Notice ID: 3c1628bc9e3c40ec90689cbf89a78b90Award NoticeAwarded
Y--BRIDGE REPLACEMENT PROJECT
Awarded on May 28, 2024. Full description on SAM.gov.
Awarded tounder 140A1623D0026 (source: SAM.gov award notice)• $4.4M
Overview
- Posted
- May 28, 2024
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of the Interior
Notice details
- Last updated
- Dec 4, 2025
- Award date
- May 28, 2024
- Award amount (SAM.gov award notice)
- $4.4M
Identifiers
- Solicitation number
- 140A0324R0003
- Notice ID
- 3c1628bc9e3c40ec90689cbf89a78b90
- Award number (PIID)
- 140A1623D0026
Description
BRIDGE REPLACEMENT PROJECTS
Award Overview
Award Number
140A1623D0026
Award Amount (SAM.gov award notice)
$4.4M
Award Date
May 28, 2024
Awardee
Awardee UEI
EZMNZ2HYHFB7
Awardee CAGE Code
4EHW4
Original Solicitation
Notice ID: 3c1628bc9e3c40ec90689cbf89a78b90
Posted Date: May 28, 2024
Original Response Deadline: Not specified
Task Orders Under This IDV
Top 10 by total obligated
- $220.6MSigned Sep 24, 2026
- $219.6MSigned Jul 8, 2026
- $218.7MSigned Mar 3, 2026
- $218.4MSigned Aug 27, 2025
- $170.7MSigned Aug 11, 2025
- $170.0MSigned Jul 9, 2025
- $170.0MSigned Apr 30, 2025
- $170.0MSigned Sep 17, 2024
- $57.0MSigned Sep 18, 2025
- $57.0MSigned Feb 13, 2026
More From This Vendor
Top 5 most recent
- $220.6MSigned Sep 24, 2026
- $97.1MSigned Sep 23, 2026
- $38.5MSigned Sep 14, 2026
- $10.0KSigned Jul 13, 2026
- $219.6MSigned Jul 8, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140A0324R0003- Solicitation
- Awarded
This opportunity has been awarded.
- 4×SolicitationMar 4, 2024
Y--BRIDGE REPLACEMENT CONSTRUCTION PROJECT
- AwardedCurrentMay 28, 2024
Y--BRIDGE REPLACEMENT PROJECT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Bureau of Land Management (BLM) has a construction requirement which consists of all labor, materials, equipment, and supervision to construct two (2) crew quarters buildings and associated site development work within BLM property at 906 West Davis Street, Rawlins WY. The project is intended to replace and improve barracks capacity supporting BLM field operations in Rawlins, Wyoming. In addition to construction of the two crew quarters buildings, the requirement includes the associated site work, utility connections, access, grading, drainage, and other improvements necessary to deliver complete, functional facilities. The contractor will be responsible for coordinating labor, materials, equipment, supervision, scheduling, quality control, and site safety throughout performance, with the objective of completing the work in accordance with the contract documents and applicable federal, state, and local requirements. | 68% | Pre-Solicitation | 11/27/2026 |
GAOA RAWLINS BARRACKS REPLACEMENT | 68% | Market Research | 11/10/2026 |
The U.S. Army Corps of Engineers (USACE), CHARLESTON District, is requesting market intelligence information to identify qualified industry partners capable of supporting a potential Repair and Replace, Design Build to Budget, Other Transaction (OT) Agreement under 10 U.S.C. 2808a for the stated Fort Jackson Barracks Replacement, Columbia, SC. See attachments. | 67% | Market Research | 11/20/2026 |
Cove Day School Replacement & Quarters Construction Project | 66% | Solicitation | 12/03/2026 |
The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the Chesapeake and Delaware (C and D) Canal Building Replacement Project. The Chesapeake and Delaware or Canal connects the Delaware River to the Chesapeake Bay and Port of Baltimore. The canal is maintained from a field office located in Chesapeake City Maryland. This office consists of multiple buildings and shops that are essential to the continued operation of the canal. Several of these building have reached the end of their lifecycle and need to be replaced. This project will include the demolition and consolidation of the mechanics shop, bridge shop and storage buildings. A new building will be constructed to sever as a replacement of the buildings that are being removed. The building will be located along the east side of the project site. The building dimensions will be 60 feet x 150 feet with a clear ceiling height of 20 feet. The building will have a gable roof with the ridge running parallel to the length of the building. A pre- engineered metal building with tapered columns will be used. The columns will be enclosed with steel stud framing and gypsum board in the office areas. Vehicle and workshop areas will have propane fired heating. Office areas will be provided with air conditioning. The electrical service will be upgraded if necessary to provide power to the new building. The building will be connected into backup power from the existing diesel generator. Work will consist of the following activities: A.) The project scope includes all work required to design and construct a 9,000 square foot maintenance building in accordance with the Request for Proposal documents including the demolition of the four existing buildings and propane storage tank currently located at the site. Utilities serving each of the buildings being demolished must be demolished to the extents defined in section 02 41 00 Demolition. Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the Offeror is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods must reflect this by choosing the most economical type of construction allowed by code for this occupancy/project. B.) The maintenance building must be provided with Heating, Ventilation, and Air Conditioning (HVAC), electrical, communications, fire protection, life safety, plumbing systems, waste oil storage, and compressed air systems. C.) A 3,000 square foot storage shed must be designed and constructed at the location identified on the site plan. The shed design must include power and lighting. D.) The scope of work also includes civil site work consisting of site paving, installation of stormwater drainage, connection into the domestic water utility, sanitary sewer utility connection for the new maintenance building, connection of existing sanitary sewer lines into the towns sanitary sewer utility, a vehicle wash area and fire hydrants. Site work is shown in Appendix A. Site electrical work must be completed to provide the maintenance building and storage shed with power fed from the existing switch gear shed. Site telecommunications work must be completed to provide the maintenance building with connection into the existing telecommunications utilities. E.) A propane storage tank must be provided onsite and be connected to the new maintenance building and the existing propane fired generator. The estimated period of performance will be 730 calendar days. The estimated magnitude of this project is between $5,000,000 and $15,000,000. The North American Industrial Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction, with an SBA Size standard of $45.0M. | 59% | Pre-Solicitation | 11/25/2026 |
Additional Details
Solicitation Number
140A0324R0003
Archive Date
Jun 12, 2024
Office Address
ANADARKO, OK, 73005