOSB status requirements. A31. This is a total SDVOSB set aside. Offerors must be certified in the SBA database at time of offer and award. Materials & Trades Q32. Will brake metal caps be accepted if originals are unavailable? A32. Yes, if they closely match existing caps and are approved before installation. Q33. Is a glazing contractor required? A33. No. Quantities & Pricing Basis Q34. Can VA provide LF quantities of termination bar or number of caps? A34. No. Offerors must determine quantities during the site visit. Q35. Should offerors price awning removal? A35. No. Do not include awning removal unless CO directed. Unforeseen/Differing Site Conditions Q36. How will additional TPO damage discovered during work be handled? A36. Repairs beyond the defined scope may only be performed if directed in writing by the Contracting Officer. Entitlement will be determined at that time. Q37. Are leaks associated with recent renovations? A37. No. Leaks have been occurring since the membrane was installed. Attachments Q38. Are photos/figures available? A38. Yes. Figures 1 6 included for reference only. Offerors must verify all conditions independently. Figure 1. Curtainwall Above GE101A and GE10B Figure 2. Curtainwall Above GF100 Figure 3. Missing Horizontal window base cap Figure 4. Flashing attached to horizontal window face cap Figure 5. TPO membrane beneath windows Figure 6. Metal Awning
-Solicitation10/29/2026
-AwardedOpen
*see Q&A *see 4 attachments *we will not extend this solicitation *email Q&As to marilyn.etheridge@usda.gov & CC richard.kandrach@usda.gov *this solicitation ends per the SF1449 on 11/12/2026 by 0900hrs AM ET Complete the following and submit with your Offer: *failing to complete any of these requirements could disqualify your offer -SF1449: blocks 21, 22, 24, 24, 30a, 30b, 30c >> of attachment: C04_01 Solicitation, pages 1 & 2 -Schedule of Items (SOI) - complete highlighted yellow areas >> of attachment: C04_02 PWS, page 1 -Past Performance Experience Questionnaire >> of attachment: C04_04 Past Performance Experience Questionnaire -provide quote and include your sam.gov UEI # on your quote with date
-Combined Synopsis11/12/2026
This modification notice to the Special Notice provides the applicable document left off the original posting.
-Special NoticeOpen

Additional Details

Solicitation Number

12456819Q0021

Archive Date

Jul 20, 2019

Office Address

ASHEVILLE, NC, 28804