GovChime
Notice ID: 5ec3f4f360cf46fe8af98618845cfd45Award NoticeAwarded

Z--GAOA SFK DRY BLOOD DAM RECONSTRUCTION

Awarded on September 15, 2022. Full description on SAM.gov.

Awarded tounder 140L0622C0027 (source: SAM.gov award notice)• $1.6M

Overview

Posted
January 18, 2023
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of the Interior

Notice details

Last updated
Sep 9, 2025
Award date
Sep 15, 2022
Award amount (SAM.gov award notice)
$1.6M

Identifiers

Solicitation number
140L0622R0038
Notice ID
5ec3f4f360cf46fe8af98618845cfd45
Award number (PIID)
140L0622C0027

Description

The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair South Fork Dry Blood Dam located in Petroleum County, approximately 14 miles north of Winnet, MT. The requirement entails the following significant tasks: 1. Dewater reservoir and construction area. 2. Excavate a portion of the existing dam embankment and foundation to remove the existing primary spillway. 3. Reconstruct the dam embankment, including: a. Placement of compacted fill from onsite borrow sources, b. Placement of compacted lime amended fill, c. Placement of imported erosion protection within excavated areas of the upstream face, d. Placement of erosion protection matting within excavated areas of the downstream face, e. Placement and compaction of imported sand and gravel for internal filter and drain features. 4. Construct a precast concrete spillway riser for a new principal spillway. 5. Construct concrete encased, precast reinforced concrete pipe outlet conduit. 6. Construct precast concrete low-level inlet structure. 7. Construct a grouted riprap stilling basin. 8. Place road gravel surfacing along the crest of the dam. 9. Construct a temporary construction access road from Valentine Rd. to the dam embankment crest, as necessary. 10. Construct improvements to the auxiliary spillway upstream and downstream of the dam centerline. 11. Remove existing barb wire fencing and cattle guards in the vicinity of the dam. 12. Install a cattle new cattle guard on Valentine Rd. and construct a new barb wire fence. 13. Reclaim all disturbed areas, including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding but does not include seeding.

Full description on SAM.gov

Award Overview

Award Number

140L0622C0027

Award Amount (SAM.gov award notice)

$1.6M

Award Date

Sep 15, 2022

Awardee

Awardee UEI

TSGMTFBUYU19

Original Solicitation

Notice ID: 5ec3f4f360cf46fe8af98618845cfd45

Posted Date: Jan 18, 2023

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 140L0626C0016
    YOUDERIAN CONSTRUCTION INC
    Department of the InteriorNAICS 237990
    $1.7MSigned Sep 10, 2026
  • 140L0626C0007
    YOUDERIAN CONSTRUCTION INC
    Department of the InteriorNAICS 237990
    $1.1MSigned Aug 6, 2026
  • 140L0626C0007
    YOUDERIAN CONSTRUCTION INC
    Department of the InteriorNAICS 237990
    $1.1MSigned Apr 10, 2026
  • 140L0624C0030
    YOUDERIAN CONSTRUCTION INC
    Department of the InteriorNAICS 237990
    $2.5MSigned Sep 8, 2025
  • 140L3624C0002
    YOUDERIAN CONSTRUCTION INC
    Department of the InteriorNAICS 237990
    $1.2MSigned Apr 17, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140L0622R0038
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationMay 27, 2022

