Notice ID: bbde6b5983994822a4713525bbf22118Award NoticeAwarded
43--Emergency Compressor Replacement for Riverside Ind
Awarded on July 9, 2024. Full description on SAM.gov.
Awarded tounder 140A2324P0466 (source: SAM.gov award notice)• $23.8K
Overview
- Posted
- July 9, 2024
- Notice type
- Award Notice
- NAICS
- 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Agency
- Department of the Interior
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Jul 9, 2024
- Award amount (SAM.gov award notice)
- $23.8K
Identifiers
- Solicitation number
- 140A2324Q0345
- Notice ID
- bbde6b5983994822a4713525bbf22118
- Award number (PIID)
- 140A2324P0466
Description
Emergency Compressor Replacement for Riverside Indian School
Award Overview
Award Number
140A2324P0466
Award Amount (SAM.gov award notice)
$23.8K
Award Date
Jul 9, 2024
Awardee
Awardee UEI
EF6NBGJ14439
Original Solicitation
Notice ID: bbde6b5983994822a4713525bbf22118
Posted Date: Jul 9, 2024
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140A2324Q0345- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 3×Combined SynopsisJun 25, 2024
43--Emergency Compressor Replacement for Riverside Ind
- AwardedCurrentJul 9, 2024
43--Emergency Compressor Replacement for Riverside Ind
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources-Sought Notice The Indian Health Service, Gallup Service Unit is issuing this sources-sought notice (SSN) to identify capable Indian-owned, economic enterprises – large (IEE) or small (ISBEE) – that can deliver and install two *DRAFT* Thermo Scientific TSX3005GA blood bank refrigerators and one *DRAFT* Thermo Scientific TSX5030FA freezer for Gallup Indian Medical Center’s (GIMC) Laboratory department. In addition, the prospective contractor must also: -Level and secure equipment as required by the manufacturer. -Verify electrical compatibility. -Configure temperature setpoints. -Configure audible, visual, and remote alarms. -Verify proper door operation and equipment functionality. -Perform complete equipment startup and commissioning in accordance with the manufacturer's installation and operating instructions. -Operational testing, temperature performance testing, alarm and monitoring verification. -Provide on-site training for GIMC staff. Other capable firms are also invited to respond to this SSN. The Contracting Officer will consider responses for Buy Indian Act (25 U.S.C. 47) opportunities first, then for set aside programs under the Small Business Act (41 U.S.C. 3104). The applicable North American Industry Classification System (NAICS) code assigned to this requirement is 333415- Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing with a small business size standard of 1,250 employees. THIS IS NOT A SOLICITATION. Information collected from this notice is purely for market research only and will be used to determine the contracting office’s acquisition strategy including competition, set asides, and locating Indian-owned economic enterprises. Submission of any information in response to this market survey is purely voluntary. The government assumes no financial responsibility for any costs incurred in response to this request for information. In accordance with FAR 4.203-1(b), offerors and quoters must be registered in System for Award Management at SAM.gov, at the time an offer or quotation is submitted and at time of award. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this notice by 11/19/2026 at 10:00AM (MST) to Adam James, Procurement Tech, at Adam.James@ihs.gov with the subject line “SSNGSUT1-20270001.” Your submission must include the following information, at a minimum: Company Profile that includes: UEI, Name and Address, Primary POC information, business size and type of ownership, socio-economic status/participation such as 8(a), WOSB/EDWOSB, SDVOSB and HUBZone, identification of Native American ownership, SAM.gov representations and certifications, and other related documentation. A brief statement of the company’s capability that relates to the described government requirement. Additional demonstration of capability may include current and past performance history for the same or similar requirement, established contracts such as GSA or VA Schedule, etc. Indian-owned Small Business Economic Enterprises (ISBEEs) and Indian-owned Economic Enterprises (IEEs) must also submit a completed IHS IEE Representation Form (attached) in accordance with HHSAR 326.606-1(b). Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. | - | Market Research | 11/19/2026 |
