GovChime
Notice ID: 0fcfe711d1744ee686f303f42b1b1763Solicitation

Rifle Bunkhouse Siding Installation

Archived on September 20, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
August 27, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238170: Siding Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
White River National Forest
Place of performance
Rifle, 81650
Last updated
Sep 25, 2026

Identifiers

Solicitation number
1282B124Q0088
Notice ID
0fcfe711d1744ee686f303f42b1b1763

Description

***See Amendment 0001 for Questions and Answers and List of Attendees. See Attachments 002- Statement of Work Version 2 and Attachment 005- Measurements and Photographs.*** The Rifle Bunkhouse is a temporary housing accommodation for seasonal and permanent new-hire employees working in the Rifle Ranger District (RRD) of the White River National Forest (WRNF). The bunkhouse siding is composed of wood panels approximately 4’x10’ in size that have been cut to fit. The material has been weathered due to the sun and dry conditions with little shade providing protection. The lower portion of the bunkhouse siding below the sill plates consists of stucco/foam-type material. Some birds have created holes in the wooden siding and made nests in the wood framed wall cavities. The windows are also heavily weathered, with failing seals and need replacement. The work for this project consists of removing the current siding and related window trim from the bunkhouse, along with any damaged plywood sheathing underneath. The damaged plywood will be replaced, and a weather resistant house wrap will be installed around the building. Non-fixed windows will be replaced with vinyl windows and properly sealed/flashed from water intrusion. Cement fiber siding, trim, and a drip edge will be installed above trim, windows, and siding transitions as appropriate. Old unnecessary trim features around windows and building walls shall be removed and new trim and siding will be installed in a clean and simple fashion that matches the aesthetic of the adjacent Rifle District office building. The new siding will be painted with a color matching the Rifle District office building. Pre-bid Site Visit will be held on August 15, 2024 at 9:30AM (Mountain Time). Enter through the gate, just past the Rifle Ranger Station. Meet in the parking lot on the right; in front of the bunkhouse. See Attachment 003- Map and Directions. All questions regarding the Solicitation are due via email to heather.cole@usda.gov by 5:00PM Mountain Time on August 22, 2024.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:1282B124Q0088
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    SolicitationCurrentAug 5, 2024

    Rifle Bunkhouse Siding Installation

    Notice 0fcfe711d1744ee686f303f42b1b1763 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1282B124Q0088

Archive Date

Sep 20, 2024

Office Address

GLENWOOD SPRINGS, CO, 81601