    Z--South Fork Dry Blood Dam Reconstruction

    Notice c799cf3134164ff385b39db3c6e5968d on SAM.gov

  2. 2×
    SolicitationJun 26, 2022

    Z--GAOA SFK DRY BLOOD DAM RECONSTRUCTION

    Notice fca7c50069f2416684d5690eb58463b8 on SAM.gov

  3. AwardedCurrentJan 18, 2023

    Z--GAOA SFK DRY BLOOD DAM RECONSTRUCTION

    Notice 5ec3f4f360cf46fe8af98618845cfd45 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PROJECT TITLE: JOHN DAY UNIT 10 PACKING BOX REPLACEMENT PROJECT LOCATION: JOHN DAY DAM, SHERMAN COUNTY, OREGON THIS IS A FULL AND OPEN PROCUREMENT. IN ACCORDANCE WITH RFO 19.110, THIS PROJECT REQUIRES THE HUBZONE 10% PRICE EVALUATION. THE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON. THE ESTIMATED MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000.00 AND $1,000,000.00. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS ACTION IS 237990; OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION WITH A SMALL BUSINESS SIZE STANDARD OF $45M. AS PRESCRIBED IN DFARS 204.7504(A), THIS REQUIREMENT INCLUDES DFARS CLAUSE 252.204-7021 COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) LEVEL REQUIREMENTS. THE CMMC LEVEL REQUIRED BY THIS SOLICITATION IS CMMC LEVEL 1. BID OPENING WILL OCCUR ONE (1) HOUR AFTER BID CLOSING AT 2:00 PM PST DECEMBER 4TH, 2026.
66%
Solicitation12/04/2026
This is a SOURCES SOUGHT SYNOPSIS and is not a solicitation announcement. The purpose of this Market Research and Sources Sought Notice is to gain knowledge of potential qualified Small Business, HUBZone, 8(a), Service Disabled Veteran owned, and Women owned Small Business firms. Responses to this Sources Sought Synopsis will be used by the government in making appropriate acquisition decisions. The intended work falls under NAICS code 237990, Other Heavy and Civil Engineering Construction. The U.S. Army Corps of Engineers, Mobile District, anticipates a requirement for a firm-fixed-price construction contract to perform structural concrete and gate repairs on the spillway at the Carters Reregulation Dam located in Chatsworth, Georgia. The purpose of this project is to perform concrete rehabilitation and retrofit existing structural elements that have been impacted by concrete expansion due to Alkali-Silica Reactivity (ASR). The scope of work includes, but is not limited to: structural concrete demolition of existing pier stoplog slots; installation of new steel stoplog guides and embedded seal plates; placement of specialized shrinkage-compensating concrete; and recessing of side seal plates. Additional mechanical and structural work includes replacing side and bottom seals on four (4) Tainter gates and replacing seals on eight (8) stop logs. The contractor will be fully responsible for the design, fabrication, and installation of Temporary Dewatering Structures (TDS)/cofferdams and temporary gate support shoring. To maintain operational continuity, construction must be executed sequentially, allowing only one gate bay to be dewatered and out of service at any given time. The estimated magnitude of construction is between $5,000,000 and $10,000,000, with an anticipated performance period of approximately 180 calendar days. Responses are requested with the following information, which shall not exceed a total of eight pages. 1. Offeror name, address, points of contact with telephone numbers and e-mail addresses. 2. Business size/classification to include any designations as Small Business, 8(a), HUBZone, Service Disabled Veteran Owned and Women-Owned Small Businesses shall be indicated on first page of submission. 3. Bonding capability: construction bonding level per single contract and aggregate construction bonding level, both expressed in dollars; along with current available bonding capacity. 4. Description of your capability to perform the specialized work described above, manage subcontractors, secure and comply with environmental permits, and safely execute Dam and hydraulic Steel structures (HSS) construction. Specifically address your capacity and proposed approach to designing, fabricating, and installing Temporary Dewatering Structures (TDS) and tainter gate shoring systems. 5. Past performance and experience on up to three (3) projects of similar scope, complexity, and value completed within the past five (5) years, or at least 50% construction complete. Relevant experience includes: structural concrete demolition, specialized concrete placement (such as shrinkage-compensating concrete under strict curing/testing protocols), stainless steel structural embed/guide fabrication and welding, Tainter gate seal replacement, and work with USACE Hydraulic Steel Structures within the civil works branch. For each project, provide the title, location, general description of the scope, contract value, role (Prime or Subcontractor), and client contact information (name, phone, and email). NO RESPONSES WILL BE ACCEPTED BY FAX OR MAIL. ALL RESPONSES MUST BE E-MAILED to: Jeffrey M. Donaldson at Jeffrey.M.Donaldson@usace.army.mil. Submittals are due no later than 20 October 2026 at 2:00 PM CDT. Telephonic responses will not be honored. This is not a Request for Proposal, only a Request for Information. No award will result from this Sources Sought. This notice does not constitute any commitment by the Government.
66%
Market Research10/20/2026
* Bid Abstract uploaded September 21, 2026. * Amendment 0003 - The purpose of this amendment is to make the following changes to the solicitation: SOLICITATION CLOSING DATE The solicitation closing date is hereby extended from Friday, September 18, 2026, at 9:00 PM Pacific Daylight Time (PDT) to Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT). NEW SOLICITATION CLOSING DATE: Monday, September 21, 2026, at 9:00 AM Pacific Daylight Time (PDT) BID OPENING The bid opening will be conducted on Monday, September 21, 2026, at 10:00 AM Pacific Daylight Time (PDT). Bids received prior to the solicitation closing date and time will be secured and opened at the date and time specified above. Will send TEAMs link once BID is received. *Amendment 0002 - The purpose of this amendment is to make the following changes to the solicitation: 1. Extend the Solicitation Closing Date: The solicitation closing date is hereby extended by one week, from September 11, 2026, to September 18, 2026. 2. Clarify Bidder Inquiry Deadline: The bidder inquiry provision is revised from: No response will be posted to inquiries after Close of Business on the seventh business day preceding the solicitation due date to: The deadline for submission of bidder inquiries is Close of Business on the seventh business day preceding the solicitation due date. Inquiries received after this deadline may not be answered. 