GovChime
Notice ID: 0e0dc463399992576e311daf900fe2b2Award NoticeAwarded

HVAC Control System

Awarded on August 2, 2018. Full description on SAM.gov.

Awarded tounder 127K1118C0006 (source: SAM.gov award notice)• $115.3K

Overview

Posted
August 6, 2018
Notice type
Award Notice
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Agriculture

Notice details

Place of performance
2500 Shreveport Highway, Pineville, LA, 71360
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Aug 2, 2018
Award amount (SAM.gov award notice)
$115.3K

Identifiers

Solicitation number
127K1118R0004
Notice ID
0e0dc463399992576e311daf900fe2b2
Award number (PIID)
127K1118C0006

Description

Questions and answers from the pre-bid tour on 7/10/18 were as follows: Q: What is required for payment bond? A: Reviewed FAR 52.228-13 (included in the solicitation) covering the options available to the contractor for alternative payment protections. Q: What will be required as far as superintendence? A: Per FAR 52.236-6 Superintendence by the Contractor, the contractor must have a qualified representative on-site whenever work is being performed. Q: Contractor noted they would need to verify valve sizes by equipment GPM and pressure drop requirements, which may not correlate to piping diameters. A: Government will review facility plans for data related to original designs. Q: What is the seasonal phasing requirement? A: As this is an occupied building, we are requiring the contractor to work the hot water piping and controls in the summer and the cold water piping in the winter. The piping is old and there is a high probability that isolation valves will fail, so we are planning to drain each system to accomplish the work of changing the three way valves. The government acknowledged this could increase mobilization expenses. Q: Can we store materials and tools on-site? A: We can provide access/space in the boiler room to secure materials and tools. Q: What will be the time of performance? A: The seasonal phasing requirement will allow at least one full year. Q: What condition are the fresh air controls and dampers in? A: They were sealed off with insulation and plywood some years ago; the fresh air dampers and controls are beyond repair and replacement would be cost prohibitive for the narrow times of year that they benefit the temperature controller and efficiency. Repair or replacement of the fresh air dampers and controls are not required for this contract. THIS CONSTITUTES AMENDMENT ONE TO THE SOLICITATION. AN SF-30 WILL NOT BE ISSUED. THE RESPONSE DATE HAS NOT BEEN CHANGED.

Full description on SAM.gov

Award Overview

Award Number

127K1118C0006

Award Amount (SAM.gov award notice)

$115.3K

Award Date

Aug 2, 2018

Awardee

Awardee UEI

QMXJNZBGL8U3

Original Solicitation

Notice ID: 0e0dc463399992576e311daf900fe2b2

Posted Date: Aug 6, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:127K1118R0004
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 2×
    Pre-SolicitationJun 14, 2018

    HVAC Control System

    Notice 3d5a22410bf6037947dbee119c3802c2 on SAM.gov

  2. SolicitationJul 16, 2018

    HVAC Control System

    Notice 71d9f633c8c084c3137ce73c9841a08d on SAM.gov

  3. AwardedCurrentAug 6, 2018

    HVAC Control System

    Notice 0e0dc463399992576e311daf900fe2b2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

127K1118R0004

Archive Date

Aug 17, 2018

Office Address

JACKSON, MS, 39213