GovChime
Notice ID: d0b04c739c804daf8d0cc58341a5eeb0Solicitation

Moore Air Base Building 6414 Electrical Upgrades - Phase 1

Archived on October 12, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
September 24, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of AgricultureANIMAL AND PLANT HEALTH INSPECTION SERVICE

Notice details

Office
MRPBS MINNEAPOLIS MN
Place of performance
Edinburg, 78541
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12639524R0040
Notice ID
d0b04c739c804daf8d0cc58341a5eeb0

Description

The U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), has a electrical construction requirement at one of its facilities at Moore Air Base, Edinburg, Texas. Background: Building 6414 has an existing electrical distribution system comprised of an exterior main switchboard and various distribution transformers and panelboards throughout the facility. The existing electrical equipment is almost entirely original to the building and has exceeded its rated life. Equipment displays signs of water damage and corrosion. A two-phased project, the overall project will include replacement of the main service transformer, main switchboard, distribution equipment and associated feeders. Project Description—Phase 1: New service transformer, exterior main switchboard and transfer switch to back-feed existing switchboard, and all the work defined in the project drawings and specifications is included in the scope of this project. Solicitation and attachments are posted below. Amendment 0001 is posted below. Attachments 2 and 3 are replaced with the final, 100 percent complete specifications and drawings. Site visit attendance posted below. RFIs and responses posted below.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:12639524R0040
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    SolicitationCurrentAug 28, 2024

    Moore Air Base Building 6414 Electrical Upgrades - Phase 1

    Notice d0b04c739c804daf8d0cc58341a5eeb0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12639524R0040

Archive Date

Oct 12, 2024

Office Address

MINNEAPOLIS, MN, 55401