RFI added - Installation of two parallel 6-strand single mode fiber optic runs connecting upper Individual Distribution Frame (IDF) to lower IDF. The runs will connect from the WSU corner to the basement for the USDA, ARS in Wenatchee, WA

Archived on October 9, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM EDT
Posted
September 20, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of AgricultureAGRICULTURAL RESEARCH SERVICE

Notice details

Office
USDA ARS AFM APD
Place of performance
Wenatchee, Washington, 98801
Last updated
Nov 7, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12905B25Q0034
Notice ID
037ad2f2d0c04515814ee03a4b00b217

Description

RFI added 9/20/2025 with Questions asked and Responses.  Please see the attachment labeled "RFI QandA for 12905B25Q0034".  Interested contractors are required to acknowledge this RFI in their solicitation response.

There is a site visit added to be held Tuesday, September 23, 2025 at 11 a.m.  PDT.  If you are interested in attending, please send a list of attendees to shelley.steen@usda.gov.

************************************************************************************************************************************************

This is a combined synopsis/solicitation for commercial items prepared in accordance with the procedures contained in FAR Part 12.6, Acquisition of Commercial Items, and FAR Part 13, Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued.

The solicitation number is 12905B25Q0034 and is issued as a Request for Quotation (RFQ).

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) Number 2025-05 dated 08/07/2025. Service Contract Labor Standards Wage Determination Number 2015-5541 Revision 26 effective July 8, 2025, for Chelan County Washington is applicable and is attached.

This solicitation is issued as a Total Small Business Set-Aside.   The associated NAICS code is 238210 and the small business size standard is $19,000,000.00.

List of CLINS, item descriptions, quantities and units of measure:

CLIN 0001      Installation of two parallel 6-strand single mode fiber optic runs connecting upper Individual Distribution Frame (IDF) to lower IDF.  The runs will connect from the WSU corner to the basement for connection to the WSU network.

Description/Statement of Work/Specification:

Please see attached

Date(s) and place(s) of delivery and acceptance:

The completed project is due no later than 90 days after receipt of the order.

FAR Provision 52.212-1, Instructions to Offerors-Commercial, is incorporated by reference and applies to this acquisition. Please see the attached RFQ terms and conditions for the submission requirements and its addendum.

Evaluation:

For the evaluation criteria, please see the attached RFQ terms and conditions.

Quoters are required to complete in full FAR Provision 52.212-3, Offeror Representations and Certifications-Commercial Items (DEVIATION), with their quote online at SAM: www.sam.gov.  A quoter must state in their quote if they completed FAR 52.212-3 online and that is it up-to-date and valid. See the attached RFQ terms and conditions for more requirements.

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM

FAR Clause 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition. Please see the attached RFQ terms and conditions for its Addendum.

FAR Clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items (DEVIATION), is incorporated and applies to this acquisition. Please see the attached RFQ terms and conditions that are applicable to the acquisition.

There are no additional contract requirement(s) or terms and conditions (such as contract financing arrangements or warranty requirements) determined by the contracting officer to be necessary for this acquisition and consistent with customary commercial practices.

The Defense Priorities and Allocations System (DPAS) and assigned ratings are not applicable to this solicitation.

Date, time and place quotes are due.

Quotes are due by September 24, 2025, at 3:00pm EDT.

Submit quotes to the following e-mail address(es), by the quote due date and time:

Shelley.Steen@usda.gov

Late quotes after the established deadline may be considered only if it is in the government’s best interest and if it will not unduly delay award.

Any and all questions regarding this solicitation shall be submitted in writing to shelley.steen@usda.gov no later than September 23, 2025.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (4)

  • RFI QandA_12905B25Q0034.docx

    20 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • WD2015-5541 Rv26 Eff 07082025-Chelan-code 23931.pdf

    4.5 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • FINAL SOW- Single mode fiber installation project.docx

    1.2 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Terms and Conditions with Provisions and Clauses.docx

    64 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Installation of two parallel 6-strand single mode fiber optic runs connecting upper Individual Distribution Frame (IDF) to lower IDF. The runs will connect from the WSU corner to the basement for the USDA, ARS in Wenatchee, WA

    Notice cae26cdb8cbb4354b132230991b24a86 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    RFI added - Installation of two parallel 6-strand single mode fiber optic runs connecting upper Individual Distribution Frame (IDF) to lower IDF. The runs will connect from the WSU corner to the basement for the USDA, ARS in Wenatchee, WA

    Notice 037ad2f2d0c04515814ee03a4b00b217 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12905B25Q0034

Archive Date

Oct 9, 2025

Office Address

BELTSVILLE, MD, 20705