GovChime
Notice ID: 8eceef36b293b7ba9d3b262aa123a76aAward NoticeAwarded

Mastication Thinning at Tonto National Forest

Awarded on August 9, 2019. Full description on SAM.gov.

Awarded tounder 12837119C0010 (source: SAM.gov award notice)• $980.6K

Overview

Posted
August 12, 2019
Notice type
Award Notice
NAICS
115310: Support Activities for Forestry
Agency
Department of Agriculture

Notice details

PSC
F: NATURAL RESOURCES MANAGEMENT
Last updated
Sep 10, 2025
Award date
Aug 9, 2019
Award amount (SAM.gov award notice)
$980.6K

Identifiers

Solicitation number
12819719R0014
Notice ID
8eceef36b293b7ba9d3b262aa123a76a
Award number (PIID)
12837119C0010

Description

This is a response to questions in regards to this solicitation. The questions period is now closed. Q: Is there a maximum slope percent that contractors are not to be expected to work above/beyond? Typical is work up to 30% slope without severe rock obstacles, less than 30% if the ground is covered with obstacles that could interfere with normal machine travel. A: Yes Up to 30% on slopes and rocky terrain. Q: Due to the amount of rock obstacle on the ground within the project area is there a material depth to be left "above naturally occurring obstacle"? A: less than 1ft above natural obstacles. Grounded material overall not to exceed 4inches above the ground with no obstacles. Q: Has any of the project area been cut already? A: Yes 500 acres was once thin and piled burned in 2007 Q: Is there a maximum slope percent that contractors are not to be expected to work above/beyond? Typical is work up to 30% slope without severe rock obstacles, less than 30% if the ground is covered with obstacles that could interfere with normal machine travel. A: Yes Up to 30% on slopes and rocky terrain. Q: Due to the amount of rock obstacle on the ground within the project area is there a material depth to be left "above naturally occurring obstacle"? A: less than 1ft above natural obstacles. Grounded material overall not to exceed 4inches above the ground with no obstacles. Q: Has any of the project area been cut already? A: Yes 500 acres was once thin and piled burned in 2007 Q: Is there a maximum slope percent that contractors are not to be expected to work above/beyond? Typical is work up to 30% slope without severe rock obstacles, less than 30% if the ground is covered with obstacles that could interfere with normal machine travel. A: Yes Up to 30% on slopes and rocky terrain. Q: Due to the amount of rock obstacle on the ground within the project area is there a material depth to be left "above naturally occurring obstacle"? A: less than 1ft above natural obstacles. Grounded material overall not to exceed 4inches above the ground with no obstacles. Q: Has any of the project area been cut already? A: Yes 500 acres was once thin and piled burned in 2007

Full description on SAM.gov

Award Overview

Award Number

12837119C0010

Award Amount (SAM.gov award notice)

$980.6K

Award Date

Aug 9, 2019

Awardee

Awardee UEI

P29YCLCMNYG5

Original Solicitation

Notice ID: 8eceef36b293b7ba9d3b262aa123a76a

Posted Date: Aug 12, 2019

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12819719R0014
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 2×
    Combined SynopsisApr 24, 2019

    Mastication Thinning at Tonto National Forest

    Notice e42602a1ed6983597b44673876cf2614 on SAM.gov

  2. AwardedCurrentAug 12, 2019

    Mastication Thinning at Tonto National Forest

    Notice 8eceef36b293b7ba9d3b262aa123a76a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12819719R0014

Archive Date

Aug 24, 2019

Office Address

TUCSON, AZ, 85701