Notice ID: 0867ca7bd3264d599c1211e9cf130ea4Solicitation
Y--CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH
Archived on July 31, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 PM UTC−06:00
- Posted
- July 14, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of the InteriorUS FISH AND WILDLIFE SERVICE
Notice details
- Office
- FWS MOUNTAIN-PRAIRIE REGIONAL OFFIC
- Place of performance
- 423 HATCHERY CIRCLE, Spearfish, SD, 57783-2643
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 140F0621R0021
- Notice ID
- 0867ca7bd3264d599c1211e9cf130ea4
Description
CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH Construct new shop and storage building shall be a single story, pre-engineered metal building containing a wood shop area, restroom, paint storage area, a general storage bay and a large vehicle bay for storage and maintenance of the fish truck. All bays shall have overhead sectional doors to the exterior as well as personnel doors. The shop building shall harmonize with the exterior materials and color scheme of the other structures on the site. This shop building is to be located at the south end of the facility site plan behind the historic Booth House and wedding courtyard. Given the historic nature of the site and the placement of the building, it will be important to blend the new building into the exiting fabric of the site. Our POC for the project is the Contracting Officer, Mr. Tim Officer 303-236-4320 or via email tim_officer@fws.gov Amendment 0003
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140F0621R0021- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeMar 17, 2021
Y--CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH
- 4×SolicitationCurrentJun 14, 2021
Y--CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT This is a solicitation announcement for warehouse improvements at the Bureau of Land Management UFO MPLC WAREHOUSE IMPROVEMENT, Montrose, CO. 1.1 PROJECT DESCRIPTION Montrose Public Lands Center. The work includes, but is not limited to; - Asbestos abatement, - Remodel bathrooms, - Replace flooring, - Replace rooftop heating and cooling unit (RTU), - Replace manual overhead door with electric overhead door, - Add luminaires and replace existing luminaires, - Add and relocate electrical outlets, - Service and maintain metal roof, - Repair and maintain existing overhead doors and, - Photovoltaic inverter replacement. 1.2 LOCATION Montrose Public Lands Center 2465 South Townsend Ave Montrose, CO 81401 1.3 WORK SCHEDULE Work shall occur Monday - Friday. Work shall not occur on Federal Holidays, the day after Thanksgiving and December 26-31. Work shall be completed within 180 days of the Notice to Proceed. Period of Performance: Work shall be completed within 180 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 236220 - Commercial and Institutional Building Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Best Value see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov | 63% | Solicitation | 10/30/2026 |
SOLICITATION NOTICE - DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona. The U.S. Army Corps of Engineers (USACE), Los Angeles District, has a requirement for the Design-Build to Budget (DB2B) of the Airborne Equipment Parachute Repair Facility at Yuma Proving Ground, Arizona.This acquisition is a 100 percent Total Small Business Set-Aside conducted in accordance with RFO FAR Part 19 and RFO FAR 36.101-2. The Government is utilizing a Two-Phase Design-Build strategy under a single solicitation. Phase 1 involves a qualification pre-selection process to shortlist up to three (3) of the most highly qualified offerors. Only those selected will be invited to Phase 2 via solicitation amendment. Award will be a competitive Firm-Fixed-Price contract made to the Highest Technically Rated Offeror within the fixed budget ceiling.NAICS: 236220 (Commercial and Institutional Building Construction), size standard $45,000,000.00. PSC: Y1EZ - Construction Of Other Industrial Buildings. Period of Performance: 760 calendar days from receipt of Notice to Proceed.SUBMISSION AND REGISTRATION REQUIREMENTS:Submission Portal: All proposals for solicitation W912PL26RA046 must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. In order to submit a proposal, contractors must first be registered with the Proposal Manager role in PIEE. Hard copy, email, or facsimile submissions will NOT be accepted.System for Award Management (SAM): All offerors, including any Joint Venture (JV) entities, must have an active and valid registration in the SAM database at the time of proposal submission to be eligible for award. Proposals from contractors without an active SAM registration will not be considered. Registration is free of charge.Amendments: All solicitation documents, amendments, and communications will be posted to both the SAM database and the PIEE Solicitation Portal. It is the responsibility of the offeror to monitor these websites for updates. The Government is not responsible for any inability to access the websites.All Offers and Bidders are also advised that this procurement may be delayed, canceled, or revised at any time during the solicitation, evaluation, and final award process. | 59% | Solicitation | 10/29/2026 |