3. Add Pertinent Documents/Attachments: The following six (6) documents/attachments are hereby added to the solicitation: A9 - Work Space Access Trailer and Parking Location, A10 - Pump Access, A11 - Propeller Condition, A12 - JDA Fish Pump rehab drawings, A13 - SouthFishwayPumps_OandM Manual, A14 - SouthFishTurbine-Unit3_OandM Manual (all documents previously designated as CUI have been downgraded) 4. Remove Attachment: Attachment AMD0002_Technical Sections.pdf is hereby removed from the solicitation. 5. Revise Specifications: The following revisions are hereby incorporated into the solicitation specifications: File Section Changes Specifications 15 00 00.03 25 Paragraph 1.4.2 is revised to change pump shaft assembly and propeller assembly to vertical shaft assembly. Paragraph 2.1.2 is revised to change pumpshaft to pump propeller. Specifications 01 10 10.00 25 Paragraph 1.6.b is amended to extend the outage window through June 30, 2028.Specifications 09 97 02.00 25 Paragraph 3.5 is amended to include the extension shaft in the painting schedule. All other terms and conditions of the solicitation remain unchanged.*Amendment 0001 - The purpose of this amendment is to extend the solicitation closing date by two weeks from August 28, 2026 to September 11, 2026. All other terms and conditions of the solicitation remain unchanged. PROJECT TITLE: JOHN DAY FISH PUMP REHABILITATION PROJECT LOCATION: JOHN DAY LOCK AND DAM, RUFUS, OR DESCRIPTION: REMOVAL, REFURBISHMENT, AND REPLACEMENT OF MAJOR COMPONENTS OF FISH PUMP UNIT 1, INCLUDING BUT NOT LIMITED TO SHAFTS, BEARINGS, BEARING BRACKETS, AND RIGHT-ANGLE DRIVE GEARBOXES. MAGNITUDE OF CONSTRUCTION: BETWEEN $5,000,000 - $10,000,000 NAICS: 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION SIZE STANDARD: $45,000,000 SOCIO-ECONOMIC CONSIDERATIONS: TOTAL SMALL BUSINESS SET-ASIDE Bid Opening: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT). Will send TEAMs link once BID is received. Due to CMMC access requirements, in order to gain access to CUI attachments, please verify your organization has a minimum CMMC Level 1 Self verification and submit your CMMC Unique Identifier Number and CAGE Code via email to joseph.b.jarvis@usace.army.mil and cory.r.pfenning@usace.army.mil. BIDS DUE: Friday, September 18th, 2026, at 09:00 PM Pacific Daylight Time (PDT). BID OPENING: Monday, September 21st, 2026, at 10:00 AM Pacific Daylight Time (PDT).
66%
Solicitation09/21/2026
Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles must be installed inside three existing and one new 1-story control shelter at locations specified in the contract drawings. The control shelter must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contractdrawings.New buckets and supporting equipment must be installed inside existing motor control centers (MCCs). New hardware and power and control cabling must be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe. A geotechnical and civil site analysis must be completed to confirm the structural integrity of all foundations for all new project components and to confirm proper drainage. Minimal new steel grating must be required for placement over top new concrete utility trenches. All new hydraulic and controls equipment must be tested and commissioned prior to project handoff. This project is to be completed at a locks and dam site along the Ohio River and thus requires the use of a floating work plant and work boat(s) for construction. Also, all as-built drawings must be stamped by a registered PE.The work shall be completed within 730 after written Notice to Proceed.The acquisition will be procured as 100% Set-Aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Offerors are encouraged to participate. The Request for Proposal (RFP) will be issued on or about 18 June 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.The North American Industrial Classification System (NAICS) Code for this acquisition is 237990 - 0ther Heavy and Civil Engineering Construction.The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit an Offer on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) RegistrationRegistering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select Get Started button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance. 30 June 2026 - Amendment 0001 issued. 23 July 2026 - Amendment 0002 Issued 31 July 2026 - Amendment 0003 issued. 13 August 2026 - Amendment 0004 issued.
66%
Solicitation08/20/2026
Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles must be installed inside three existing and one new 1-story control shelter at locations specified in the contract drawings. The control shelter must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contractdrawings.New buckets and supporting equipment must be installed inside existing motor control centers (MCCs). New hardware and power and control cabling must be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe. A geotechnical and civil site analysis must be completed to confirm the structural integrity of all foundations for all new project components and to confirm proper drainage. Minimal new steel grating must be required for placement over top new concrete utility trenches. All new hydraulic and controls equipment must be tested and commissioned prior to project handoff. This project is to be completed at a locks and dam site along the Ohio River and thus requires the use of a floating work plant and work boat(s) for construction. Also, all as-built drawings must be stamped by a registered PE.The work shall be completed within 730 after written Notice to Proceed.The acquisition will be procured as 100% Set-Aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Offerors are encouraged to participate. The Request for Proposal (RFP) will be issued on or about 18 June 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.The North American Industrial Classification System (NAICS) Code for this acquisition is 237990 - 0ther Heavy and Civil Engineering Construction.The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit an Offer on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) RegistrationRegistering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select ?Get Started? button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ? ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.
66%
Pre-Solicitation06/18/2026

Additional Details

Solicitation Number

140L0622R0038

Archive Date

Feb 15, 2023

Office Address

DENVER, CO, 80225