Notice ID: 725ffaf20f8548ad9b3c506c21c7335bSolicitation
BHNF Bogus Jim Road (NFSR 201) Resurfacing
Archived on May 30, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−06:00
- Posted
- May 14, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Black Hills National Forest
- Place of performance
- Silver City, 57702
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 1267T020Q0024
- Notice ID
- 725ffaf20f8548ad9b3c506c21c7335b
Description
The project is located on the Black Hills National Forest approximately 10.9 miles northeast of Silver City, South Dakota. Under this project, the Contractor shall be required to load, haul and place an aggregate surface course on 3.77 miles of existing Forest System Road to include turnouts and curve widening segments. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 161+70 and a 3% crowned finish. The roadway surface course shall be placed to a 4” compacted depth, with a 14’ surface width from STA. 161+70 to 199+00 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry. OPTION A. Nissen Road (NFSR 202) Resurfacing. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 105+60 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry. See Attached specifications for details.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
1267T020Q0024- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationMar 23, 2020
BHNF Bogus Jim Road (NFSR 201) Resurfacing
- 3×SolicitationCurrentApr 15, 2020
BHNF Bogus Jim Road (NFSR 201) Resurfacing
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
1267T020Q0024
Archive Date
May 30, 2020
Office Address
CUSTER, SD, 57730