GovChime
Notice ID: 48fca8227f7e473281cd2a3636840462Combined Synopsis/Solicitation

Forest Service Lab Roof Replacement Project

Archived on September 2, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
August 27, 2020
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238160: Roofing Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE
Place of performance
Delaware, OH, 43015
Last updated
Apr 29, 2026

Identifiers

Solicitation number
1263PX20R0004
Notice ID
48fca8227f7e473281cd2a3636840462

Description

08/27/2020: The contract is being awarded to 12 Bravo Group in the amount of $239,936.00. 8/14/2020: 001 - The 59 wing construction has unforeseen complications to completing the re-roof construction. Therefore, that part of the project is remove it from consideration. The TPO and EPDM alternatives for the causeway and the 68 wing roofs remain as per the SOW. Clarification: On the issue regarding reusing the insulation on the 68 wing. The government indicated in the SOW that this was a partial tear-off roof, meaning that some of the insulation may remain as long as the remaining insulation is in acceptable condition. Refer the SOW references of the International Building Code and the National Roofing Contractors Association standards of practice. Amendment 001 Attached Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows: 1. Remove and dispose of Single-Ply roofing membrane. 2. Remove identified rooftop equipment, curbs, and penetrations; infill roof deck openings. 3. Full or partial tear-off of existing roofing system as directed. 5. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim. 6. Add to, or replace as necessary, fascia sheet metal; maintain existing profile. 7. Repair or replace damaged expansion joints. 8. Install retrofit roof drains. 9. Install new or additional roofing insulation as directed. 10. Provide tapered roofing insulation as necessary to achieve proper roof drainage. 11. Install new fully adhered Single-Ply roofing system, flashing, and manufacturers roof penetration devices. 12. Incorporate mechanical equipment, curbs to remain, and penetrations into the new roofing system. Follow roofing system manufacturers flashing recommendations.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:1263PX20R0004
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentJul 18, 2020

    Forest Service Lab Roof Replacement Project

    Notice 48fca8227f7e473281cd2a3636840462 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1263PX20R0004

Archive Date

Sep 2, 2020

Office Address

SAINT PAUL, MN, 55108