Notice ID: ff466fbbfadb635d7bfd5fd42ce7e8aaAward NoticeAwarded
GLEES Powerline Relocation
Awarded on September 25, 2018. Full description on SAM.gov.
Awarded tounder 1282FT18C0009 (source: SAM.gov award notice)• $202.5K
Overview
- Posted
- October 4, 2018
- Notice type
- Award Notice
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- ROCKY MTN RESEARCH STATION
- Place of performance
- The project is located approximately 6 miles northwest of Centennial, Wyoming. The project starts at approximately one half mile off the intersection of WY State Hwy 130, and National Forest System Road 317., WY
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
- Award date
- Sep 25, 2018
- Award amount (SAM.gov award notice)
- $202.5K
Identifiers
- Solicitation number
- 1282FT18R0012
- Notice ID
- ff466fbbfadb635d7bfd5fd42ce7e8aa
- Award number (PIID)
- 1282FT18C0009
Description
Amendment 0001 is as follows: Provided Pre Bid Information, updated Section B - The Schedule, and provided Revised Drawings for Attachment 3. All other terms and conditions remain the same.
Award Overview
Award Number
1282FT18C0009
Award Amount (SAM.gov award notice)
$202.5K
Award Date
Sep 25, 2018
Awardee
Awardee UEI
JN9PMJJKZBN5
Original Solicitation
Notice ID: ff466fbbfadb635d7bfd5fd42ce7e8aa
Posted Date: Oct 4, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
1282FT18R0012- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationJul 25, 2018
GLEES Powerline Relocation
- AwardedCurrentOct 4, 2018
GLEES Powerline Relocation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This project includes the removal of two existing steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest; two 300-gallon steel underground fuel storage tanks associated with two neighboring residential dwellings. This includes cleanup and disposal of any contaminated soils. Contractor shall field verify all new and existing conditions affecting the work of this contract before ordering products. | - | Combined Synopsis | 11/13/2026 |
On October 21, 2026, amendment 0003 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 11/04/2026 to 11/17/2026. 2. Post RFI Q&A labeled "C04a RFI QA 1240LT26Q0109 102026." 3. Post revised SOW labeled "C04b New SOW 1240LT26Q0109 102026." 4. Post revised Specs labeled "C04c New Specs 1240LT26Q0109 102026." 5. Post measurement and payment supplement labeled "C04d Measurement PYMT Sup 1240LT26Q0109 102026." 6. Post measurement and payment specs labeled "C04e Measurement PYMT Spec 1240LT26Q0109 102026." 7. Post revised SOI labeled "C04f New SOI 1240LT26Q0109 102026." 8. Post options supplement labeled "C04g Options Supplement 1240LT26Q0109 102026." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************************* On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/27/2026 to 11/04/2026. 2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************** On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.This amendment must be acknowledged and submitted with your quote. ************************************************************************************************************************* Buckboard Marina Water System Improvements | - | Combined Synopsis | 11/17/2026 |
| - | Awarded | Open | |
| - | Awarded | Open | |
EHRM Training and Administrative Support Space Project No.: 504-21-703 Solicitation No.: 36C25727B0001 The Amarillo VA Medical Center has a requirement for the construction of infrastructure and concrete pad space to support mobile EHRM training and administrative facilities at the Amarillo VA Health Care System, 6010 Amarillo Blvd West, Amarillo, TX 79106. The contractor shall provide all labor, supervision, materials, equipment, supplies, tools, and construction services necessary to provide electrical power, domestic water, sanitary sewer, and telecommunications fiber to three utility pad locations. The work also includes constructing concrete pads in accordance with the drawings and specifications and repairing or restoring landscaping, roads, sidewalks, and other site areas disturbed by construction Network Contracting Office 17 anticipates awarding a Firm-Fixed Price Construction contract. The anticipated method of procurement shall be an Invitation for Bid (IFB) in accordance with the procedures set forth in Parts 14 and 36 of the Federal Acquisition Regulation (FAR). Period of Performance: The period of performance (POP) shall be 183 calendar days after issuance of the Notice to Proceed (NTP). NAICS & Size Standard: The NAICS code for this procurement is 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $45.0 Million. Construction Magnitude: The estimated price ranges between $0 and $1,000,000. Tentative Solicitation Date: November 30, 2026 December 30, 2026 Tentative Award Date: January 20, 2027 Program Office Points of Contact: Contracting Officer s Representative (COR):Â Logan Dunn, Logan.Dunn@va.gov. Contracting Officer POC: The POC for this project is Makarim Abdul-Jabbar. She can be contacted by email at makarim.abdul-jabbar@va.gov. Important Notice: Apparent successful offerors must apply for and receive certification from the U.S. Small Business Administration (SBA) in accordance with 13 CFR Part 128 and VAAR 819.70 The VA Veterans First Contracting Program. Offerors must be certified by the U.S. Small Business Administration (SBA) as a Service-Disabled Veteran-Owned Small Business (SDVOSB) and be listed in SBA s Small Business Search (SBS) database prior to submission of their offer. Failure to be certified and listed in SBA s SBS database at the time of offer submission may result in the offer being deemed nonresponsive. Offerors are responsible for ensuring their SBA certification and registration information are current and accurate prior to submission of an offer End of Document | - | Pre-Solicitation | 11/21/2026 |
Additional Details
Solicitation Number
1282FT18R0012
Archive Date
Jul 17, 2019
Office Address
FORT COLLINS, CO, 80526