GovChime
Notice ID: c424c24ecbfa43deb5672820aa79909dSolicitation

Construction: Flagstaff RD Main Office Electric Design & Repair

Archived on September 15, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−07:00
Posted
July 19, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Southwestern Regional Office, Region 3
Place of performance
Flagstaff, 86004
Last updated
Sep 25, 2026

Identifiers

Solicitation number
127EAX22Q0023
Notice ID
c424c24ecbfa43deb5672820aa79909d

Description

Amendment 1 Extends due date for offers. The USDA Forest Service, Coconino National Forest, Flagstaff Ranger District (FRD) has a requirement for Design and Repair of building electrical system, Coconino County, Arizona 86004. Project consists of tasks for design and repairs to a portion of the main office electrical system. Design and repairs shall move the existing electrical and data outlets from floor locations to new wall or pole locations, include wiring, and all other items needed to fully function upon completion. As a result of this solicitation, the Government anticipates awarding a Firm Fixed-Price Construction Contract using FAR 15 Request For Quotation (RFQ) Best Value format. This is a 100% Small Business Set Aside to NAICS code 238210 $16.5 Million is the maximum size standard to qualify as small business. PSC code Z2AA. To be eligible for award of a Federal contract, potential vendors, at time of award, need to have an active registration in the System for Award Management (SAM) at https://sam.gov/content/home . Basis for Award – Best Value-Tradeoffs – See Section M (last section of this document). Formal Site Visit has been scheduled for July 11, 2022, 10:00 am. Site visit location: Flagstaff Ranger Station, 5075 US-89, Flagstaff, AZ 86004. Deadline for submission of offers shall be August 10, 2022, 4:00 p.m. (Pacific Daylight Time).

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Warren Abbott
Fax: 9283335966

Secondary Contact

Michelle Bahr
Fax: 9283335966

Documents

No documents available.

Lifecycle

Solicitation:127EAX22Q0023
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentJun 24, 2022

    Construction: Flagstaff RD Main Office Electric Design & Repair

    Notice c424c24ecbfa43deb5672820aa79909d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Forest Service Fernan Ranger Station lift station electrical repairs in accordance with the statement of work. Solicitation number 1240LU26Q0125 is issued as a request for quotation (RFQ). The magnitude of the project is under $25,000.
60%
Combined Synopsis11/19/2026
Amendment 0003 is being issued to change the original SF1449 cover page to correct Block 8 from 12/07/2026 to 12/09/2026 as provided for in the rest of the solicitation. Amendment 0002 is being issued to correct faulty upload of Attachment 2.Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines. There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.
57%
Combined Synopsis12/09/2026
The U.S. Coast Guard Academy requires a qualified, licensed electrical contractor to inspect, repair as necessary, test, and restore Eaton/Cutler-Hammer MVS2 13.2 kV medium-voltage load interrupter switchgear, with primary work focused on Cabinet 5 and the associated 15 kV feeder cable serving Smith Hall. The contractor shall inspect Cabinet 5 for damage or missing/cannibalized components; remove and replace three Eaton 15CLE-250E fuses; procure and deliver three additional matching fuses for on-site spares; perform insulation-resistance testing of the feeder cable in accordance with current ANSI/NETA standards; provide certified test and field-service reports; coordinate all required outages and lockout/tagout procedures with the Government; and safely re-energize the cabinet and feeder upon successful completion of repairs and testing. All work shall comply with applicable OSHA, NFPA 70E, federal, state, and local requirements, including proper licensed personnel, arc-flash personal protective equipment, site protection, cleanup, and disposal of waste materials.
55%
Combined Synopsis11/12/2026
Login at https://piee.eb.mil and search for 'W90VN726RA011' to obtain more details.*
55%
Combined Synopsis04/27/2026
This is a combined synopsis/solicitation for commercial construction items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0015 is issued as a Request for Quotation (RFQ) for Electrical Upgrades to the Grant County Aeriel Fire Base and Tanker Cache on the Gila National Forest. This project consists of furnishing and installing a complete, code-compliant electrical distribution system to support a designated concrete pad area at the tanker base/fire cache, and the upgrade of an existing electrical/motor control panel serving the retardant pumping system. The completed system shall be suitable for continuous outdoor service in a high-use industrial environment and designed for durability, safety, and future expansion. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210. The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
54%
Combined Synopsis12/11/2026

Additional Details

Solicitation Number

127EAX22Q0023

Archive Date

Sep 15, 2022

Office Address

ALBUQUERQUE, NM, 87102