Hopewell Recreation Site Improvements on the Carson National Forest
Awarded on June 23, 2026. The description is published on SAM.gov: Full description on SAM.gov.
Overview
- Posted
- June 23, 2026
- Notice type
- Award Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Carson National Forest
- Place of performance
- Tres Piedras
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 23, 2026
- Award amount (SAM.gov award notice)
- $1.1M
Identifiers
- Solicitation number
- 127EAX26C0022
- Notice ID
- 0f07c5b52e8f4e40a848a679c3654b3b
- Award number (PIID)
- 127EAX26C0022
Description
Award Overview
Award Number
127EAX26C0022
Award Amount (SAM.gov award notice)
$1.1M
Award Date
Jun 23, 2026
Awardee
Awardee UEI
ZJRZEMCLUPS6
Awardee CAGE Code
8VF54
Line Item Number
127EAX26Q0008
Original Solicitation
Notice ID: 0f07c5b52e8f4e40a848a679c3654b3b
Posted Date: Jun 23, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (7)
- Download
RFI Questions and Responses_127EAX26Q0008 Amendment 0001.pdf
244 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
127EAX26Q0008 Amendment 0001.pdf
161 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
ATTACHMENT 4_WAGE DETERMINATION_Construction Heavy_Rio Arriba County_NM.pdf
30 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATTACHMENT 3_DRAWINGS_06242025_Hopewell Recreation Site Improvements.pdf
44 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATTACHMENT 2_COMBINED SOW and SPECS_Hopewell Recreation Site Improvements_Stamped.pdf
2.4 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATTACHMENT 1_SCHEDULE OF ITEMS_Hopewell Recreation Site Improvements.pdf
97 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
127EAX26Q0008.pdf
255 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
Hopewell Recreation Site Improvements on the Carson National Forest
- 5Version 5Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Hopewell Recreation Site Improvements on the Carson National Forest
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The work to be completed consists of buying any and all material as well as the transportation of all material to the job site. It will also consist of the removal and haul out of old fence material. Contractor will be constructing 5 miles of 4 strand barb wire fence, along the same general line of the old fence. Use of chainsaw will be allowed to brush out fenceline as needed. This project will be solicited in accordance with FAR 12.201-1(c)(2). The Government will issue a request for quotes directly from local fencing contractors and will not issue a solicitation on SAM.gov. If your company is interested in future fencing projects in Gila NF, then ensure that you have an active SAM.gov account and provide your company name and Unique Entity Identifier (UEI Number) to Traci.jackson@usda.gov. | - | Pre-Solicitation | 11/19/2026 |
**********UPDATE 11-5-2026********** AMENDMENT 001 posted today with the following five (5) updated and/or new attachments: 1. 127EAX27Q0007_0001 2. RFI Questions and Responses_127EAX27Q0007_Amendment 001 3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026 4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026 5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026 **********End of Amendment 001********** Commercial Construction Requirement Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT® style vault toilets. There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation. | - | Solicitation | 11/17/2026 |
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots. | - | Combined Synopsis | 11/30/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 124PSA27Q0027 is issued as a Request for Quotation (RFQ) for replacement of cattle shades. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238990 The small business size standard is $19.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. | - | Combined Synopsis | 11/24/2026 |
This intent of this project is to construct approximately 0.5 miles of barbwire fence lines near Kalamazoo Campground on the Ely Ranger District. Construct two barbwire drift fences totaling approximately 0.5 miles in length to exclude active grazing within Kalamazoo Campground. Livestock in the campground presents a safety hazard and has resulted in numerous complaints from the public. In addition, limiting livestock activities within the campground will also extend protection of newly installed recreational infrastructure. This project includes construction of approximately 2,500 feet of new barbwire fence including installation of an estimated four 12-foot wire gates as a lump sum. | - | Combined Synopsis | 12/04/2026 |
Additional Details
Solicitation Number
127EAX26C0022
Archive Date
Jul 8, 2026
Office Address
TAOS, NM, 87571