This technology platform from Los Alamos National Laboratory enables more reliable high-temperature heat pipe reactors by improving the way critical wick structures are manufactured and how heat pipe arrays are filled, sealed, and checked for quality. A stronger wick gives the system the capillary action needed to move liquid metal through the pipe under demanding thermal conditions, while the fill platform helps prepare clean, repeatable assemblies that are better suited for reactor-grade use. For organizations working in nuclear, space, or other high-heat environments, the Heat Pipe Reactor Wick and Fill Platform offers a more practical route to building durable thermal hardware with fewer manufacturing bottlenecks. How it Works The Heat Pipe Reactor Wick and Fill Platform begins with wick fabrication, where a fine mesh or similar material is shaped around a mandrel and compressed so the layers can be bonded into a strong porous tube. Depending on the version, the wick can be formed by drawing, hydroforming, or other controlled shaping methods before diffusion bonding locks the structure in place. After bonding, the temporary mandrel and sheath are removed by etching, leaving a porous wick with the pore structure and geometry needed for high-temperature alkali metal heat pipes. The fill process is designed to load, seal, and inspect heat pipe arrays under controlled atmosphere conditions, often using vacuum or inert gas environments. That workflow can be automated with precision metering, controlled handling, and laser welding, which helps improve repeatability and reduce contamination risk. Quality control can be built into both the wick and fill steps through inspection of the porous structure, leak testing, fill verification, and process monitoring, all of which support more consistent reactor-scale production. Technical Description The wick fabrication methods focus on producing a porous annular structure with the strength and capillary performance required for high-temperature heat pipe reactors. In one approach, mesh layers are wrapped around an etchable mandrel, compressed inside a sheath, and diffusion bonded so the layers fuse into a stable structure. After bonding, the mandrel and sheath are removed chemically, leaving a porous tube that functions as the wick. Related versions use hydroforming or modular splicing to support curved, variable or larger-format wick geometries that are difficult to make with conventional methods. A second technical element is the fill, seal and inspection platform for heat pipe arrays. The Heat Pipe Reactor Wick and Fill Platform is intended to meter alkali-metal working fluid into multiple heat pipes under vacuum or inert conditions, then seal the assemblies with controlled welding or bonding steps. Built-in inspection can confirm seal integrity, working-fluid fill quality and process repeatability. The combination of automated handling and quality control makes the technology more suitable for scale-up, especially where contamination control and consistent output are essential. Advantages Supports high-temperature heat transport in demanding environments Improves manufacturability of complex wick structures Helps increase reliability and consistency in heat pipe production Enables more scalable filling, sealing and inspection of heat pipe arrays Better suited for long-life, high-purity alkali-metal systems Strong fit for compact, passive thermal management applications Market Applications Nuclear Energy (microreactors, reactor heat transport, thermal management systems) Space (space reactors, power conversion, radiator-side heat rejection) Aerospace (high-reliability thermal control, compact heat transport) Defense (remote power systems, mission-critical thermal hardware) Advanced Manufacturing (specialized heat pipe production tools and processes) Industrial Energy Systems (high-temperature heat recovery and thermal transport) In addition to patent licensing, Los Alamos may loan a full-scale prototype, modular alkali metal heat-pipe fill system hardware allowing the fill and seal of individual or large arrays of alkali metal heat pipes. US Patent Nos. 12,007,171-B1 and US 11,633,806-B1 LA-UR-26-24496 TRL 7 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search | - | Special Notice | 12/04/2026 |
A WALK-IN REFRIGERATOR FOR SEEDS AND INSTALLATION (New Mexico State Office) | - | Solicitation | 11/09/2026 |
The U.S. Geological Survey EESC-S.O. Conte Research Laboratory requires the purchase and installation of a new walk-in cooler/freezer unit, along with removal of the existing unit, to be delivered and completed in Turner Falls, MA, within 30 days from the date the contractor receives the purchase order. There are no option periods. Competitive Request for Quotations (RFQ) 140G027Q0009 is a small business set aside under NAICS code 333415 -Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing The size standard is 1,250 employees. Question cutoff: 11/3/2026 - 10:00am Mountain Time The anticipated award date of the contract is 7 days After the solicitation closes. SAM REQUIREMENT- Offeror must be registered in the SAM - SYSTEM FOR AWARD MANAGEMENT database before an award can be made to them. All responsible sources may submit a quotation which shall be considered by the agency. All Questions and Quotations shall be submitted to Mindie Dixon at mindie_dixon@ios.doi.gov | - | Solicitation | 11/05/2026 |
QUARTERLY ELEVATOR MAINTENANCE SERVICES | - | Solicitation | 11/12/2026 |
Additional Details
Solicitation Number
140A2324Q0345
Archive Date
Jul 24, 2024
Office Address
Albuquerque, NM, 87104