GovChime
Notice ID: d998bc4ebe944214b9f21f8dc60ca123Combined Synopsis/Solicitation

Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Sayles Canyon Trail Bridge Repairs

Archived on June 15, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−05:00
Posted
May 30, 2024
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC SW
Place of performance
Placerville, CA
Last updated
Dec 4, 2025

Identifiers

Solicitation number
12970224R0034
Notice ID
d998bc4ebe944214b9f21f8dc60ca123

Description

SCOPE OF CONTRACT: The Governments general and specific requirements for the repair of the Sayles Canyon Trail Bridge project are as follows: Repair metal stringers/nailers and replace wooden decking and running planks on the trail bridge spanning Sayles Creek. Remove logs, dimensional lumber, and plywood (if any) that served as temporary decking. Minimum dimensions for the Sayles Canyon trail bridge are: 72 width between top railing which shall be no less than 42 above top of deck. The maximum opening of side railings shall be 8 . Contracting Officer Representative (COR) will verify the staging area with the contractor, which is 75 yards up the road and above the bridge site. Contractor shall supply and install all dimensional lumber, associated hardware and appurtenances, as shown in the drawings. Location and mileage from Silver Fork Store in Kyburz, CA: To Sayles Canyon trail bridge-travel east on Hwy. 50 13.5 miles, turn right on Sayles Canyon Cabin Tract Road (FS 11N16), travel 0.3 miles to the first sharp left-hand turn. The Pony Express trail veers off to the right to the bridge site. Map(s): See attachments. MAGNITUDE OF CONSTRUCTION PROJECT: The price range for this contract is: Between $25,000 and $100,000. A pre-bid site visit will be held May 22, 2024 : Contractors will meet Forest Service (FS) personnel at 9:00 AM (local time) at the staging area of the lowest elevation bridge, which would be "Clubhouse". This would be found on the left (west) side of map Caldor Trail Bridge Relief #1. Traveling eastbound on Hwy. 50, and less than a mile east of the town of Kyburz is FS Road # 11N43, where a sharp left turn is required. This road is not signed on Hwy.50 nor is there a left-hand turn lane. It is unknown how long it will take the group to hike in, assess, and hike out, so it would be best if perspective offerors and FS personnel caravan to the other bridge sites together after the first one. SOLICITATION NO. 12970224R0034 PERIOD OF PERFORMANCE 08/15/2024 THROUGH 11/15/2025 NAICS CODE: 237310 Other Heavy and Civil Engineering Construction, $45M BONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE DAVIS-BACON WAGES APPLY RFIs to be submitted to george.staggs@usda.gov by 1200 CDT May 23, 2024.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12970224R0034
  1. Combined Synopsis
  1. 10×
    Combined SynopsisCurrentMay 1, 2024

    Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Sayles Canyon Trail Bridge Repairs

    Notice d998bc4ebe944214b9f21f8dc60ca123 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12970224R0034

Archive Date

Jun 15, 2024

Office Address

Washington, DC, 20250