GovChime
Notice ID: 2e4ec6b71e344884b1550bddcac575dbCombined Synopsis/SolicitationArchived

USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

Archived on September 11, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM CDT
Posted
August 26, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFARM PRODUCTION AND CONSERVATION BUSINESS CENTER

Notice details

Office
FPAC BUS CNTR-ACQ DIV
Place of performance
Denton
Last updated
Nov 9, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12FPC325B0006
Notice ID
2e4ec6b71e344884b1550bddcac575db

Description

Please see attachment combined synoposis solicitation and Statement of Works (SOW) for further detials. This solicitation is a Total Small Business Set-Aside. A firm fixed price construction contract is anticipated to be awarded under Sealed Bidding in FAR Part 14. Site Visit is scheduled for 8/13/2025 at 10:00AM meeting at: 525 S. Loop 288 Suite C-1 Denton, TX 76205 A bid guarantee shall be 20% of the bid price or $3 Million, whichever is less. The estimated magnitude of the project is between $1,250,000 and $1,750,000 *Site work will be completed one at a time, finish one site requried work then will move on to the other site to begin work. The upstream wave berm repair of Site 11 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap. The upstream wave berm repair of Site 14 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap. The existing, constructed plunge basin has experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basin will be armored with a 2 feet thick blanket of rock riprap.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (10)

  • S01_12FPC325B0006.pdf

    809 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • Hickory Creek Sites Questions Answers.pdf

    106 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Hickory 11 Repair - SP FINAL 8-14-2025.pdf

    497 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Hickory 14 Repair - SP FINAL 8-14-2025.pdf

    672 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Hickory Creek Sites 11 and 14 Sign In Sheet.pdf

    165 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment D -Hickory 14 Repair.pdf

    9.4 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment D -Hickory 11 Repair.pdf

    5.7 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment C -WD 2015-5227 Rev 26 7-8-2025.pdf

    506 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment B -HickoryCr14_Repari-SOW.pdf

    190 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment A -HickoryCr11_Repari-SOW.pdf

    190 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice 0d39708047754981a96834225a12fd90 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice a5bd256c7ce54f95be40765fcdfcfc55 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice e6287e66e4434dbeaf0a638f83c2b6f5 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice 6b124e9f20d8412f8d699c1826b19d77 on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice 10f3f7a27db34b7395be6e67e8cc5a73 on SAM.gov

  6. 6
    Version 6Combined Synopsis/SolicitationArchived

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice 0580ff1dfab848ebb9bc43afb0d9c446 on SAM.gov

  7. 8
    Version 8Combined Synopsis/SolicitationArchivedCurrent

    USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

    Notice 2e4ec6b71e344884b1550bddcac575db on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12FPC325B0006

Archive Date

Sep 11, 2025