GovChime
Notice ID: 45d7be86a8a0485481f486303efefe6bSpecial Notice

B--Analyze and prepare rock samples-ID-TIMS and LA-ICP-MS U-Pb age determinations,

Archived. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
March 2, 2023
Notice type
Special Notice
NAICS
541380: Testing Laboratories and Services
Agency
Department of the InteriorUS GEOLOGICAL SURVEY

Notice details

Office
OFFICE OF ACQUISITON GRANTS
Last updated
Sep 9, 2025

Identifiers

Solicitation number
140G0323Q0040
Notice ID
45d7be86a8a0485481f486303efefe6b

Description

This is a notice of intent to solicit from a single source. The U.S. Geological Survey (USGS) intends to negotiate a purchase order with Boise State University Isotope Geology Laboratory (BSUIGL),to acquire ID-TIMS and LA-ICP-MS U-Pb age determinations, plus trace element chemistry, on detrital zircon grains from 5 mineral separates of rock samples. Award will be made in accordance with Federal Acquisition Regulation (FAR) 13.106-1(b) and the procedures at FAR Part 12 entitled, Acquisition of Commercial Items and FAR Part 13 entitled, Simplified Acquisition Procedures. BOISE STATE UNIVERSITY is, to the USGS knowledge, the only source who possess the capability to achieve the required result of obtaining both types of U- Pb ages to distinguish multiple geologic events detrital and metamorphic from zircons in a single sample. The purpose of this notice is to satisfy the requirements of FAR Subpart 5.2. This notice of intent is not a request for competitive quotes. However, all responsible parties may submit a quotation by the closing date of this announcement which shall be considered by the agency. No solicitation will be issued. A determination not to compete this action based upon responses received is in the sole discretion of the Government. The NAICS code for this action is 541380- Testing Laboratories and Services Responses or inquiries shall only be accepted through electronic mail addressed to vnuno@usgs.gov and must be uploaded and received in their entirety no later than March 06, 2023 at 1200 ET. Responses submitted by hardcopy shall not be accepted or considered.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140G0323Q0040
  1. Pre-Solicitation
  1. 3×
    Pre-SolicitationJan 5, 2023

    B--Analyze and prepare rock samples-ID-TIMS and LA-ICP-MS U-Pb age determinations,

    Notice 59d118692995402f8755691da923c58d on SAM.gov

  2. Special NoticeCurrentMar 2, 2023

    B--Analyze and prepare rock samples-ID-TIMS and LA-ICP-MS U-Pb age determinations,

