GovChime
Notice ID: 447cee7ad94c4debad419605e18e710eAward NoticeAwarded

N--C-EB School Hands Free Faucets and Installation

Awarded on April 16, 2021. Full description on SAM.gov.

Awarded tounder 140A2321P0319 (source: SAM.gov award notice)• $70.6K

Overview

Posted
April 16, 2021
Notice type
Award Notice

Notice details

Last updated
Sep 9, 2025
Award date
Apr 16, 2021
Award amount (SAM.gov award notice)
$70.6K

Identifiers

Solicitation number
140A2321Q0223
Notice ID
447cee7ad94c4debad419605e18e710e
Award number (PIID)
140A2321P0319

Description

C-EB School Hands Free Faucets and Installation

Full description on SAM.gov

Award Overview

Award Number

140A2321P0319

Award Amount (SAM.gov award notice)

$70.6K

Award Date

Apr 16, 2021

Awardee

Awardee UEI

NLBWC2AW3WJ5

Original Solicitation

Notice ID: 447cee7ad94c4debad419605e18e710e

Posted Date: Apr 16, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140A2321Q0223
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 3×
    Combined SynopsisMar 29, 2021

    N--C-EB School Hands Free Faucets and Installation

    Notice 482f2668d3d1439787bf36ee09cd3126 on SAM.gov

  2. AwardedCurrentApr 16, 2021

    N--C-EB School Hands Free Faucets and Installation

    Notice 447cee7ad94c4debad419605e18e710e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment_04 Attached the updated Statement of Work. Notable changes include the removal of sub-panel installation as well as the inclusion of demolition and removal of the existing systems. Amendment_03 Providing an extension to give time for potential updates to quotes after adjustments to the SOW are posted following the Site Visit. // Amendment_02: Contractor Q and A added as well as new photo attachments. SITE VISIT SCHEDULED for Wednesday 12 August at 1:00PM CST. Provide a valid Drivers License number and picture for all those meaning to attend. If you cannot provide an image then please provide your full name and DoB in addition to your drivers license number. // Amendment_01: Solicitation Updated to Extend Quote Submission Date to 14 August 12:30 CST. // Requirement to source and install (2) complete 0.75-ton ductless mini-split systems meeting the specifications outlined in the SOW. Brand Name or Equal.
63%
Combined Synopsis08/21/2026
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Revolutionary FAR Overhaul (RFO) (FAR) subpart 12.2, Solicitation, Evaluation, and Award as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation JAN 2026 (eff. 01/22/2026) VAAR DEVIATION FEB 2026 (eff. 03/17/2026) VAAM Alert 26-02 (eff. 10/28/2025) Acquisition Policy Flash 26-26 eff. 03/17/2026) 4. This solicitation is for Building 41 Isolation Valve Installation and the solicitation number is 36C25627Q0081. This solicitation is a 100% SDVOSB set-aside, and the Government anticipates awarding a firm-fixed price contract from this solicitation. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $19M. The FSC/PSC is N048 Installation Of Equipment- Valves. The Central Arkansas Veterans Healthcare System is seeking to purchase the service for isolation Valves installed for steam and condensate lines IAW with attached statement of work. All interested companies shall provide quotations for the following: Supplies/Services: See Section B.2, Cost/Price Schedule Place of Performance/Place of Delivery Address: Eugene J. Towbin Healthcare Center Central Arkansas Veterans Healthcare System 2200 Fort Roots Drive B69 & B170 North Entrance North Little Rock, AR 72114 Site Visit is scheduled for November 03, 2026 at 9:30am. POC for site visit is Justin Harper at Justin.Harper2@va.gov. See attached statement of work for location. All questions are due by November 4, 2026 3PM CST. All quoters shall submit the following: Quotes should be emailed to joseph.warren@va.gov and received no later than 12:00 PM CST, November 09, 2026. Email subject line shall include, RFQ 36C25627Q0081 B41 Isolation Valve Installation . Quotes shall be submitted IAW Provision 52.212-1 Instruction to Offerors. Point of Contact Joseph Warren Contracting Officer joseph.warren@va.gov
61%
Combined Synopsis11/09/2026
Amendment 0001 - Add Comments Matrix as of 11/06/2026. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 12445127B0002 is issued as an Invitation for Bid (IFB) for Halfmoon Ranch House HVAC Installation. This project involves installing three ductless, split unit climate control system in Halfmoon Ranch, a historic house located in a remote and rural location. Currently there is no climate control system in the building. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220 The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
60%
Combined Synopsis12/07/2026
59%
Sole Source / J&AOpen
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate:
59%
Combined Synopsis10/26/2026

Additional Details

Solicitation Number

140A2321Q0223

Archive Date

May 1, 2021

Office Address

Albuquerque, NM, 87104