GovChime
Notice ID: aa87535b45f743379049ece903fc98dcSolicitation

Fish Creek AOP Bridge

Archived on January 20, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−08:00
Posted
April 26, 2018
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE
Place of performance
Sequoia National Forest, Tulare County, Fish Creek Campground, Inyokern, CA, 93527
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025

Identifiers

Solicitation number
129JGP18R0037
Notice ID
aa87535b45f743379049ece903fc98dc

Description

Amendment 1 has been issued which includes a revised drawing #2, site visit attendance roster, site visit notes, and a reference document. The selected contractor shall furnish all labor, equipment, and materials to accomplish the work under this contract. Work includes the following: 1. Demolish and remove the existing 15' Wide by 8' High by 70' Long culvert arch pipe. 2. Clear and grub vegetation as required within the clearing limits of the project. 3. Excavate the road prism to provide the stream channel as shown on the drawings. 4. Furnish adn install a new 58' span precast pre-stressed concrete road bridge with case in place concrete abutments, guard rails, and approach rails as shown on the drawings. 5. Furnish and install riprap for slope and abutment protection. 6. Patch pave the bridge approaches with aggregate base and hot mix asphalt. The project is located in Tulare County, California, within the Sequoia National Forest near the Fish Creek Campground. A site visit will be held on April 25, 2018. Details will be in the complete specification package to be uploaded on or around March 30, 2018. The Government estimate for this project is between $500,000 and $1,000,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:129JGP18R0037
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMar 16, 2018

    Fish Creek AOP Bridge

    Notice b2c39bc5b640f2ed25acf8659d4c3129 on SAM.gov

  2. 2×
    SolicitationCurrentApr 26, 2018

    Fish Creek AOP Bridge

    Notice aa87535b45f743379049ece903fc98dc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

129JGP18R0037

Archive Date

Jan 20, 2022

Office Address

NEVADA CITY, CA, 95959