GovChime
Notice ID: 01d055d827c84725aa1e9d3a9e130aeaCombined Synopsis/SolicitationArchived

NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

Archived on July 10, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
June 25, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFARM PRODUCTION AND CONSERVATION BUSINESS CENTER

Notice details

Office
FPAC BUS CNTR-ACQ DIV
Place of performance
Massachusetts, 01752
PSC
Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12FPC326B0012
Notice ID
01d055d827c84725aa1e9d3a9e130aea

Description

Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (8)

  • Bid Opening Info - SAM posting.pdf

    119 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Tyler Dam Addendum No. 1 Jun10-2026.pdf

    32 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • IFB - 12FPC326B0012 Combined Synopsis.pdf

    1.1 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Questions and Answers.pdf

    109 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Pre Bid Site Visit Attendance - Tyler Dam.pdf

    6.2 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Attachment 3 - WD MA20250006 1-30-2026.pdf

    54 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 2 Tyler Dam Drawings.pdf

    12 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 1 Specifications.pdf

    1.8 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Notice 765d4d1f291247d3be06016751e4b1d1 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Notice 8eb83b2ee91b4b8b997bba01f3437005 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Notice 58f98c934ea44c4fb89961ebfbcf6b54 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Notice 007f0ef1aa00414482600c2a9436503f on SAM.gov

  5. 6
    Version 6Combined Synopsis/SolicitationArchivedCurrent

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Notice 01d055d827c84725aa1e9d3a9e130aea on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

12FPC326B0012

Archive Date

Jul 10, 2026

Office Address

WASHINGTON, DC, 20250