Notice ID: 3b10529d516a4e53a38e32e0c174f838SolicitationArchived
Forest Service - Fountain Place FY25 Road Repairs
Archived on September 9, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM PDT
- Posted
- July 25, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA SOUTHWEST 6
- Last updated
- Nov 10, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 127EAW25R0055
- Notice ID
- 3b10529d516a4e53a38e32e0c174f838
Description
127EAW25R0055 - Fountain Place FY25 Road Repairs Lake Tahoe Basin Management Unit FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $100,000 and $250,000. Set Aside: Total Small Business Set Aside IMPORTANT NOTES: 1. Refer to Section L, Paragraph L.2, on Page 34 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided. 2. All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 15th, 2025. 3. A formal site visit will not be organized. Offerors are reminded that failure to inspect the site shall not serve as a basis for any claims following the award of the contract.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Tanya Torres
Documents
Files (9)
- Download
1. Statement of Work.pdf
297 KBAdded in Solicitation version 3Posted - Download
2. Schedule of Items - Fountain Place FY25 Road Repairs.docx
23 KBAdded in Solicitation version 3Posted - Download
3. Davis-Bacon Act WD. CA20250007.pdf
14 MBAdded in Solicitation version 3Posted - Download
4. Fire Plan.pdf
294 KBAdded in Solicitation version 3Posted - Download
5. Fountain Place Map.pdf
352 KBAdded in Solicitation version 3Posted - Download
6. FP-14.pdf
4.0 MBAdded in Solicitation version 3Posted - Download
7. FSSS - All National.pdf
982 KBAdded in Solicitation version 3Posted - Download
8. RFI Form - Fountain Place FY25 Road Repairs.docx
29 KBAdded in Solicitation version 3Posted - Download
Solicitation 127EAW25R0055 - Fountain Place FY25 Road Repairs.pdf
655 KBAdded in Solicitation version 3Posted
Lifecycle
- 3Version 3SolicitationArchivedCurrent
Forest Service - Fountain Place FY25 Road Repairs
- 6Version 6Award NoticeArchived
Type changed from Solicitation to Award Notice
Forest Service - Fountain Place FY25 Road Repairs
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT | 72% | Combined Synopsis | 12/04/2026 |
EO 14398 - Access Road Repair National Elk Refuge | 71% | Solicitation | 12/14/2026 |
. EO 14398 - Access Road Repair National Elk Refuge This is a Synopsis/Pre-Solicitation notice. The final solicitation package will follow. This opportunity is only available to Small Businesses. The U.S. Fish & Wildlife Service Great American Outdoors Act (GAOA) Construction Team has a requirement for the following: The repair of the Access Road at the National Elk Refuge in Jackson, WY in Teton County. The project includes providing all material, equipment, and labor required to perform the road re-surfacing for the Access Road. This requirement is being procured in accordance with FAR Part 13, Simplified Acquisition Procedures. This will be a Firm Fixed Priced Contract and Award will be based on Lowest Price. The complete Solicitation will be posted to https://sam.gov/ under Contract Opportunities on or about November 10, 2026. Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete Online Representations and Certifications. A pre-proposal site visit and instructions will also be announced with the solicitation. The NAICS code is 237310 - Highway, Street, and Bridge Construction and the size standard is $45 million. The project magnitude is between $25,000 and $100,000. The work will commence within 10 days of Notice to Proceed and be completed by the agreed upon date at the time of award. Bonding Requirements: 20% Bid Bond, 100% Payment Bond Direct questions in writing via email ONLY to Samantha LaGue at Samantha_LaGue@ios.doi.gov | 71% | Pre-Solicitation | 12/14/2026 |
The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Repair of Sergeant Major Boulevard at Fort Bliss, Texas. | 64% | Solicitation | 09/15/2026 |
The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Repair of Sergeant Major Boulevard at Fort Bliss, Texas. | 64% | Awarded | Open |
Additional Details
Solicitation Number
127EAW25R0055
Archive Date
Sep 9, 2025