GovChime
Notice ID: 8b21caab1f9c46bfae4243b4f64c40daCombined Synopsis/Solicitation

Amendment 2 to Solicitation for Ultra-High Vacuum Sample Backout Chamber Extension of Time

Archived on March 19, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
February 23, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
334516: Analytical Laboratory Instrument Manufacturing
Agency
Department of CommerceNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

Notice details

Office
DEPT OF COMMERCE NIST
Place of performance
Boulder, Colorado, 80305
PSC
6640: LABORATORY EQUIPMENT AND SUPPLIES
Last updated
Aug 21, 2026

Identifiers

Solicitation number
1333ND26QNB030068
Notice ID
8b21caab1f9c46bfae4243b4f64c40da

Description

AMENDMENT 2:

Extension of time 1 week from February 25,2026 to new date for responses March 4,2026.  

AMENDMENT TO SOLICITATION FOR VENDOR QUESTIONS

Solicitation 1333ND26QNB030068 Ultra High Vacuum Sample Backout Chamber

Vendor Question 1: 

To accurately provide a quote for the chamber and frame, I would need a drawing, STEP file, and/or sketch, as a written description alone is not sufficient for an accurate quote.

NIST Response:

There are many ways to design and assemble a system with the capabilities that we are requesting. We have not provided a technical drawing to allow the vendor the flexibility to design a system to meet our specifications as they see fit. We will evaluate on conformance to specifications, not a particular design.

Vendor Question 2:

Regarding Technical Specification b. “Partial pressure for masses >44 AMU: <5e-11 Torr”:  How is this intended to be controlled / measured with a base pressure of 1e-8 Torr.

NIST Response:

We will verify the stated specification with an RGA unit in our lab. Ultimately, this specification is to ensure that the UHV system is not contaminated with higher amu contaminants. The overall pressure is allowed to be 1e-8 Torr due to lower amu components (e.g. water) that we can more readily get rid of with a bake-out. We are not equipped to do the requisite UHV cleaning for higher mass contaminants (silicones, oils, etc.) so this requirement ensures the vendor provides us with a UHV-clean system.

Vendor Question 3:

Will a cylindrical chamber work rather than a cube or a sphere, so long as the volume requirements are met and there are enough ports?

NIST Response:

A cylindrical chamber with the same 12” opening dimensions would also suffice.

Vendor Question 4:

What is the geometry of the sample types to be going into the chamber? Is it like a wafer?

NIST Response:

We will be using this chamber on a variety of sample sizes and shapes.

As defined in the attached Combined Synopsis Solicitation, Statement of Work and applicable Clauses and Provisions.  

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Elizabeth Timberlake

Secondary Contact

Documents

Select documents to download

Showing 3 of 3 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGYFeb 23, 2026261.76 KB
Combined Synopsis/SolicitationNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGYFeb 23, 202642.02 KB
Combined Synopsis/SolicitationNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGYFeb 23, 202671.87 KB

Lifecycle

Solicitation:1333ND26QNB030068
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentFeb 12, 2026

    Amendment 2 to Solicitation for Ultra-High Vacuum Sample Backout Chamber Extension of Time

    Notice 8b21caab1f9c46bfae4243b4f64c40da on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

1333ND26QNB030068

Archive Date

Mar 19, 2026

Office Address

GAITHERSBURG, MD, 20899