Notice ID: ebecb97b06fb42a7bed381d05a9cd2b6Award NoticeAwarded
Z--WACCAMAW NWR VISITOR CENTER REPAIRS
Awarded on September 17, 2020. Full description on SAM.gov.
Awarded tounder 140F0420P0295 (source: SAM.gov award notice)• $107.3K
Overview
- Posted
- September 18, 2020
- Notice type
- Award Notice
- NAICS
- 236210: Industrial Building Construction
- Agency
- Department of the InteriorUS FISH AND WILDLIFE SERVICE
Notice details
- Office
- FWS SOUTHEAST REGIONAL OFFICE
- Place of performance
- 21424 N. Fraser St, Georgetown, SC, 29440
- Last updated
- Apr 29, 2026
- Award date
- Sep 17, 2020
- Award amount (SAM.gov award notice)
- $107.3K
Identifiers
- Solicitation number
- 140F0420Q0117
- Notice ID
- ebecb97b06fb42a7bed381d05a9cd2b6
- Award number (PIID)
- 140F0420P0295
Description
WACCAMAW NWR VISITOR CENTER REPAIRS
Award Overview
Award Number
140F0420P0295
Award Amount (SAM.gov award notice)
$107.3K
Award Date
Sep 17, 2020
Awardee
Awardee UEI
E244PQT5JLV3
Original Solicitation
Notice ID: ebecb97b06fb42a7bed381d05a9cd2b6
Posted Date: Sep 18, 2020
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140F0420Q0117- Solicitation
- Awarded
This opportunity has been awarded.
- 3×SolicitationJul 2, 2020
Z--WACCAMAW NWR VISITOR CENTER REPAIRS
- AwardedCurrentSep 18, 2020
Z--WACCAMAW NWR VISITOR CENTER REPAIRS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent’s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team’s understanding of the Robins Air Force Base operational environment The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team’s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project. | - | Special Notice | 11/20/2026 |
SUBJECT: — Robins Agile Practices for Infrastructure Development (RAPID) Umbrella Program Notice (10 U.S.C. § 2808a Other Transaction Authority) 1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 78th Civil Engineer Group (78 CEG) at Robins Air Force Base (AFB), Georgia, is publishing this Umbrella Program Notice to announce the establishment of the Robins Agile Practices for Infrastructure Development (RAPID) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, RAPID seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the RAPID Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. Program ParameterDetailsStatutory Authority10 U.S.C. § 2808a (Standalone Facility Construction or Repair Authority)Umbrella Active Period12 Months (Continuous Open Notice)Execution VehicleProject-Specific Areas of Interest (AOIs) & Other Transaction Agreements (OTAs)Key FlexibilitiesNo FAR boilerplate clauses, standard commercial accounting (No CAS), negotiable termsFollow-on AuthorityEligible for non-competitive, sole-source follow-on production construction under § 2808a(c) 3. ELIGIBILITY & PARTICIPATION The RAPID framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming RAPID projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects. | - | Market Research | 12/01/2027 |
SUBJECT: — Robins Agile Practices for Infrastructure Development (RAPID) Umbrella Program Notice (10 U.S.C. § 2808a Other Transaction Authority) 1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 78th Civil Engineer Group (78 CEG) at Robins Air Force Base (AFB), Georgia, is publishing this Umbrella Program Notice to announce the establishment of the Robins Agile Practices for Infrastructure Development (RAPID) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, RAPID seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the RAPID Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. Program ParameterDetailsStatutory Authority10 U.S.C. § 2808a (Standalone Facility Construction or Repair Authority)Umbrella Active Period12 Months (Continuous Open Notice)Execution VehicleProject-Specific Areas of Interest (AOIs) & Other Transaction Agreements (OTAs)Key FlexibilitiesNo FAR boilerplate clauses, standard commercial accounting (No CAS), negotiable termsFollow-on AuthorityEligible for non-competitive, sole-source follow-on production construction under § 2808a(c) 3. ELIGIBILITY & PARTICIPATION The RAPID framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming RAPID projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects. | - | Special Notice | 09/16/2027 |
Special Notice April 3, 2025 Announcements Formerly identified as W5168W25BA001 Fort Moore Is now identified by W5168W25RA013, Fort Benning Job Order Contract (JOC) For further updates on this potential/anticipated solicitation, refer to the New Identification Number: W5168W25RA013 New Name: Fort Benning Job Order Contract (JOC) Locations: The U.S. ARMY GARRISON FORT BENNING, ALABAMA/GEORGIA, CAMP MERRILL NEAR DAHLONEGA, GEORGIA, AND OTHER SATELLITE LOCATIONS. End………………………………………………………………………………………………… 10 MAR 2025 Notice/Update The estimated date of the anticipated solicitation is May 23, 2025. _____________________________________________________________________________________________________ Special Notice 13 FEB 2025 For previously posted data on ID W5168W24R0024, please navigate to that announcement. The NEW identification number for the Fort Moore Job Order Contract is W5168W25BA001; please use this identifer when seeking information from 13 FEB 2025 forward. END........................................................................................................................................................................................................ | - | Special Notice | Open |
