Notice ID: 01d055d827c84725aa1e9d3a9e130aeaCombined Synopsis/SolicitationArchived
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Archived on July 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EDT
- Posted
- June 25, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFARM PRODUCTION AND CONSERVATION BUSINESS CENTER
Notice details
- Office
- FPAC BUS CNTR-ACQ DIV
- Place of performance
- Massachusetts, 01752
- PSC
- Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 12FPC326B0012
- Notice ID
- 01d055d827c84725aa1e9d3a9e130aea
Description
Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Award Overview
Contacts
Contracting Officer
Primary Contact
Mark Domingo
Documents
Files (8)
- Download
Bid Opening Info - SAM posting.pdf
119 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Tyler Dam Addendum No. 1 Jun10-2026.pdf
32 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
IFB - 12FPC326B0012 Combined Synopsis.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Questions and Answers.pdf
109 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Pre Bid Site Visit Attendance - Tyler Dam.pdf
6.2 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment 3 - WD MA20250006 1-30-2026.pdf
54 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 2 Tyler Dam Drawings.pdf
12 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 1 Specifications.pdf
1.8 MBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
- 2Version 2Combined Synopsis/SolicitationArchived
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
- 3Version 3Combined Synopsis/SolicitationArchived
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
- 4Version 4Combined Synopsis/SolicitationArchived
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
- 6Version 6Combined Synopsis/SolicitationArchivedCurrent
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Similar Opportunities
Additional Details
Solicitation Number
12FPC326B0012
Archive Date
Jul 10, 2026
Office Address
WASHINGTON, DC, 20250