GovChime
Notice ID: 5e8bfeb79fb744b6ad1b1e0d82359c6fCombined Synopsis/Solicitation

Cinnabar Boat Ramp Construction

Archived on December 2, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
October 27, 2023
Notice type
Combined Synopsis/Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC IM
Place of performance
Gardiner, MT
Last updated
Dec 4, 2025

Identifiers

Solicitation number
1282B123Q0092
Notice ID
5e8bfeb79fb744b6ad1b1e0d82359c6f

Description

The purpose of this contract is to provide construction of the following at the Cinnabar Access Site on the Yellowstone River: 1) Boat Ramp, 2) Toilet Relocation, 3) Optional Parking Lot Expansion, and 4) Optional Concrete Surfacing of the New Boat Ramp. Additional details for each item are included in the Statement of Work.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:1282B123Q0092
  1. Combined Synopsis
  1. Combined SynopsisCurrentOct 27, 2023

    Cinnabar Boat Ramp Construction

    Notice 5e8bfeb79fb744b6ad1b1e0d82359c6f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-AwardedOpen
DK Heart Butte Dam Safety Modification PRE - SOLICITATION NOTICE 140R6026R0004 The Bureau of Reclamation (hereinafter referred to as Reclamation) Missouri Basin Regional Office intends to solicit a Request for Proposals (RFP) on or around April 10, 2026, as described in this Pre-Solicitation Notice. The RFP will be issued via the Sam.Gov web page at https://sam.gov Reclamation Dakotas Area Office (DKAO) has a need for a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the Heart Butte dam infrastructure as described below. The solicitation will be issued under full and open competition. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the Reclamation Missouri Basin Regional Office previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this pre-solicitation notice. This procurement will utilize Far Part 15 procedures. The government intends to award a Firm Fixed Price purchase order to one contractor to accomplish this scope of work. Heart Butte Dam Safety Modification (HBSDM) Project Scope of Work The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. Installation of temporary structural shoring to support conduit integrity during repair operations. Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction Construction of a new sand filter trench to intercept and manage seepage flows. Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. Please see Attachment #1 (00 00 01_Specifications_2.23.26) for a copy of the current Reclamation specifications for more information. The government intends to award a Firm Fixed Price contract for the forthcoming solicitation with discussions. The government is seeking a waiver from the requirements for the implementation of a Project Labor Agreement (PLA). Working hours are anticipated to be 24 hours a day for 6 days a week. The government is requesting responses to this pre-solicitation announcement no later than March 31, 2026 at 1700MT. Please send all correspondence related to this pre-solicitation announcement to Mitchell Frost at mfrost@usbr.gov. It is incumbent upon contractors to monitor the Sam.Gov for RFP release and all subsequent amendments, if applicable. Effective October 26, 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database when submitting an offer or quotation. Note: Registering in ¿SAM¿ does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractors Unique Entity Identifier (UEI) is required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220. Training videos are also available on the SAM.gov website under Learning Center; to help users understand the features and functionality of the site. Payment Requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform (IPP) system. The IPP website is located at https://www.ipp.gov. The contractor must use the IPP website to register access and submit requests for payment. Contractors may obtain assistance by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirements to use IPP for invoice submission, the contractor must submit a waiver request in writing to the Contracting Officer with its proposal. The estimated price of this construction effort is more than $10,000,000. This pre-solicitation notice is not a RFP and does not in any way authorize vendors to incur costs on behalf of the Government.
-Pre-Solicitation03/31/2026
Heart Butte Dam Modification Sources Sought Notice December 18, 2025 This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this Sources Sought notice. Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems ¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. ¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works ¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. ¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation ¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. ¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation ¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. ¿ Installation of temporary structural shoring to support conduit integrity during repair operations. ¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations ¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. ¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation ¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. ¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction ¿ Construction of a new sand filter trench to intercept and manage seepage flows. ¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation ¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. ¿ All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures ¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. ¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing ¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements. The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days. The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million. The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued. Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026.
-Market Research01/04/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0004 is issued as a Request for Quotation (RFQ) for updates to the Grizzly Bear Campground. Updates include: Road alignment will be adjusted to accommodate expected traffic, subbase will be enhanced. The water system well will remain; the pumphouse, service and distribution lines, and point-of-use hydrants will be replaced and rerouted to better serve campers. The information board will be replaced and relocated. Host and Volunteer Sites will each to be equipped with sewage vault, water, and electric services. Campsites will be redesigned for accessibility and improved layout, parking and functionality. A new stick-built double toilet and stick-built pump house are part of the project. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 The small business size standard is $45.0M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Solicitation11/20/2026
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240BH27Q0002 is issued as a Request for Quotation (RFQ) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation on the Uinta/Wasatch/Cache National Forest. This project consists of reconstructing portions of the Tony Grove Dam as shown in the drawings and described in the specifications. This also includes replacing outlet works and raising the dam crest along with the addition of embankment material. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237990. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency. Amendment 01 - Summary: Extend quote due date to November 20, 2026. Amendment 02 - Summary: Extend quote due date to December 14, 2026.
-Combined Synopsis12/14/2026

Additional Details

Solicitation Number

1282B123Q0092

Archive Date

Dec 2, 2023

Office Address

Washington, DC, 202500001