Notice ID: e396e8f6ebd448349721317ce05bce8eSolicitation
Safford Engine Bay Replacement
Archived on October 2, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- September 14, 2020
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Southwestern Regional Office, Region 3
- Place of performance
- Safford, AZ, 85546
- Last updated
- Apr 29, 2026
Identifiers
- Solicitation number
- 12837120Q0204
- Notice ID
- e396e8f6ebd448349721317ce05bce8e
Description
Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work necessary to complete work according to the drawings and specifications. SITE VISIT: SEPTEMBER 9, 2020 1000 AM 111 9th Street, Safford, AZ 85546 (Township 7 South, Range 26 East, Section 17) In accordance with the Miller Act Bid (20%),Performance (100%), and Payment Bonds (100%) are required. In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $150,000.00 to $200,000.00. NAICS: 236220 SIZE STANDARD: $39.5M TOTAL SMALL BUSINESS SET ASIDE
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12837120Q0204- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentAug 31, 2020
Safford Engine Bay Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Bureau of Land Management (BLM) has a construction requirement which consists of all labor, materials, equipment, and supervision to construct two (2) crew quarters buildings and associated site development work within BLM property at 906 West Davis Street, Rawlins WY. The project is intended to replace and improve barracks capacity supporting BLM field operations in Rawlins, Wyoming. In addition to construction of the two crew quarters buildings, the requirement includes the associated site work, utility connections, access, grading, drainage, and other improvements necessary to deliver complete, functional facilities. The contractor will be responsible for coordinating labor, materials, equipment, supervision, scheduling, quality control, and site safety throughout performance, with the objective of completing the work in accordance with the contract documents and applicable federal, state, and local requirements. | 64% | Pre-Solicitation | 11/27/2026 |
GAOA RAWLINS BARRACKS REPLACEMENT | 64% | Market Research | 11/10/2026 |
The U.S. Army Corps of Engineers, New York District is issuing an invitation for bid to award a Firm Fixed Price construction contract for the demolition of existing building, site Improvements and provide a turnkey modular office facility. The scope includes the demolition of an existing 10,000 SF building (with basement, in-ground pool, and pool shed), Hazardous Materials Abatement and Disposal, Site Improvements (SWPPP Controls, Sidewalks, Parking, Landscaping, Temp Fencing, Utilities Infrastructure including Water, Sewer, Electrical, Telecom tie-ins), and construction of a new office space of approximately 5,700 square feet, composed of custom modular units. The facility will be a single-story complex with a u-shaped space opening onto a small deck. It will house open offices with cubicles, six private offices, two conference rooms, four single-user bathrooms, a kitchenette/pantry room, lactation room, storage closets, and a mechanical room. The project scope encompasses incidental demolition, site prep work, foundations, underground utility hook ups, and site lighting. The contractor will also be responsible for providing furniture, fixtures, and equipment based upon the drawings and specifications. The building and site infrastructure are required to have a minimum life expectancy of 10 to 15 years. The contract duration will be 136 calendar days for the entire project with phasing work involved. NAICS: 236220 Size standard: $45 million. Project magnitude is between $1,000,000 - $5,000,000. | 59% | Solicitation | 12/07/2026 |
VA Personnel Security Adjudication Center (PSAC): Work includes Design-Build (DB) construction of VA Personnel Security Adjudication Center (PSAC) facility next to Bldg. #192 facility at the Eugene J. Towbin VA Healthcare Center campus in North Little Rock, AR.The new building must be designed to serve approximately 75 Full-Time Equivalents (FTEs).The Government will award a base contract for an approximate 10,000 SF, two-story building supported by a parking lot with a capacity for minimum 25 vehicles with the total number of parking spaces maximized during design. Contingent upon funding availability at the time of award, the Government may exercise an option for the building and parking lot to be supported by a physical security fence including automated gate access and controls. | 59% | Solicitation | 11/19/2026 |
The U.S. Army Corps of Engineers, New York District intends to issue an invitation for bid to award a construction contract for the design and construction of a modular office space located along Steamboat Road on the US Merchant Marine Academy Campus (USMMA) adjacent to 307 Steamboat Road. The project magnitude is between $1-5M.This project will be advertised as 100% total Small Business Set-Aside. Summary of Work: The project objective is to design and provide a turnkey modular office facility. The scope includes the design and construction of a new office space of approximately 5,700 square feet, composed of custom modular units. The facility will be a single-story complex with a u-shaped space opening onto a small deck. It will house open offices with cubicles, six private offices, two conference rooms, four single-user bathrooms, a kitchenette/pantry room, lactation room, storage closets, and a mechanical room. The project scope encompasses incidental demolition, site prep work, foundations, underground utility hook ups, and site lighting. The contractor will also be responsible for providing furniture, fixtures, and equipment based upon the drawings and documentation provided in the Specifications package. The building and site infrastructure are required to have a minimum life expectancy of 10 to 15 years. The contract duration will be 136 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 236220 for Commercial a nd Institutional Facilities. Solicitation has been posted. See link below. https://sam.gov/workspace/contract/opp/74ce082cc2f34be4926ac48ccf9cf9a5/view | 59% | Pre-Solicitation | 12/07/2026 |
Additional Details
Solicitation Number
12837120Q0204
Archive Date
Oct 2, 2020
Office Address
ALBUQUERQUE, NM, 87102