Pre-Solication notice change 0001: The purpose of this change is to notify prospective offerors of a revision to the anticipated project scope of work: The anticipated facility size is revised from approximately 13,000SF down to approximately 10,315 SF. PRESOLICITATION NOTICE (SYNOPSIS): DESIGN-BUILD TO BUDGET (DB2B) Airborne Equipment Parachute Repair Shop, Yuma Proving Ground, Yuma, Arizona The U.S. Army Corps of Engineers (USACE), Los Angeles District, intends to issue a Request for Proposal (RFP) for the design and construction of the Airborne Equipment Parachute Repair Shop (Airdrop Rigging Facility) located at Yuma Proving Ground (YPG) in Yuma, Arizona. This procurement is a 100% Total Small Business Set-Aside. Proposed Solicitation Number: W912PL26RA046 Product Service Code (PSC): Y1EZ – Construction of Other Industrial Buildings NAICS Code: 236220 – Commercial and Institutional Building Construction Small Business Size Standard: $45.0 Million Set-Aside Status: 100% Total Small Business Set-Aside Contract Type: Firm-Fixed-Price (FFP) Procurement Method: Two-Phase Design-Build Selection Procedures (in accordance with RFO FAR Subpart 36) Acquisition Strategy: Design-Build to Budget (DB2B) Best Value Tradeoff Process SCOPE OF WORK: The anticipated scope of work is for a complete design-build solution for a new, approximately 10,315 square foot climate-controlled Airdrop Rigging Facility. The facility must constructed in close proximity to the existing airdrop rigging, parachute repair facilities and aircraft loading site, to allow for environmentally controlled storage and inspection of rigged materials prior to airdrop. The scope of work includes, but is not limited to: Complete Design & Compliance: Develop a complete design that complies with DoD antiterrorism/force protection requirements (UFC 4-010-01) and ensures a minimum facility life of 40 years in accordance with DoD's Unified Facilities Criteria (including energy efficiencies, building envelope, and integrated building systems performance). Site Work & Utilities: Perform all site work to prepare the building site and account for storm drainage, including moderate site grading, demolition and relocation of an existing fire access lane, connection to nearby utilities, and the construction of a new septic system for sanitary sewer. This section also incorporates the full design, procurement, structural/electrical provisions, and installation of a overhead 50-ton crane. Facility Features: Construct the facility to include a partially raised loading dock, motorized roll-up doors, and specialized storage rooms with adequate spacing for tools, materials, and the joint inspection of materials within the building envelope. Aircraft Cargo Conveyance: Integrate a military aircraft cargo conveyance roller system (compatible with C-130 and C-17 cargo configurations) installed inside multiple high-bay rigging lanes, with the final quantity, layout, and configuration of lanes optimized by the Contractor to maximize throughput and rigging capacity within the fixed budget ceiling. Climate Control HVAC: Install all necessary facility climate-control systems, including self-contained cooling and heating HVAC systems (estimated at 170 tons of capacity) to maintain strict temperature and humidity parameters. Communications & Security: Provide complete communications infrastructure, conduits with pull strings placed under new roadways for future communication installations, and a closed-circuit television (CCTV) system. Commissioning & TAB: Provide full system testing, adjusting, and balancing (TAB) and total building commissioning. Warranty & Maintenance: Deliver a comprehensive warranty and a plan for long-term maintenance support. ACQUISITION STRATEGY This project is being executed as a Design-Build to Budget (DB2B) Two-Phase procurement utilizing the Best Value Tradeoff source selection process under RFO FAR Subpart 36.3 Two-Phase Design-Build Selection Procedures Budget Ceiling: The contract budget ceiling is $8,200,000.00. Offerors compete on value (quality, technical functionality, and durability via proposed "Betterments ") for that set price. Any proposal that exceeds the $8,200,000.00 price cap will be rated Unacceptable and will be ineligible for award or stipend. Selection Process: This will be a negotiated procurement using the Best Value Trade-Off source selection process. Phase I involves a pre-selection process in which the Government will shortlist up to 3 of the most highly qualified offerors. Only those selected during Phase I will be invited to participate in Phase II, which will be initiated through an amendment to the original solicitation. Both Phase I and Phase II will be evaluated in accordance with the evaluation criteria set forth in the solicitation. REGULATORY COMPLIANCE & LIMITATIONS ON SUBCONTRACTING Construction Magnitude: In accordance with RFO FAR 36.204, the estimated magnitude of construction for this project is Between $5,000,000.00 and $10,000,000.00. Limitations on Subcontracting: In accordance with RFO FAR 52.219-14 (Limitations