GovChime
Notice ID: 204990be11d743059f006a3d903a293aSolicitationArchived

45--CALCIUM THIOSULPHATE INJECTION SYSTEM

Archived on September 1, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM EDT
Posted
August 12, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
333914: Measuring, Dispensing, and Other Pumping Equipment Manufacturing
Agency
Department of the InteriorUS GEOLOGICAL SURVEY

Notice details

Office
OFFICE OF ACQUISITON GRANTS
PSC
4510: PLUMBING FIXTURES AND ACCESSORIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
140G0326Q0190
Notice ID
204990be11d743059f006a3d903a293a

Description

AMENDMENT TWO

The purpose of this Amendment is to answer vendor questions and extend the due dates for quotes:

The due date for quotes is extended to August 17, 2026, at 10:00am EDT.

The Government offers the following supplemental process information in response to a vendor inquiry. No drawings, specifications, or P&IDs beyond the Statement of Need (SON) are available for release. This is a pump skid procurement to replace an existing sulfur dioxide gas dechlorination system. The new skid shall inject liquid calcium thiosulfate (CaTS) into the existing carrier line that discharges the dechlorination stream into the process water culvert/mixing basin; existing SO2 injection hardware is not compatible and shall not be reused. The SON remains the governing document for all requirements.



Q: Do you have drawings, specifications, or a P&ID available?

A: No. No additional drawings or P&IDs will be provided. A site walk is not being offered; the SON is sufficient to scope and quote the requirement. The supplemental process data below is provided to assist with pump sizing and quoting.



Application: Dechlorination of laboratory lake process water prior to discharge.

Chemical: Liquid calcium thiosulfate, 30% w/v (24% w/w), NSF-certified (reference basis: Tessenderlo Kerley CaTS/Captor, specific gravity approximately 1.22¿1.32, approximately 10.4 lb/gal).



Process configuration: Process water (125¿250 GPM, typical approximately 150 GPM) flows from the settling tank into a culvert/mixing basin. Dechlorination is performed on a separate branch (carrier) line that delivers a small slipstream of process water, carrying the metered CaTS, into the same culvert/mixing basin, where blending with the full process stream occurs. CaTS is metered into this carrier line, not into the full-flow process stream.



Chlorine load: Process water is chlorinated with 0.8% sodium hypochlorite to approximately 2.5 ppm free chlorine residual following a 1-hour dwell in the settling tank prior to dechlorination. Representative current reading is approximately 150 GPM at approximately 2.25 ppm free chlorine residual. Offerors should allow for excursions up to approximately 3 ppm at peak flow.

Existing dechlorination duty being replaced: approximately 9 lb/day sulfur dioxide gas.



Estimated CaTS dosing duty (per the manufacturer dechlorination dosage chart, approximately 5.1 gal per million gallons per ppm chlorine at neutral pH, based on the full process flow and chlorine load):

- Typical (150 GPM, 2.25 ppm): approximately 0.10 GPH (approximately 2.5 gal/day)

- Low flow (125 GPM, 2.5 ppm): approximately 0.10 GPH

- Peak (250 GPM, 2.5 ppm): approximately 0.19 GPH

- Peak with excursion (250 GPM, 3.0 ppm): approximately 0.23 GPH (approximately 5.5 gal/day)



The resulting operating band is approximately 0.10¿0.23 GPH, consistent with the high-turndown, low-flow peristaltic metering pump specified in the SON. Estimated values are provided for reference only and do not modify the salient characteristics in Section 4.0.



Chemical storage: Liquid CaTS is supplied and stored in a 275-gallon tote at the storage location; totes are delivered and removed by the chemical supplier as needed. Pump suction shall be configured for tote draw-down.



Utilities and interfaces:

- Power: 115V / 60Hz, single phase, standard NEMA 5-15 receptacle.

- Controls: Facility BMS is Siemens Desigo. Required signals are 4¿20 mA input (dosing speed control) and 4¿20 mA output (flow/status feedback), plus remote start/stop, alarm output, and run/status output.

- Suction: CaTS suction shall be run from the existing 275-gallon tote at the storage location.

- Discharge/injection: The new system shall tie into and inject CaTS into the existing 1/2" Schedule 80 PVC carrier line, which delivers the dechlorination stream into the culvert/mixing basin. The carrier line is a low-flow branch, not the full 125¿250 GPM process stream. Existing SO2 injection hardware is not compatible and shall not be reused; the offeror shall provide a new injection assembly (diffuser/injection quill, fittings, and all materials) suitable for liquid CaTS injection into the 1/2" Schedule 80 PVC carrier line.

All other requirements remain as stated in the Statement of Need.

No further questions will be accepted.
*********************************

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Adam, Elizabeth
Fax: (916) 278-9339

Documents

Files (3)

  • Sol_140G0326Q0190_Amd_0002.pdf

    219 KBAdded in Solicitation version 4Posted
    Download
  • Sol_140G0326Q0190_Amd_0001.pdf

    204 KBAdded in Solicitation version 2Posted
    Download
  • Sol_140G0326Q0190.pdf

    380 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    CALCIUM THIOSULPHATE INJECTION SYSTEM

    Notice ab3e0292f8674fca889c4798089a5012 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    45--CALCIUM THIOSULPHATE INJECTION SYSTEM

    Notice 5846361b1a754bf79d1514b170ebbd13 on SAM.gov

  3. 4
    Version 4SolicitationArchivedCurrent

    45--CALCIUM THIOSULPHATE INJECTION SYSTEM

    Notice 204990be11d743059f006a3d903a293a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

140G0326Q0190

Archive Date

Sep 1, 2026

Office Address

SACRAMENTO, CA, 95819