THIS SOLICITATION IS SET ASIDE FOR INDIAN SMALL BUSINESS ECONOMIC ENTERPRISES This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. This announcement constitutes the only solicitation; a written solicitation will not be issued. Solicitation No. 140A2327Q0297 herein cited will be procured under FAR Part 12, Acquisition of Commercial Items. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) FAC 2026-01 March 13, 2026, Civilian Agency Acquisition Council (CAAC) Letter 2025-02 issued February 18, 2025, and Department of the Interior Acquisition, Arts, and Asset Policy (DOI-AAAP) 0210 v01. This acquisition is set aside for Indian Small Business Economic Enterprises. The NAICS Code is 236210, Industrial Building Construction Standard size $45.0. The estimated value for this construction project ranges from $100,000 to $250,000. Bids exceeding $35,000 will necessitate the provision of a bond. DESCRIPTION: The contractor shall provide all labor, materials, equipment, supervision, transportation and incidentals necessary to Installation a Greenhouse at Wingate High School in Fort Wingate, NM. All interest offerors shall include all-inclusive costs for the requirement; including but not limited to all applicable taxes and FOB shipping cost. Delivery to: WINGATE HIGH SCHOOL Physical Address: 1737 Shush Drive, Fort Wingate, NM 87316 Item Description: Government is purchasing all items listed below. 1. INSTALLATION SERVICES= $ _____________ 2. MATERIALS AND SUPPLIES = $ ______________ 3. NAVAJO NATION TAXES = $_________________ All shipping and delivery charges: $ ___________________ (Includes unloading) All Applicable State Taxes $ ________________ TOTAL $ _________________ Award will be made to the lowest priced offeror, who's quote conforming to the requirements herein, will be most advantageous to the Government, and is fair and reasonable. This will be a Fixed Price Contract. CONTRACT CLAUSES: The following clauses apply to this acquisition: FAR 52.212-1, Instructions to Offerors¿Commercial Products and Commercial Services; 52.212-2, Evaluation ¿ Commercial Products and Commercial Services; 52.212-3, Offeror Representations and Certifications Commercial Items; FAR 52.212-4, Contract Terms and Conditions Commercial Items; 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals¿Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications¿Commercial Products and Commercial Services; 52.203-17, Contractor Employee Whistleblower Rights; 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statement-Representation; 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements; 52.204-7, System for Award Management ¿ Registration; 52.204.13, System for Award Management ¿ Maintenance; 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation; 52.209-5, Certification Regarding Responsibility Matters; 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded; 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations; 52.209-11, Representation by Corporation Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law; 52.219-6, Notice of Total Small Business Set-Aside; 52.222-5, Construction Wage Rate Requirements-Secondary Site of the Work; 52.222-6, Construction Wage Rate Requirements; 52.222-7, Withholding of Funds; 52.222-8, Payrolls and Basic Records; 52.222-9, Apprentices and Trainees; 52.222-10, Compliance with Copeland Act Requirements; 52.222-11, Subcontracts (Labor Standards); 52.222-12, Contract Termination¿Debarment; 52.222-13, Compliance with Construction Wage Rate Requirements and Related Regulations; 52.222-14, Disputes Concerning Labor Standards; 52.222-15, Certification of Eligibility; 52.222-35, Equal Opportunity for Veterans; 52.222-36, Equal Opportunity for Workers with Disabilities; 52.222-37, Employment Reports on Veterans; 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026; 52.222-90, Addressing DEI Discrimination by Federal Contractors; 52.225-9, Buy American-Construction Materials; 52.228-13, Alternative Payment Protection; 52.228-1, Bid Guarantee; 52.232-18, Subject to the Availability of Funding; 52.228-15, Performance and Payment Bonds ¿ Construction; 52.232-33, Payment by Electronic Funds Transfer-System for Award Management; 52.232-40, Providing Accelerated Payments to Small Business Subcontractors; 52.233-3, Protest After Award; 52.233-4, Applicable Law for Breach of Contract Claim; 52.236-2, Differing Site Conditions; 52.236-3, Site Investigations and Conditions Affecting the Work; 52.236-5, Material and Workmanship; 52.236-6, Superintendence by the Contractor; 52.236-7, Permits and Responsibilities; 52.236-8, Other Contracts; 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements; 52.236-10, Operations and Storage Areas; 52.236-12, Cleaning Up; 52.240-90, Security Prohibitions and Exclusions Representations and Certifications; 52.240-91, Security Prohibitions and Exclusions; 52.244-6, Subcontracts for Commercial Products and Commercial Services; 52.246-12, Inspection of Construction; 52.252-6, Authorized Deviation in Clauses; and DIAR clauses are herein incorporated as follows: DIAR 1452.233-2 Service of Protest Department of the Interior; DIAR 1452.280-1 Notice of Indian Small Business Economic Enterprise Set-aside; DIAR, 1452.280-3 Indian Economic Enterprise Subcontracting Limitations; DIAR, 1452.280-4 Indian Economic Enterprise Representation; and DIAR, 1480.503 Commercial item or simplified acquisitions. Award will be made at a fair and reasonable price to the lowest responsive and responsible offeror whose quote conforming to the requirements herein will be the most advantageous to the Government. Provide UEI# with a signed and dated quote, along with a completed copy of FAR Clause 52.212-3, Offeror Representations and Certifications - Commercial Items and DIAR 1452.280-4, Indian Economic Enterprise Representation to be considered for award. The RFQ is due at the Bureau of Indian Education, Division of Acquisition, Attention: Mary Jane Johnson, email to: maryjane.johnson@bie.edu by, November 19, 2026, 12:00 PM (Mountain Daylight Time.) Any further questions regarding this announcement may be directed to Mary Jane Johnson, Contracting Officer at maryjane.johnson@bie.edu, no later then 10 days BEFORE closing. All contractors submitting quotes must be registered in the SAM.gov, in order to receive contracts and purchase orders from the Federal Government pursuant to FAR Clause 52.204-7. To register or learn more about the SAM, go to: http://www.SAM.gov. | - | Solicitation | 11/19/2026 |
Additional Details
Solicitation Number
140F0420Q0117
Archive Date
Oct 2, 2020
Office Address
ATLANTA, GA, 30345