Notice ID: ebe3ea380ad2464e99e7ee22e289c47bAward NoticeAwardedArchived
N--IE114 PINE RIDGE PRQ-25-0214 BOILER REPL
Awarded on September 22, 2025. Full description on SAM.gov.
Awarded tounder 140A2325P0452 (source: SAM.gov award notice)• $184.9K
Overview
- Posted
- September 23, 2025
- Notice type
- Award Notice
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of the InteriorBUREAU OF INDIAN AFFAIRS
Notice details
- Office
- INDIAN EDUCATION ACQUISITION OFFICE
- Last updated
- Nov 7, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 22, 2025
- Award amount (SAM.gov award notice)
- $184.9K
Identifiers
- Solicitation number
- 140A2325P0452
- Notice ID
- ebe3ea380ad2464e99e7ee22e289c47b
- Award number (PIID)
- 140A2325P0452
Description
IE114 PINE RIDGE PRQ-25-0214 BOILER REPL
Award Overview
Award Number
140A2325P0452
Award Amount (SAM.gov award notice)
$184.9K
Award Date
Sep 22, 2025
Awardee
Awardee UEI
FQAMNX1UNEH3
Awardee CAGE Code
7GCG2
Awardee Address
2012 GREAT NORTHERN DR N, FARGO, ND 58102, UNITED STATES
Original Solicitation
Notice ID: ebe3ea380ad2464e99e7ee22e289c47b
Posted Date: Sep 23, 2025
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Award NoticeArchivedCurrent
N--IE114 PINE RIDGE PRQ-25-0214 BOILER REPL
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate: | 52% | Combined Synopsis | 10/26/2026 |
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Revolutionary FAR Overhaul (RFO) (FAR) subpart 12.2, Solicitation, Evaluation, and Award as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation JAN 2026 (eff. 01/22/2026) VAAR DEVIATION FEB 2026 (eff. 03/17/2026) VAAM Alert 26-02 (eff. 10/28/2025) Acquisition Policy Flash 26-26 eff. 03/17/2026) 4. This solicitation is for Roll Up Door Replacement and the solicitation number is 36C25627Q0092. This solicitation is a 100% SDVOSB set-aside, and the Government anticipates awarding a firm-fixed price contract from this solicitation. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22M. The FSC/PSC is N099 Installation Of Equipment- Misc. The Central Arkansas Veterans Healthcare System is seeking to purchase the service for isolation Valves installed for steam and condensate lines IAW with attached statement of work. All interested companies shall provide quotations for the following: Supplies/Services: See Section B.2, Cost/Price Schedule Place of Performance/Place of Delivery Address: Eugene J. Towbin Healthcare Center Central Arkansas Veterans Healthcare System 2200 Fort Roots Drive North Little Rock, AR 72114 Site visit is scheduled for November 06, 2026, time 10am . Location of site visit is stated in attached SOW. POC is Justin Harper, Justin.Harper2@va.gov All questions are due by November 10, 2026 3PM CST. All quoters shall submit the following: Quotes should be emailed to joseph.warren@va.gov and received no later than 3:00 PM CST, November 18, 2026. Email subject line shall include, RFQ 36C25627Q0092 Roll Up Door Replacement . Quotes shall be submitted IAW Provision 52.212-1 Instruction to Offerors. Point of Contact Joseph Warren Contracting Officer joseph.warren@va.gov | 46% | Combined Synopsis | 11/20/2026 |
EMERGENCY HVAC REPAIR FOR JES | 46% | Awarded | Open |
As of 18 August 2026: Amendment 0001 posted to respond to contractor RFis. The New York District Army Corps of Engineers intends to award a contract for a Request for Proposal for the Design and Installation of 3M Fall Protection Systems Davit Arm and Detent Anchors at AFO. The Project has four main requirements:(a) Engineering Assessment and Design The contractor will be required to evaluate the required installation sites for fall protection equipment and develop a Design Document to appropriately install the equipment.(b) Install Government Furnished Equipment (GFE) The Government will provide the fall protection equipment to be installed. The contractor will provide 3M certified installers and install the equipment per the design.(c) Testing and Inspection The contractor will test and inspect all installed equipment to ensure it will function as intended.(d) End User Training The contractor will provide a training session for AFO employees that will use and maintain the equipment. Offerors should be regularly engaged in the business of installing fall protection systems and be able to provide 3M Certified Installers. | 46% | Solicitation | 08/31/2026 |
The Naval Air Warfare Center Weapons Division at China Lake, CA intends to procure on an other than full and open competitive basis this requirement for Intrusion Detection System (IDS) and Automated Entry Control Systems (AECS) installation (Qty 1 Job) This is Manufacturer sole source to Hirsch with competition amongst authorized distributors. Complete details can be found in the specifications located in Section J attachment of the solicitation. All sources must submit proof of partnership with Hirsch. All responsible sources may submit a quote, which shall be considered by the agency. Please respond to Yvonne Stockwell by email to yvonne.c.stockwell.civ@us.navy.mil. The solicitation will be posted on the Beta SAM website at http://www.beta.sam.gov/ on or about 1/26/2026. All responsible sources must be registered in the System for Award Management (SAM) database at the following website: https://www.sam.gov/portal/public/SAM/. Going forward, all new entities registering in GSA's System for Award Management (SAM), as well as existing registrations being updated or renewed, will require the submission of an original, signed notarized letter identifying the authorized Entity Administrator for the entity associated with the Data Universal Numbering System (DUNS) number. Effective June 11, 2018, entities who create or update their registration in SAM.gov to apply only for federal assistance opportunities such as grants, loans, and other financial assistance programs, have a notarized letter on file within 30 days of registration. Additionally, Effective June 29, 2018, all non-Federal entities who create or update their registration in SAM.gov, have a notarized letter on file within 30 days of registration. It is recommended that all interested parties be aware that processing this additional information may take several days and are proactive in maintaining the SAM registrations in an "Active" status as the government cannot award to an entity without an "Active" SAM registration. More information can be found at www.gsa.gov/samupdate. | 46% | Combined Synopsis | 02/06/2026 |
Additional Details
Solicitation Number
140A2325P0452
Archive Date
Jan 30, 2026
Office Address
Albuquerque, NM, 87104