GovChime
Notice ID: 4a0c19998c6c49f38e340f29efd95999Solicitation

HVAC Equipment Replacement, Memphis

Archived on July 8, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−05:00
Posted
June 8, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of AgricultureANIMAL AND PLANT HEALTH INSPECTION SERVICE

Notice details

Office
MRPBS MINNEAPOLIS MN
Place of performance
Bartlett, 38133
PSC
Y1AA: CONSTRUCTION OF OFFICE BUILDINGS
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12639523R0014
Notice ID
4a0c19998c6c49f38e340f29efd95999

Description

The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System. The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time. Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers. Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit. Solicitation and attachments are posted below. Amendment 0001 posted below. Amendment 0002 and the site visit attendance sheet are posted below. Amendment 0003 documents are posted below. In response to questions received from an interested vendor: - As-built drawings are not available. - A permit is not expected to be required for this project. Amendment 0004 is posted below. Amendment 0005 is posted below. Amendment 0006 is posted below. Amendment 0007 posted below--it extends the time that proposals are due to 3 p.m. CT today.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:12639523R0014
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 23, 2023

    HVAC Equipment Replacement, Memphis

    Notice 645d3072729b43408bf8bee8e30b10d9 on SAM.gov

  2. 8×
    SolicitationCurrentApr 25, 2023

    HVAC Equipment Replacement, Memphis

    Notice 4a0c19998c6c49f38e340f29efd95999 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

12639523R0014

Archive Date

Jul 8, 2023

Office Address

MINNEAPOLIS, MN, 55401