    Notice 45d7be86a8a0485481f486303efefe6b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
X:NOGRN, SERVICE, WELL WATER QUALITY SAMPLING AND MONITORING SERVICES for SANTA MONICA MOUNTAINS NRA (SAMO).
-Combined Synopsis07/17/2026
The U.S. Geological Survey (USGS) Geology, Energy, and Minerals Science Center (GEMSC) required services for paired bulk mineralogy and detailed clay analysis by way of X-ray diffraction analysis. The proposed work will allow the relationship between clay mineral species and porosity to be fully assessed. The USGS is aware of no other source that can provide the above. Therefore, it intends to make an award to QMinerals unless it is contacted by any vendor who believes they have similar technical expertise and can provide the same service(s). Vendors are invited to contact the Contract Specialist, Miranda Blankenship, via email at Miranda_blankenship@ios.doi.gov no later than 1:00 PM EST, Tuesday, November 10, 2026, with an affirmative answer.
-Special Notice11/10/2026
36C26227Q0022 ******* The purpose of this amendment is to: 1. Respond to questions asked regarding this solicitation. 2. Change the Period of Performance (POP) start date from 11/20/2026 to 12/01/2026. Base: 12/01/2026 09/30/2027 OY 1: 10/01/2027 09/30/2028 OY 2: 10/01/2028 09/30/2029 OY 3: 10/01/2029 09/30/2030 OY 4: 10/01/2030 09/30/2031 3. Change the response due date from 11/09/2026 to 11/12/2026. Questions and Answers: Q. Can you please let me know the total number of outlets to be tested. A. 3,000 Total. Q. # vacuum inlets A. 3,000 Q. # of medical gas system source equipment & location Bulk Oxygen, Med air, Vacuum, Nitrogen, WAGD, Dental Air, Dental Vacuum, Carbon Dioxide. Locations Main Hospital and Building 32 (cancer center) Q. # of medical gas booms/columns A. 38, Please see attachment named BOOM INVENTORY . Q. Could you please clarify whether the prime contractor must independently hold the ASSE 6020 Medical Gas Inspector and ASSE 6030 Medical Gas Verifier certifications, or whether these requirements can be satisfied through a qualified subcontractor whose personnel possess the required certifications? A. ASSE 6020 and ASSE 6030 certifications are required. Q. What are the manufacturer, model, and serial number of the boom equipment, source equipment, vacuum and air system? At a minimum, we need a manufacturer, model #, serial number for each system and each motor/compressor. Would providing photos of the source equipment be possible? A. We do not have the serial numbers or photos of the boom equipment but please see Exell spreadsheet attached Boom Inventory which has the Make, Model and location. Q. The Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No, we cannot provide the inspection report but we are providing the boom inventory. Please see Exell spreadsheet attached Boom Inventory . Q. Can the Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No Q. If this is a follow-on requirement, what is the prior contract number? A. Prior Contract No. : 36C26222C0020 Q. Which gases and systems are in scope (oxygen, medical air, vacuum, nitrous oxide, nitrogen, carbon dioxide, WAGD, instrument air)? A. Please refer to statement of work section V. Scope Q. Is the bulk oxygen tank owned and maintained by the gas supplier, with the contractor s scope limited to the pipeline side? A. The bulk oxygen is owned and maintained by the supplier. Q. Are Category 3 systems, such as dental air and vacuum, in scope? A. Yes Q. Does the Government expect only annual periodic inspection and testing, or a full NFPA 99 system verification each year? A. Only Annual. Q. Does each annual CLIN cover a single inspection event per year? A. Yes Q. May the ASSE 6020 and 6030 credentials be held by subcontractor personnel instead of the prime s employees? A. Certs. Must be held by the prime and subcontractor. Q. Must the field team include both a 6020 inspector and a 6030 verifier, or is credential acceptable for annual testing? A. Yes Q. Should pricing assume evening or weekend work for the ICU, OR, SICU and ED zones? A. Yes. Q. If a master alarm sensor is not on a demand check fitting, will the VA allow a brief isolation to test it, or is that test excluded? A. Yes, a brief moment. Q. Are photos required for every outlet/inlet, or only for sources, alarm panels, zone valves and deficiencies? A. Only deficiencies. Q. How many particulate and dewpoint sample points are expected, based on the number of floors in the Main Hospital and Buildings 30, 31 and 32? A. No. This test will only to be performed for installation, repair, or modification of any medical gas piping systems, Building 29, 30 has no medical gas. Q. When was the last annual inspection done, and when was the first inspection due under this contract? A. The last inspection was completed on 11/24/25 - 2026 inspection needs to be completed before 12/21/26. Q. Oxygen particulate analysis: This filter test is typically performed as a pre-test during construction projects under NFPA 99. The results would generally be expected to remain unchanged unless the pipeline is breached during construction. Please confirm whether this test is required as part of the annual inspection. A. No particulate test performed during verification of newly installed or modified medical gas piping systems only. Q. ASSE 6010 certification: Please confirm whether ASSE 6010 certification is required. Our understanding is that this is a medical gas installer certification, rather than an annual inspection requirement under NFPA 99. A. No, only if repairs need to be performed, contractor shall be 6010 certified to make repairs. Q. Boom testing frequency: Please confirm whether boom testing is required annually. Our understanding is that NFPA 99 recommends testing every 18 months. A. VA requires this test to be performed annually. Q. Boom testing scope: Please confirm whether the testing includes disassembly of the booms to inspect for leaks and dry rot. A. Yes Q. Boom testing report: Please confirm whether the detailed report should include photographs of disassembled booms and a comprehensive list of recommended repairs. A. Yes, if any deficiencies are found. Q. Building confirmation: Mr. Stockman indicated that Eye Clinic Building 32 and Audiology Building 30 should be excluded from the proposal. Please confirm. A. Only main Hospital and building 31 (cancer center) will be tested annually. Q. Could you please clarify what repair work, if any, must be included in the annual fixed price? Specifically, should the contractor include any routine repairs or corrective maintenance, or will all repairs, replacement parts, and installation services be treated as separately authorized work under Section VI? A. This solicitation is only for Inspection, not for repairs. In the Statement of Work (Section VII) we have to include "Over and Above Repair" to clarify that the contractor must notify the POC immediately if any repairs needs to be made.
-Combined Synopsis11/12/2026
Provide the services of an ABS approved ESP Hull Gauging firm to take and record ultrasonic thickness readings on ship's hull, bulkheads, deck plating, scantlings, piping, and in other areas throughout the ship as required by the MSCREP, USCG, and ABS Surveyor. The requirements of the ABS Special Hull Survey No.8 for Single Hull Tankers in the Enhanced Survey Program shall form the basis for this item. See solicitation documents for additional details and submission requirements.
-Combined Synopsis11/18/2026
Cross Connection Hazard Assessment for DLA Distribution San Joaquin, CA
-Combined Synopsis11/23/2026

Additional Details

Solicitation Number

140G0323Q0040

Archive Date

Not specified

Office Address

SACRAMENTO, CA, 95819