on Subcontracting), the prime contractor must perform at least 15% of the cost of the contract, excluding the cost of materials, with its own employees for this general construction procurement. SAM.GOV and PIEE REGISTRATION Offerors must have and maintain active registrations in the following systems to be eligible for award: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov/ to be eligible for a Government contract award. Joint Ventures (JV): If the Offeror is a Joint Venture, the JV entity shall have a valid SAM registration in the SAM database representing the JV as one distinct business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. PIEE Portal: All proposal volumes must be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil/. It is the responsibility of the Offeror to register and confirm receipt of proposals in PIEE-SOL. SOLICITATION WEBSITE & DISTRIBUTION The official solicitation, when posted on or about 25 September 2026, will be available free of charge by electronic posting only and may be found at the Contracting Opportunities website on http://www.sam.gov/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed using Adobe Acrobat Reader. Amendments, if/when issued, will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offeror's responsibility to check the website periodically for any amendments to the solicitation. | 59% | Pre-Solicitation | 09/11/2026 |
The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the Chesapeake and Delaware (C and D) Canal Building Replacement Project. The Chesapeake and Delaware or Canal connects the Delaware River to the Chesapeake Bay and Port of Baltimore. The canal is maintained from a field office located in Chesapeake City Maryland. This office consists of multiple buildings and shops that are essential to the continued operation of the canal. Several of these building have reached the end of their lifecycle and need to be replaced. This project will include the demolition and consolidation of the mechanics shop, bridge shop and storage buildings. A new building will be constructed to sever as a replacement of the buildings that are being removed. The building will be located along the east side of the project site. The building dimensions will be 60 feet x 150 feet with a clear ceiling height of 20 feet. The building will have a gable roof with the ridge running parallel to the length of the building. A pre- engineered metal building with tapered columns will be used. The columns will be enclosed with steel stud framing and gypsum board in the office areas. Vehicle and workshop areas will have propane fired heating. Office areas will be provided with air conditioning. The electrical service will be upgraded if necessary to provide power to the new building. The building will be connected into backup power from the existing diesel generator. Work will consist of the following activities: A.) The project scope includes all work required to design and construct a 9,000 square foot maintenance building in accordance with the Request for Proposal documents including the demolition of the four existing buildings and propane storage tank currently located at the site. Utilities serving each of the buildings being demolished must be demolished to the extents defined in section 02 41 00 Demolition. Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the Offeror is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods must reflect this by choosing the most economical type of construction allowed by code for this occupancy/project. B.) The maintenance building must be provided with Heating, Ventilation, and Air Conditioning (HVAC), electrical, communications, fire protection, life safety, plumbing systems, waste oil storage, and compressed air systems. C.) A 3,000 square foot storage shed must be designed and constructed at the location identified on the site plan. The shed design must include power and lighting. D.) The scope of work also includes civil site work consisting of site paving, installation of stormwater drainage, connection into the domestic water utility, sanitary sewer utility connection for the new maintenance building, connection of existing sanitary sewer lines into the towns sanitary sewer utility, a vehicle wash area and fire hydrants. Site work is shown in Appendix A. Site electrical work must be completed to provide the maintenance building and storage shed with power fed from the existing switch gear shed. Site telecommunications work must be completed to provide the maintenance building with connection into the existing telecommunications utilities. E.) A propane storage tank must be provided onsite and be connected to the new maintenance building and the existing propane fired generator. The estimated period of performance will be 730 calendar days. The estimated magnitude of this project is between $5,000,000 and $15,000,000. The North American Industrial Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction, with an SBA Size standard of $45.0M. | 59% | Pre-Solicitation | 11/25/2026 |
59% | Awarded | Open |
Additional Details
Solicitation Number
140F0621R0021
Archive Date
Jul 31, 2021
Office Address