Archived
VY-MISSISQUOI NWR-PARKING LOT MAINT
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- June 10, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of the InteriorUS FISH AND WILDLIFE SERVICE
Notice details
- Office
- FWS, CONSTRUCTION A/E TEAM 2
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 140FC226Q0036
- Notice ID
- ada0aef79690493fa360f1b81cfb6726
Description
VY-MISSISQUOI NWR-PARKING LOT MAINT
The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility.
The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied.
The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished:
1. Clean and prepare the entire asphalt surface to be seal coated.
2. Crack fill any cracks as needed with hot rubberized crack filler.
3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface.
4. Re-stripe all paring areas to match existing layout.
5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility
And other requirements as defined by the attached Scope of Work.
Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781
Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility.
The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied.
The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished:
1. Clean and prepare the entire asphalt surface to be seal coated.
2. Crack fill any cracks as needed with hot rubberized crack filler.
3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface.
4. Re-stripe all paring areas to match existing layout.
5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility
And other requirements as defined by the attached Scope of Work.
Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781
Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Koski, William
Documents
Files (4)
- Download
Sol_140FC226Q0036.pdf
282 KBAdded in Solicitation version 3Posted - Download
SOW_Wage_Rate_Clauses_20260910.pdf
5.0 MBAdded in Solicitation version 3Posted - Download
A06_Overhead_View_parkinglot_project_2026.pdf
604 KBAdded in Solicitation version 3Posted - Download
Section_B.pdf
569 KBAdded in Solicitation version 3Posted
Lifecycle
- 3Version 3SolicitationArchivedCurrent
VY-MISSISQUOI NWR-PARKING LOT MAINT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
140FC226Q0036
Archive Date
Jul 18, 2026
Office Address
Falls Church, VA, 22041