GovChime
Notice ID: 725ffaf20f8548ad9b3c506c21c7335bSolicitation

BHNF Bogus Jim Road (NFSR 201) Resurfacing

Archived on May 30, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
May 14, 2020
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Black Hills National Forest
Place of performance
Silver City, 57702
Last updated
Sep 25, 2026

Identifiers

Solicitation number
1267T020Q0024
Notice ID
725ffaf20f8548ad9b3c506c21c7335b

Description

The project is located on the Black Hills National Forest approximately 10.9 miles northeast of Silver City, South Dakota. Under this project, the Contractor shall be required to load, haul and place an aggregate surface course on 3.77 miles of existing Forest System Road to include turnouts and curve widening segments. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 161+70 and a 3% crowned finish. The roadway surface course shall be placed to a 4” compacted depth, with a 14’ surface width from STA. 161+70 to 199+00 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry. OPTION A. Nissen Road (NFSR 202) Resurfacing. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 105+60 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry. See Attached specifications for details.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:1267T020Q0024
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 23, 2020

    BHNF Bogus Jim Road (NFSR 201) Resurfacing

    Notice 9c1565bd1859496fa3a36650ad67cf22 on SAM.gov

  2. 3×
    SolicitationCurrentApr 15, 2020

    BHNF Bogus Jim Road (NFSR 201) Resurfacing

    Notice 725ffaf20f8548ad9b3c506c21c7335b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1267T020Q0024

Archive Date

May 30, 2020

Office Address

CUSTER, SD, 57730